You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Train Reporting And Inspection INdex (TRAIN)
SBC: Benten Technologies Inc Topic: 151FR5Benten Technologies proposes to develop a back-end schema-less, open source, cloud-based database with front-end browser-based, cross-platform JavaScript model library to support locomotive inspection data collection. TRAIN will allow for the logging of inspection data for all types of locomotives including steam, diesel, diesel-electric, and electric locomotives by railroad and locomotive manufac ...
SBIR Phase II 2017 Department of Transportation -
Traffic Intersection Simulation of IntelliDrive, J2735, and DSRC/WAVE with eTEXAS
SBC: Harmonia Holdings Group, LLC Topic: 101FH3We accelerate the maturity of IntelliDrive applications and unlock the storehouse of modeling detail in TEXAS to organizations building IntelliDrive applications J2735/Dedicated Short Range Communication (DSRC) signal controllers and on-board IntelliDrive systems. We add four SAE J2735 messages: SPAT MapData Basic Safety Messages and Signal Request Message for emergency vehicle preemption. Mapping ...
SBIR Phase II 2011 Department of Transportation -
The Marine Debris and Small Object Mapping (DSOM) Radar System)
SBC: REMOTE SENSING SOLUTIONS, INC. Topic: 824DThe DSOM system realized in a Phase II effort will provide a modular, compact and reconfigurable system with the ability to provide unique and new information about the scene of interest (e.g. temporal and height information) when compared with traditional SAR sensors. When compared with other imaging technologies, DSOM has the important advantages of being operable through cloud cover and at nigh ...
SBIR Phase II 2017 Department of CommerceNational Oceanic and Atmospheric Administration -
Technological Enhancements to Improve and Expand Casual Carpooling in New Corridors
SBC: APPLIED ENGINEERING MANAGEMENT CORPORATION Topic: 161FH1Technological Enhancements to Improve and Expand Casual Carpooling in New Corridors 12/05/2016 The overall goal of Phase II of this SBIR project is to demonstrate a working prototype of one or more tools and/or approaches that catalyze casual carpooling in a corridor where it does not exist or to improve casual carpooling in a corridor where it is present but underperforming. Phase II will provi ...
SBIR Phase II 2017 Department of Transportation -
Stress and Geometry Imaging from Outside the Pipeline
SBC: Jentek Sensors, Inc. Topic: 111PH1There is a well defined, yet unfulfilled need for a convenient (non-contact, light weight) and rapid imaging tool for multi-directional, thru-wall stresses (both applied and residual) from the outside of a pipeline. Quantitative stress imaging is needed at mechanical damage and corrosion sites, as well as at other critical locations (dents, bends, etc.). JENTEK is uniquely positioned to deliver ...
SBIR Phase I 2011 Department of Transportation -
Ride Performance Assessment System (RPAS)
SBC: DFUZION, INC. Topic: 151FR9To address FRA’s requirements of measuring rail vehicle suspension displacement and integrating this into existing accelerometer-based ride quality systems, dFuzion proposes the development of a comprehensive Ride Performance Assessment System (RPAS). RPAS will leverage the investment and research already made by FRA in its sponsored portable ride quality meter. By extending the ride quality dat ...
SBIR Phase II 2017 Department of Transportation -
Response-Based Parameter Estimation for Determining Unknown Bridge Foundations
SBC: Infrasense, Inc. Topic: N/AEvaluation of bridges for vulnerability to scour or other potential sources of damage requires knowledge of foundation conditions beneath piers and abutments that are often unknown. INFRASENSE proposed to develop and demonstrate a response-based parameter estimation method (RPEM) which will address the need for a simple, low-cost system for unknown foundation evaluation. The RPEM system is based ...
SBIR Phase II 1998 Department of Transportation -
Portable Active Thermographic Coating Inspection System
SBC: Fuchs Consulting Inc Topic: 091FH2This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. The system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-shel ...
SBIR Phase II 2011 Department of Transportation -
Pedestrian and Cyclist Detection Devices for Transit Buses
SBC: Novateur Research Solutions, LLC Topic: 161FT1This SBIR proposal presents a robust and cost-effective pedestrian and cyclist detection and collision warning system for transit buses. It uses inexpensive but robust sensors and incorporates state-of-the-art object detection techniques to enable effective pedestrian and cyclist detection near transit buses in different environmental conditions. The proposed collision warning system exploits meas ...
SBIR Phase II 2017 Department of Transportation -
N/A
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation