You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Weather "Action-Chain" Enabler (ACE) Application

    SBC: BLUE STORM ASSOCIATES INC.            Topic: 834

    In this Phase II effort, PEMDAS Technologies and Innovations (PEMDAS), in collaboration with subcontractor Westover Studios, proposes to develop a functional prototype of the Weather “Action Chain” Enabler (ACE) application using the technologies identified, knowledge gained, and preliminary design conceived during the Phase I effort. As designed, the Weather ACE application will be a non-intr ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Under Keel Clearance- Risk Management System (UKC-RMS)

    SBC: W R SYSTEMS LTD.            Topic: 828

    The S‐100 specification is a new geospatial standard for hydrographic data, that is presently under development by the International Hydrographic Organization (IHO). Once the S‐100 based products and services are fully developed by the IHO, current datasets will be scheduled for obsolescence, and the Hydrographic Offices (HOs) will no longer produce them. Companies offering e‐navigation solu ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Under Keel Clearance Management in Support ofPrecision Navigation

    SBC: W R SYSTEMS LTD.            Topic: 828

    TECHNICAL ABSTRACT: WR’s approach involves design of a modular, S-129 compliant Under Keel Clearance - Risk Management System (UKC-RMS). This will allow for the Electronic Chart Display and Information System (ECDIS), ECS, PPUs, and other situational awareness applications to have S-129 Exchange Sets developed for a planned route.In WR’s design, a system such as an ECDIS generates an S40X Rout ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  4. The Marine Debris and Small Object Mapping (DSOM) Radar System)

    SBC: REMOTE SENSING SOLUTIONS, INC.            Topic: 824D

    The DSOM system realized in a Phase II effort will provide a modular, compact and reconfigurable system with the ability to provide unique and new information about the scene of interest (e.g. temporal and height information) when compared with traditional SAR sensors. When compared with other imaging technologies, DSOM has the important advantages of being operable through cloud cover and at nigh ...

    SBIR Phase II 2017 Department of CommerceNational Oceanic and Atmospheric Administration
  5. STATISTICAL PROCESS CONTROL OF ELECTRICAL PARAMETERS FOR SIMOX SOI

    SBC: IBIS TECHNOLOGY CORP.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Commerce
  6. Riptide Hypoxic Zone AUV

    SBC: Riptide Autonomous Solutions, LLC            Topic: 827

    TECHNICAL ABSTRACT: Buoyancy driven oceanographic gliders, although reasonably cost effective, have challenges operating in the zones due to high gradients in water density. Under this topic, Riptide will provide a cost-effective autonomous undersea vehicle (AUV) design leveraged from Riptide's family of man-portable AUVs that can more effectively map the hypoxic areas. The stated goals of this to ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  7. "Big Eye" Binoculars Extension Kit for Automating Bearing/Range Measurement and Image Storage

    SBC: R3 DIGITAL SCIENCES, INC.            Topic: 823

    TECHNICAL ABSTRACT: R3 Digital Sciences, Inc. (R3-DS) proposes to develop and commercialize an extension kit for "Big-Eye" and other binoculars that will automatically compute and store distance and bearing assessments by combining vertical reticle and stereoscopy measurement with motion analysis techniques. It will also capture and store photographic and video evidence of what the observer sees t ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  8. Phase II Commercialization of HABStats: A Harmful Algal Bloom Species, Toxin and Total Phytoplankton Identification System

    SBC: COASTALOCEANVISION, INC            Topic: 821

    In Phase I, we developed a prototype instrument for counting, sizing and identifying both non-toxic and toxic Harmful Algal Bloom (HAB) species. We did this by integrating three innovative technologies: High-throughput color, Light Field Imaging Flow Cytometry to acquire morphological information for each cell, Raman spectroscopy to acquire species-specific molecular information on pigments and tr ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  9. Optical Instrumentation for MEMS Oscillatory Parallel-Plate Rheometer

    SBC: AGILTRON, INC.            Topic: 9060563R

    Leveraging Agiltron’s industrial leading developments for optical measurement of motion in MEMS devices, we propose to use electro-optical sensors for measuring the displacement and gap in the NIST micro-rheometer. No electrical connections are required to the moving parts. All electronics and optics are removed from the chip so that it is inexpensive and disposable. A fixed, simple micro-fluidi ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  10. Optical Fiber Devices for Composite Process Monitoring

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    The primary objective of the Phase 1 program was the development of optical fiber devices and cost-effective signal conditioning systems to produce commercially available composite process monitoring systems. The tasks successfully completed during the Phase 1 effort are as follows: (1) examined the performance requirements of the optical fiber devices and demodulation systems for FT-IR- and fluor ...

    SBIR Phase I 1998 Department of Commerce
US Flag An Official Website of the United States Government