You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Xenon Production by Iodine Transmutation

    SBC: BUSEK CO., INC.            Topic: N/A

    Electrostatic thrusters are the likely choice for station keeping of the new generation of small communication satellites. Xenon is the fuel of choice for these thrusters because of its high mass and low ionization potential. Existing worldwide xenon production will not permit fueling of more than a small fraction of the projected satellite population unless significant price increase of Xe is rea ...

    SBIR Phase I 1998 Department of DefenseMissile Defense Agency
  2. Wide Bandgap Heterojunction Bipolar Transistors for X-Band

    SBC: INTRINSIC SEMICONDUCTOR CORP.            Topic: N/A

    In this Phase I STTR, Sterling Semiconductor--in cooperation with the University of Colorado at Boulder--will develop novel heterojunction bipolar transistor (HBT) semiconductor devices for microwave applications. Specifically, the team will develop I gallium nitride (GaN)/silicon carbide (SIC) N-p-n HBTs, consisting of a gallium nitride emitter on a p-type silicon carbide base and an e-type silic ...

    STTR Phase I 1998 Department of DefenseMissile Defense Agency
  3. Wavefront Simulator for 21st Century

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: MDA10004

    With the rapid strides in various avionics-related technologies, the need for advanced simulators will increase. Anti-jam receiver development and future improvements in PNT are critically dependent on the availability of advanced simulators. The needs include: flexible, accurate, adaptable, programmable, user-friendly, hardware in the loop operation, precise wavefront simulation, high dynamics, e ...

    SBIR Phase I 2011 Department of DefenseMissile Defense Agency
  4. Vis/IR Atmospheric Tool (VISIRAT)

    SBC: SPECTRAL SCIENCES, INC            Topic: MDA16009

    MDA Model and Simulation capabilities include Core Truth models capable of simulating all physics governing missile detection, tracking and intercept events. A key component of the simulation tools is an accurate and fast atmospheric radiation model to describe the target signal propagation through the atmosphere to the sensor. Such a model should be designed to readily interface with existing sc ...

    SBIR Phase I 2017 Department of DefenseMissile Defense Agency
  5. Visible and Infrared Scenes for Tactical Environments

    SBC: COMPUTATIONAL PHYSICS, INC.            Topic: MDA10025

    Higher resolution optical sensors are driving requirements for highly detailed representations of natural background surfaces and man-made objects for real-time scene generators used in development of Ballistic Missile Defense Systems (BMDS). New methods are critically needed to represent such structures that are computationally efficient enough for scene generators to support the high frame rates ...

    SBIR Phase I 2011 Department of DefenseMissile Defense Agency
  6. Variable speed operation in hydroelectric

    SBC: BURNSHIRE HYDROELECTRIC LLC            Topic: 86

    Hydropower is now increasingly operated outside of original design conditions due to changing water availability and environmental induced operating parameters. Fifty percent of operational hydroelectric dams in the United States are 50 years or older and nearly all were designed to operate steadily as a primary base load resource. Compounding these issues is the increasing prevalence of intermitt ...

    SBIR Phase I 2017 Department of Agriculture
  7. Validation of a Multiple Food-borne Pathogen Detection and Strain-Level Identification Assay

    SBC: TESSARAE, LLC            Topic: 85

    The primary objectives of this Phase II project are to 1) validate performance of the prototype resequencing pathogen microarray application for detection and identification of selected food-borne pathogens, including varieties of viruses, bacteria and eukaryotic agents; 2) iterate and port the prototype application to a more practical, "market-friendly" product form factor that requires less expe ...

    SBIR Phase II 2011 Department of Agriculture
  8. Unified Interceptor Assignment Algorithms

    SBC: SCIENTIFIC SYSTEMS CO INC            Topic: MDA09026

    Detecting, localizing, and intercepting one or more missiles during ascent phase presents a daunting theoretical and practical challenge. Scientific Systems Company, Inc. of Woburn, MA, and its subcontractor, Lockheed Martin, propose a foundational, control-theoretic approach to such problems. It is based on the idea of mathematically modeling a multiplatform-multisensor-multitarget system as SING ...

    SBIR Phase II 2011 Department of DefenseMissile Defense Agency
  9. Unified Control-Theoretic Multi-Raid Sensor Management Algorithms

    SBC: SCIENTIFIC SYSTEMS CO INC            Topic: MDA10002

    Detecting, localizing, identifying, tracking, and intercepting multiple and dispersed missiles aimed at multiple and dispersed defended areas, presents a daunting theoretical and practical challenge. The Scientific Systems Company, Inc. team proposes a foundational, information-theoretic and controltheoretic approach. It is based on mathematically modeling a multiplatform-multisensor-multitarget s ...

    SBIR Phase I 2011 Department of DefenseMissile Defense Agency
  10. Ultra Wideband Advanced Antenna Systems for Air Vehicles (1000-198)

    SBC: SI2 TECHNOLOGIES, INC            Topic: N091041

    SI2 Technologies, Inc. (SI2) proposes to design and develop a multifunction conformal antenna system for UHF Flight Termination System (FTS), L-band Global Positioning System (GPS), and S-band Telemetry applications for the SM-3 family of missiles and other platforms. To reduce the depth of protrusion, axial length, and weight of the multifunction antenna while maintaining wide bandwidth and high ...

    SBIR Phase II 2011 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government