You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Weather "Action-Chain" Enabler (ACE) Application

    SBC: BLUE STORM ASSOCIATES INC.            Topic: 834

    In this Phase II effort, PEMDAS Technologies and Innovations (PEMDAS), in collaboration with subcontractor Westover Studios, proposes to develop a functional prototype of the Weather “Action Chain” Enabler (ACE) application using the technologies identified, knowledge gained, and preliminary design conceived during the Phase I effort. As designed, the Weather ACE application will be a non-intr ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Under Keel Clearance- Risk Management System (UKC-RMS)

    SBC: W R SYSTEMS LTD.            Topic: 828

    The S‐100 specification is a new geospatial standard for hydrographic data, that is presently under development by the International Hydrographic Organization (IHO). Once the S‐100 based products and services are fully developed by the IHO, current datasets will be scheduled for obsolescence, and the Hydrographic Offices (HOs) will no longer produce them. Companies offering e‐navigation solu ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Under Keel Clearance Management in Support ofPrecision Navigation

    SBC: W R SYSTEMS LTD.            Topic: 828

    TECHNICAL ABSTRACT: WR’s approach involves design of a modular, S-129 compliant Under Keel Clearance - Risk Management System (UKC-RMS). This will allow for the Electronic Chart Display and Information System (ECDIS), ECS, PPUs, and other situational awareness applications to have S-129 Exchange Sets developed for a planned route.In WR’s design, a system such as an ECDIS generates an S40X Rout ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Train Reporting And Inspection INdex (TRAIN)

    SBC: BENTEN TECHNOLOGIES, INC.            Topic: 151FR5

    Benten Technologies proposes to develop a back-end schema-less, open source, cloud-based database with front-end browser-based, cross-platform JavaScript model library to support locomotive inspection data collection. TRAIN will allow for the logging of inspection data for all types of locomotives including steam, diesel, diesel-electric, and electric locomotives by railroad and locomotive manufac ...

    SBIR Phase II 2017 Department of Transportation
  5. The Marine Debris and Small Object Mapping (DSOM) Radar System)

    SBC: REMOTE SENSING SOLUTIONS, INC.            Topic: 824D

    The DSOM system realized in a Phase II effort will provide a modular, compact and reconfigurable system with the ability to provide unique and new information about the scene of interest (e.g. temporal and height information) when compared with traditional SAR sensors. When compared with other imaging technologies, DSOM has the important advantages of being operable through cloud cover and at nigh ...

    SBIR Phase II 2017 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Technological Enhancements to Improve and Expand Casual Carpooling in New Corridors

    SBC: APPLIED ENGINEERING MANAGEMENT CORPORATION            Topic: 161FH1

    Technological Enhancements to Improve and Expand Casual Carpooling in New Corridors 12/05/2016 The overall goal of Phase II of this SBIR project is to demonstrate a working prototype of one or more tools and/or approaches that catalyze casual carpooling in a corridor where it does not exist or to improve casual carpooling in a corridor where it is present but underperforming. Phase II will provi ...

    SBIR Phase II 2017 Department of Transportation
  7. Riptide Hypoxic Zone AUV

    SBC: Riptide Autonomous Solutions, LLC            Topic: 827

    TECHNICAL ABSTRACT: Buoyancy driven oceanographic gliders, although reasonably cost effective, have challenges operating in the zones due to high gradients in water density. Under this topic, Riptide will provide a cost-effective autonomous undersea vehicle (AUV) design leveraged from Riptide's family of man-portable AUVs that can more effectively map the hypoxic areas. The stated goals of this to ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  8. Ride Performance Assessment System (RPAS)

    SBC: DFUZION, INC.            Topic: 151FR9

    To address FRA’s requirements of measuring rail vehicle suspension displacement and integrating this into existing accelerometer-based ride quality systems, dFuzion proposes the development of a comprehensive Ride Performance Assessment System (RPAS). RPAS will leverage the investment and research already made by FRA in its sponsored portable ride quality meter. By extending the ride quality dat ...

    SBIR Phase II 2017 Department of Transportation
  9. Response-Based Parameter Estimation for Determining Unknown Bridge Foundations

    SBC: INFRASENSE, INC.            Topic: N/A

    Evaluation of bridges for vulnerability to scour or other potential sources of damage requires knowledge of foundation conditions beneath piers and abutments that are often unknown. INFRASENSE proposed to develop and demonstrate a response-based parameter estimation method (RPEM) which will address the need for a simple, low-cost system for unknown foundation evaluation. The RPEM system is based ...

    SBIR Phase II 1998 Department of Transportation
  10. "Big Eye" Binoculars Extension Kit for Automating Bearing/Range Measurement and Image Storage

    SBC: R3 DIGITAL SCIENCES, INC.            Topic: 823

    TECHNICAL ABSTRACT: R3 Digital Sciences, Inc. (R3-DS) proposes to develop and commercialize an extension kit for "Big-Eye" and other binoculars that will automatically compute and store distance and bearing assessments by combining vertical reticle and stereoscopy measurement with motion analysis techniques. It will also capture and store photographic and video evidence of what the observer sees t ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government