You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Weather "Action-Chain" Enabler (ACE) Application

    SBC: BLUE STORM ASSOCIATES INC.            Topic: 834

    In this Phase II effort, PEMDAS Technologies and Innovations (PEMDAS), in collaboration with subcontractor Westover Studios, proposes to develop a functional prototype of the Weather “Action Chain” Enabler (ACE) application using the technologies identified, knowledge gained, and preliminary design conceived during the Phase I effort. As designed, the Weather ACE application will be a non-intr ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Video to Feature Data Association and Geolocation

    SBC: NOVATEUR RESEARCH SOLUTIONS LLC            Topic: NGA181007

    This SBIR Phase I project proposes a probabilistic approach to determine a vehicles location using onboard video sensors and foundationalmap data. The system does not rely on only one type of information source, instead it combines proposals from a variety of locationestimators to find a vehicles location in GPS-denied environments.The system takes advantage of recent advancements in computer visi ...

    SBIR Phase I 2018 Department of DefenseNational Geospatial-Intelligence Agency
  3. Video to Feature Data Association and

    SBC: NOVATEUR RESEARCH SOLUTIONS LLC            Topic: NGA181007

    This SBIR Phase II project proposes a probabilistic approach to determine a vehicle’s location using onboard video and Lidar sensors and foundation map data in GPS denied environments. The proposed system does not rely on only one type of information source, instead it combines proposals from a variety of location estimators to find a vehicles location in GPS-denied environments. The system take ...

    SBIR Phase II 2019 Department of DefenseNational Geospatial-Intelligence Agency
  4. Under Keel Clearance- Risk Management System (UKC-RMS)

    SBC: W R SYSTEMS LTD.            Topic: 828

    The S‐100 specification is a new geospatial standard for hydrographic data, that is presently under development by the International Hydrographic Organization (IHO). Once the S‐100 based products and services are fully developed by the IHO, current datasets will be scheduled for obsolescence, and the Hydrographic Offices (HOs) will no longer produce them. Companies offering e‐navigation solu ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Under Keel Clearance Management in Support ofPrecision Navigation

    SBC: W R SYSTEMS LTD.            Topic: 828

    TECHNICAL ABSTRACT: WR’s approach involves design of a modular, S-129 compliant Under Keel Clearance - Risk Management System (UKC-RMS). This will allow for the Electronic Chart Display and Information System (ECDIS), ECS, PPUs, and other situational awareness applications to have S-129 Exchange Sets developed for a planned route.In WR’s design, a system such as an ECDIS generates an S40X Rout ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  6. The S0 UAS, and Air Deployed Solution for Boundary Layer Observations in Turbulent Environment

    SBC: BLACK SWIFT TECHNOLOGIES LLC            Topic: 8213

    TECHNICAL ABSTRACT: Previous efforts have demonstrated that targeted observations of tropical storms by UAS can provide extremely valuable data sets for improving forecasts and models, but are also difficult to obtain. A number of obstacles including regulations and the distance required to intercept evolving storms have limited the number of land based flights. The use of airborne deployed UAS ha ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  7. The S0 UAS, an Air Deployed Solution for Boundary Layer Observations in Turbulent Environments

    SBC: BLACK SWIFT TECHNOLOGIES LLC            Topic: 8213

    Previous efforts have demonstrated that targeted observations of tropical storms by UAS can provide extremely valuable data sets for improving forecasts and models, but are also difficult to obtain. A number of obstacles including regulations and the distance required to intercept evolving storms have limited the number of land based flights. The use of airborne deployed UAS have recently overcome ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  8. The Marine Debris and Small Object Mapping (DSOM) Radar System)

    SBC: REMOTE SENSING SOLUTIONS, INC.            Topic: 824D

    The DSOM system realized in a Phase II effort will provide a modular, compact and reconfigurable system with the ability to provide unique and new information about the scene of interest (e.g. temporal and height information) when compared with traditional SAR sensors. When compared with other imaging technologies, DSOM has the important advantages of being operable through cloud cover and at nigh ...

    SBIR Phase II 2017 Department of CommerceNational Oceanic and Atmospheric Administration
  9. Speed-Accuracy Measures for Distributed Interactive Simulation of Nuclear Weapons Effects

    SBC: Pacific-sierra Research Corp.            Topic: N/A

    Using distributed interactive simulation (DIS) to conduct effective training, analyses, or mission support in a tactical nuclear weapons effects (NWE) environment requires realistic computer generated forces (CGF) that are sensitive to such effects. This level of sensitivity requires CGF to apply valid and reliable speed-accuracy measures of environmental effects on human performance within the D ...

    SBIR Phase II 1998 Department of DefenseNational Geospatial-Intelligence Agency
  10. SatCAT: The Satellite Charging Assessment Tool

    SBC: SPACE HAZARDS APPLICATIONS LLC            Topic: 842W

    The purpose of this project is to develop a Satellite Charging Assessment Tool (SatCAT) that will provide satellite operators/manufacturers with information to quickly and confidently determine whether anomalous satellite behavior observed on orbit results from changes in the space radiation environment. The intense radiation surrounding Earth can damage electronic components causing temporary mal ...

    SBIR Phase II 2017 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government