You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Portable “no-assembly” wideband antenna for HF broadcast

    SBC: PHYSICAL SCIENCES INC.            Topic: A07043

    In this Phase II SBIR Army Program, Physical Sciences Inc. will design, build, and test a novel high-gain, quasi-volumetric, directive antenna array comprising advanced single radiating elements that were demonstrated in Phase I. These single quasi-volumetric elements provide more directive pattern, greater bandwidth, and higher gain than conventional dipole antennas in less than half the linear ...

    SBIR Phase II 2008 Department of DefenseArmy
  2. MEMS Enhanced Laser Spectrometer for Ultra-sensitive Toxic Chemical Detection

    SBC: BLOCK MEMS LLC            Topic: A07135

    The Joint Services is seeking a miniaturized, low cost sensor for detection and identification of CWAs and TICs. To meet this requirement Block MEMS has very successfully completed a Phase I effort to develop a widely tunable MEMS enhanced Quantum Cascade Laser (QCL) spectrometer called LaserChemTM. LaserChemTM will have sensitivity in the parts per trillion, be under 1800 cm3 in size, have very l ...

    SBIR Phase II 2008 Department of DefenseArmy
  3. An Insecticide Matrix for Sand Fly and Mosquito Control in Severe Environments(1001-080)

    SBC: TRITON SYSTEMS, INC.            Topic: A06152

    Triton Systems, Inc. proposes to optimize further the insecticide system developed in Phase I. In Phase I, we showed that our insecticide system performed better than a commercial residual spray after heat or UV exposure. Our insecticide system will remain effective for an extended period time after application, even under harsh environmental conditions, to control mosquitoes and sand flies. In ad ...

    SBIR Phase II 2008 Department of DefenseArmy
  4. Modeling Encumbrance Effects of Ground Soldier Systems on Soldier Performance

    SBC: Technology Solutions Experts, Inc.            Topic: A07159

    A wealth of studies involving the effects of army materiel on ground soldier task performance exist, but the flow of data from these studies into ground soldier simulations is slow. Modeling these effects in a ground soldier simulation is important, because it takes into account factors that directly impact the ground soldier. Through continuing research, the Task-related Effects of Encumbrance ...

    SBIR Phase II 2008 Department of DefenseArmy
  5. “Smart” Chem-Bio-Nuclear Hardened Intermodal Shipping Container (1001-207)

    SBC: TRITON SYSTEMS, INC.            Topic: A06144

    Triton Systems, Inc. proposes to design, fabricate and test to ISO specification a low-cost, “Smart” Intermodal Module (SIM) container system that will be capable of being tracked, traced, inventory capable, and chemical-biological (Chem-Bio) attack hardened and meet the Department of Defense critical logistical requirement by providing In-Transit Visibility in operational theaters. The unique ...

    SBIR Phase II 2008 Department of DefenseArmy
  6. Integrated Clinical Environment Manager

    SBC: LIVEDATA, INC            Topic: A07148

    Advances in interoperability promise to take patient safety to a new level via the application of process control engineering. While the path to a fully engineered process is difficult, benefits accrue each step toward it. This project will advance us along this path by demonstrating a prototype "Context-Aware Notification System." By bringing together comprehensively 1) physiologic data, 2) pat ...

    SBIR Phase II 2008 Department of DefenseArmy
  7. Manufacturing Issues for Multimode Seeker Domes

    SBC: SURMET CORP            Topic: A07016

    The U.S. Army's Joint Air to Ground Missile (JAGM) and the Air Force Small Diameter Bomb (SDB) are two potential candidates for insertion of multi-mode seeker missiles technology. Surmet has recently demonstrated proof-of-principle multilayer missile domes for these seekers. But technical challenges remain in scaling the processes to manufacturing level. The amount of touch labor, reproducibility ...

    SBIR Phase II 2008 Department of DefenseArmy
  8. An Advanced Medical Robotic System Augmenting Healthcare Capabilities

    SBC: Hstar Technologies            Topic: A07146

    During Phase II period, Hstar plan to prototype an advanced mobile robotic nurse assistant (RoNA) system for augmenting nurses’ health care capabilities in a hospital environment with physical assistance. This RoNA system will: a) navigate intelligently in hospital environments with a mobile holonomic drive, b) support an intuitive interface guided by human-robot interaction and work safely and ...

    SBIR Phase II 2008 Department of DefenseArmy
  9. Cultural Assessments and Simulation of Military Information/Operations in Reaction and Response (CASMIRR) Phase II

    SBC: APTIMA INC            Topic: A06079

    In the battle to “win the hearts and minds” of civilians close to conflict, the U.S. armed services have had difficulty operating and interacting with cultures different from our own. This seems largely due to a lack of cultural intelligence. Specifically, the difficulty lies in understanding how culture applies to a given situation and how Soldiers’ actions will be construed within that c ...

    SBIR Phase II 2008 Department of DefenseArmy
  10. Passive Imaging Millimeter Wave Polarimeter System

    SBC: SPECIAL PROJECTS TEAM, LLC            Topic: A07125

    The objective of the Phase II Program is the successful development and demonstration of an airborne Sensor that simultaneously generates passive millimeter wave images of the terrain in all four Stokes Parameters. The Imaging Sensor will be the Baseline Configuration designed in Phase I. The performance capabilities of the Imager will be demonstrated in an airborne helicopter test. The flight tes ...

    SBIR Phase II 2008 Department of DefenseArmy
US Flag An Official Website of the United States Government