You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ZnS Scintillator for High Resolution X-ray Imaging at 9keV

    SBC: CERANOVA CORP            Topic: DMEA15B001

    Novel scintillator materials are needed to address the requirements of fast, high resolution x-ray microscopy, including higher stopping power and light yields. Achieving the required high efficiency and high spatial resolution is challenging and depends strongly on the scintillator characteristics. Knowledge of the details of the trap states can lead to significantly reduced afterglow and fast ...

    SBIR Phase I 2016 Department of DefenseDefense Microelectronics Activity
  2. Zero-HERO Inductive Link

    SBC: TRITON SYSTEMS, INC.            Topic: N171006

    Triton Systems will develop an inductive link for use in Navy aircrafts to send configuration data to individual rockets within a launcher before launch. The proposed solution will remove the need for umbilicals on the current system and provide a wireless connectivity capability. During Phase I, Triton proposes to build a test model to demonstrate our systems capability to send wireless data to i ...

    SBIR Phase I 2017 Department of DefenseNavy
  3. Xenon Production by Iodine Transmutation

    SBC: BUSEK CO., INC.            Topic: N/A

    Electrostatic thrusters are the likely choice for station keeping of the new generation of small communication satellites. Xenon is the fuel of choice for these thrusters because of its high mass and low ionization potential. Existing worldwide xenon production will not permit fueling of more than a small fraction of the projected satellite population unless significant price increase of Xe is rea ...

    SBIR Phase I 1998 Department of DefenseMissile Defense Agency
  4. X-Band and Ka Band Low Noise Block Downconverter

    SBC: Custom Mmic Design Services, Inc.            Topic: AF103178

    Custom MMIC Design Services has significant experience in the design, characterization and destruction testing of MMW LNAs. We have successfully designed X-band LNAs on GaAs with sub 1dB noise figures. These designs have been shown to survive up to 1W of RF power with no input protection. CMDS has also designed diode based limiter circuits to extend that protection to 6W. Our innovative design tec ...

    SBIR Phase I 2011 Department of DefenseAir Force
  5. X-Band and Ka Band Low Noise Block Downconverter

    SBC: Auriga Measurement Systems LLC            Topic: AF103178

    Phase I tasks will determine the integration plan for the block downconverters used in satellite communication systems. The anticipated advantage of using GaN HFETs for limiter/LNA combination will be quantified. The concept will be verified by device characterization, modeling and a prototype amplifier demonstration. MMIC amplifiers will be designed for the final goals, to be completed and fabric ...

    SBIR Phase I 2011 Department of DefenseAir Force
  6. 100-W Quantum Cascade Laser (QCL) Bars and 1-kW QCL Stacks

    SBC: TeraDiode, Inc.            Topic: N142093

    There is a compelling need for compact high brightness mid-wavelength infrared (MWIR) lasers. Applications of such sources include spectroscopic detection of the fingerprint of molecular absorptions, illumination, electronic warfare (EW), and infrared countermeasure (IRCM) systems in response to increasingly sophisticated seeker technologies and increased threat ranges. Todays state-of-the-art hig ...

    SBIR Phase I 2014 Department of DefenseNavy
  7. Workflow Management and Prioritization for Allocator and Assessor Processing

    SBC: DEUMBRA, INC.            Topic: N/A

    The current problem of handling thousands of workflows and hundreds of tasks associated with these workflows within the current ALP architecture is enormous. In this effort we propose efficient and scalable data structure and algorithms that can order the workflows and associated tasks to be processed by the Assessor. In addition, we provide the capability to correlate workflows with actual logi ...

    SBIR Phase I 1998 Department of DefenseDefense Advanced Research Projects Agency
  8. Wireless, Time-synchronized, Event Control System

    SBC: McQ Inc.            Topic: AF103236

    ABSTRACT: The objective of this proposal is to demonstrate the feasibility of producing a wide-area, wireless, time-synchronized event controller system (WTECS). The proposed solution will provide a reliable, low cost, non-intrusive system that can record sensor data, control events, and display data in real time by employing a distributed network of wireless event controllers. BENEFIT: There i ...

    SBIR Phase I 2011 Department of DefenseAir Force
  9. Wireless, Time-synchronized, Event Control System

    SBC: McQ Inc.            Topic: AF103236

    ABSTRACT: McQ Inc. developed a prototype Wireless Time-synchronized Event Control System (WTECS) for the 846th Test Squadron operating the Holloman High Speed Test Track (HHSTT) at Holloman Air Force Base. The current state of WTECS is TRL6 and MRL 9, while the desired end state of the transition effort is TRL7 and MRL 10. Improvements such as developing a database for the base station will all ...

    SBIR Phase II 2014 Department of DefenseAir Force
  10. Wireless Sensor Network powered by Energy Harvesting Solution Network

    SBC: Prime Photonics, LC            Topic: AF103201

    ABSTRACT: Turbine engine performance, efficiency, and reliability can be greatly improved if additional and evolving instrumentation can be added for input to the FADEC and PHM systems. As this additional instrumentation becomes a larger percentage of the engine"s total life cycle cost; the need to reduce maintenance and installation overhead for new instrumentation becomes increasingly importan ...

    SBIR Phase I 2011 Department of DefenseAir Force
US Flag An Official Website of the United States Government