You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Flexible Low Temperature CO2 Capture System, E-CACHYS

    SBC: ENVERGEX LLC            Topic: 1

    This project focuses on the design, integration and optimization of a flexible natural gas combined cycle plant with carbon capture, capable of operating in a highly variable renewable energy environment. Renewable energy sources such as wind and solar power offer unique solutions in our quest to reduce global carbon dioxide (CO2) emissions. However, the increasing penetration of these high variab ...

    STTR Phase II 2020 Department of EnergyARPA-E
  2. High Power UVC Light Emitting Diodes for Disinfection Applications

    SBC: ADROIT MATERIALS, INC.            Topic: A18BT006

    Based on the successful completion of the Phase II effort that demonstrated state-of-the-art UVC LEDs with emission around 265 nm and output power of 25 mW (unpackaged device), a continuation of this effort is proposed. The objectives of the sequential Phase II effort will focus on (a) improving the developed UVC LEDs in terms of efficiency and output power, (b) demonstration of novel packaging sc ...

    STTR Phase II 2023 Department of DefenseArmy
  3. Integrated Ferrite Inductors and Transformers for Power Electronics with Ultra-low SWAP-C

    SBC: WINCHESTER TECHNOLOGIES LLC            Topic: A16020

    State-of-the-art power electronics use discrete components such as power magnetic inductors and transformers operating at < 1MHz, which suffer from a large SWAP-C (size, weight, power consumption, and cost). It has been challenging to achieve simultaneously high inductance, compact size, and high quality factors at 1~300MHz for integrated power electronics. In the completed Phase II Army STTR Phas ...

    STTR Phase II 2023 Department of DefenseArmy
  4. Roll-to-roll fabrication of a large-area plasmonic metamaterial with a prescribed LWIR spectral signature

    SBC: SMART MATERIAL SOLUTIONS INC            Topic: A19057

    Smart Material Solutions, Inc. (SMS), Professor Mark Mirotznik’s group at the University of Delaware (UD), and MicroContinuum, Inc. have combined their unique skillsets to design plasmonic metamaterials with tunable LWIR absorption spectra and develop highly scalable roll-to-roll (R2R) processes to fabricate large-area metamaterials through a Phase II SBIR project that will conclude in May 2023. ...

    STTR Phase II 2023 Department of DefenseArmy
  5. Improved Technology to Treat Drug-Resistant Bacterial Infections

    SBC: TRITON SYSTEMS, INC.            Topic: A21CT010

    Bacterial infections are particularly significant for military personnel in situations where there may be a long delay between the injury and treatment at a hospital or clinic. The development of an effective, portable light-based system which can operate in both military hospitals and far-forward situations is proposed. The proof-of-concept prototype developed in Phase I will be refined to be mor ...

    STTR Phase II 2023 Department of DefenseArmy
  6. Vehicle Root of Trust- Cryptography and Cybersecurity

    SBC: SECMATION LLC            Topic: A21CT022

    Cybersecurity of modern automotive systems is a growing concern. Modern vehicles continue to rapidly grow in functionality to support autonomous driving, electrification, and advanced user interfaces. Cyber-attacks on commercial vehicles could result in significant safety, privacy, and availability issues. Military vehicles have additional concerns. They must function in contested environments tar ...

    STTR Phase II 2023 Department of DefenseArmy
  7. Computationally Driven Reliability &amp; Repeatability for Wire Arc Additive Manufacturing of High Strength Maraging 250 Steel

    SBC: SOLVUS GLOBAL LLC            Topic: A21CT023

    Challenge: Reliable & repeatable production of large format, high performance components that are difficult to source using conventional casting and forging methods. We will Deliver: A physics-based modeling framework that enables reliable and repeatable large-format component-level production of high strength (>200 ksi) Maraging Steel produced via Wire-Arc Additive Manufacturing (WAAM). Proposal: ...

    STTR Phase II 2023 Department of DefenseArmy
  8. Revolutionary RF Circuit Simulator for New Electronic Design and Analysis Capabilities

    SBC: VADUM INC            Topic: A20BT002

    Vadum and North Carolina State University (NCSU) will develop Simulation of Communications Circuits in the Time Domain using Reinforcement Learning (SCOUTER) – a novel machine-learning-enhanced RF circuit simulator that rapidly and accurately analyzes transient circuit behavior using complex time-frequency communications waveforms. SCOUTER will have the capability to simulate modern RF transceiv ...

    STTR Phase II 2022 Department of DefenseArmy
  9. Radar for Accelerated Breaching of Concrete Structures (RABCS)

    SBC: PHYSICAL SCIENCES INC.            Topic: A21CT012

    The US Army and other DOD forces occasionally need to breach reinforced concrete structures. There are several existing methods to assess the structural properties and predict reinforcement but each of these methods has specific deficiencies (e.g. to loud, too large, too inconsistent). Ground penetrating radar is a promising technology for non-destructive concrete substructure characterization but ...

    STTR Phase II 2023 Department of DefenseArmy
  10. Soldier-Integrated Radar Detection and Location (1022-004-004)

    SBC: SI2 TECHNOLOGIES, INC            Topic: A20BT024

    SI2 Technologies, Inc.(SI2) and the New Jersey Institute of Technology (NJIT) propose to build on their successful Phase I prototype radar detector and locator system, manufacturing a radar detector system that can be integrated with the existing warfighter uniform to increase soldier lethality by enabling undetected maneuvering in the presence of hostile radar surveillance. The system alerts to t ...

    STTR Phase II 2022 Department of DefenseArmy
US Flag An Official Website of the United States Government