You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. The Marine Debris and Small Object Mapping (DSOM) Radar System)

    SBC: REMOTE SENSING SOLUTIONS, INC.            Topic: 824D

    The DSOM system realized in a Phase II effort will provide a modular, compact and reconfigurable system with the ability to provide unique and new information about the scene of interest (e.g. temporal and height information) when compared with traditional SAR sensors. When compared with other imaging technologies, DSOM has the important advantages of being operable through cloud cover and at nigh ...

    SBIR Phase II 2017 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Surveying Earth's Gravity with Unmanned Aerial Vehicles

    SBC: AURORA FLIGHT SCIENCES CORPORATION            Topic: 912RN

    To assist with the National Geodetic Survey’s federal mandate to provide accurate positioning—including heights—to all federal non-military mapping activities in the USA, Aurora Flight Sciences proposes to integrate a gravimetry payload on a unmanned aerial system (UAS). Potential options include using either an unmanned aerial vehicle (UAV) or an optionally piloted aircraft (OPA). An OPA ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  3. STATISTICAL PROCESS CONTROL OF ELECTRICAL PARAMETERS FOR SIMOX SOI

    SBC: IBIS TECHNOLOGY CORP.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Commerce
  4. Smart Manufacturing Workflow Environment

    SBC: NIMBIS SERVICES INC            Topic: N/A

    Nimbis in partnership with UCLA and Smart Manufacturing Leadership Coalition (SMLC) will provide an open workflow environment that supports the sequential execution of 3rd party APPS using net-worked information based modeling and data analytic technologies to integrate manufacturing intelligence across an entire manufacturing ecosystem. The SMWE leverages Nimbis commercial cloud technical analysi ...

    SBIR Phase I 2013 Department of CommerceNational Institute of Standards and Technology
  5. Query-Based Interoperability for Simulation of Composite Structures

    SBC: INTACT SOLUTIONS, INC            Topic: 9020673R

    We propose to design and implement a query-based approach to interoperable modeling and simulation of composite material structures, that usually contain the manufacturing recipe within their design. In Phase I, we established the feasibility of the approach using a demonstration scenario of CAD/CAE interoperability for assemblies. In Phase II, we propose to develop a series of use-case scenarios ...

    SBIR Phase II 2013 Department of CommerceNational Institute of Standards and Technology
  6. Optical Instrumentation for MEMS Oscillatory Parallel-Plate Rheometer

    SBC: AGILTRON, INC.            Topic: 9060563R

    Leveraging Agiltron’s industrial leading developments for optical measurement of motion in MEMS devices, we propose to use electro-optical sensors for measuring the displacement and gap in the NIST micro-rheometer. No electrical connections are required to the moving parts. All electronics and optics are removed from the chip so that it is inexpensive and disposable. A fixed, simple micro-fluidi ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  7. Optical Fiber Devices for Composite Process Monitoring

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    The primary objective of the Phase 1 program was the development of optical fiber devices and cost-effective signal conditioning systems to produce commercially available composite process monitoring systems. The tasks successfully completed during the Phase 1 effort are as follows: (1) examined the performance requirements of the optical fiber devices and demodulation systems for FT-IR- and fluor ...

    SBIR Phase I 1998 Department of Commerce
  8. N/A

    SBC: Spire Corporation            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Commerce
  9. Mariner Report Application (MARApp): Crowdsourcing Maritime Weather Conditions

    SBC: Liteweaver Technologies, Inc.            Topic: 826

    Metron proposes a software framework for crowd-sourcing weather observations in a maritime environment leveraging personal mobile devices. Our proposed App, the Mariner’s Report App (MARApp), draws data from existing sensors in modern smartphones and tablets, as well as meteorological sensors normally found on small marine vessels. Our architecture is modular, extensible, and readily adaptable t ...

    SBIR Phase I 2017 Department of CommerceNational Oceanic and Atmospheric Administration
  10. LOW COST PRE-FIRE DETECTOR

    SBC: Sensor Research And Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Commerce
US Flag An Official Website of the United States Government