You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced Hybrid Thermoelectric-Solid Oxide Fuel Cell Energy Conversion for High Efficiency Portable Power
SBC: Atrex Energy, Inc. Topic: OSD08EP4The proposal would provide the design and basic product development work to augment the power generation efficiency of fuel cells developed by Acumentrics Corp. by converting waste heat into electricity by highly efficient thermoelectric (TE) power generation. Three paths will be explored in Phase I to add a TE generator to the SOFC. The first will explore the use of a material that is used in co ...
SBIR Phase I 2008 Department of DefenseNavy -
Marine Portable Power Unit
SBC: Atrex Energy, Inc. Topic: N06105A conceptual design of a battery charging station with UPS back-up capability was completed under contract M67854-C-6509. The resulting system can charge up to twelve BB-2590 batteries at the maximum charging current (to minimize charging time) and provide 1000 Watts of back-up power (both AC and DC outputs are provided) for at least one hour. Individual batteries can be hot-swapped for field us ...
SBIR Phase II 2008 Department of DefenseNavy -
Digital Method for Improved Custom Hearing Protection Equipment
SBC: ShapeStart Measurement Systems, Inc. Topic: N08153The DoD spends over $1 Billion annually on disability payments attributed to hearing loss, yet this can be prevented. Research shows that with proper hearing protection a 19% reduction in hearing loss cases can be expected. Custom ear plugs force the user to wear the devices correctly and to retain hearing protection during activity, thus eliminating improper seating issues as the primary cause o ...
SBIR Phase I 2008 Department of DefenseNavy -
Power Source Materials & Subcomponents Manufacturing Improvements
SBC: ADVANCED MEMBRANE SYSTEMS, INC. Topic: OSD05MT2Manufacturers of military batteries often need raw materials that may have long lead times, limited production and/or high costs. During Phase I of this project, Advanced Membrane Systems (AMS) made some modifications and improvements to one of its products (a lithium ion battery separator), and made it suitable for Li/SO2 cell applications. Phase II of this proposal is for qualification of batter ...
SBIR Phase II 2008 Department of DefenseNavy -
Next generation Combat System Development Approach
SBC: ADVANCED SOLUTIONS FOR TOMORROW, INC. Topic: N08183The design, development, testing, and maintenance of future complex combat systems will require new approaches and technologies. Present software technologies are limited by the fact that the computing system architectural layers and software components are not integrated. New software technologies are needed to adopt a more integrated view of the system architectural layers and software component ...
SBIR Phase I 2008 Department of DefenseNavy -
Multi-Level Security Smart Proxy Agent for Bandwidth and Time Constrained Users
SBC: ADVANCED SOLUTIONS FOR TOMORROW, INC. Topic: N07065The objective of the project outlined in this proposal is to design, build, test, and integrate a Communications Prioritization Tool (CPT) that will prioritize and optimize information exchange. Information exchange requires communication across multiple internal and external network systems utilizing a submarine’s limited external communications capability, multiple internal networked subsystem ...
SBIR Phase II 2008 Department of DefenseNavy -
An Ensemble Kalman Filtering Approach for Regional Ocean Data Assimilation
SBC: ATMOSPHERIC & ENVIRONMENTAL RESEARCH, INC. Topic: N06099Current and future operational needs of the Navy require the capability to combine very large and disparate datasets with dynamical ocean numerical models to produce, in real time, accurate analyses and forecasts together with respective uncertainty estimates for any littoral region of the globe. We propose to implement a highly scalable, portable and efficient ocean data assimilation system base ...
SBIR Phase II 2008 Department of DefenseNavy -
Variable Remapping of Airborne Imagery
SBC: AERODYNE RESEARCH INC Topic: N07018Cooperative targeting technologies enable F18 strike aircraft and tactical UASs (Unmanned Aircraft Systems) to work together to provide close air support, particularly in close-quarters urban combat. VRAI (“Variable Remapping of Airborne Imagery”) ties together these assets more effectively, speeding-up the visual cueing and confirmation bottleneck, insuring 1st-pass success. VRAI digitally ...
SBIR Phase II 2008 Department of DefenseNavy -
An Autonomous UAS Detect, Sense, and Avoid System (AU-DSA)
SBC: Aerotonomy, Incorporated Topic: N08079The proposing team will develop a practical, complete Autonomous UAS Detect, Sense, and Avoid (AU-DSA) system for safe and effective UAS operations within the National Airspace System (NAS) and outside of Special Use Airspace. The AU-DSA will incorporate a compact, flexible, state-of-the-art avionics system, innovative guidance algorithms designed to comply with FAA-mandated operating procedures, ...
SBIR Phase I 2008 Department of DefenseNavy -
WDM Based True Time Delay Array for Advanced RF Beamforming
SBC: AGILTRON, INC. Topic: N08167An innovative concept for a scalable true time delay (TTD) array for digital beamforming is proposed. The concept is photonics and fiber optic wavelength division multiplexing (WDM) based and will support transmit/receive applications over the 1 to 20 GHz, extendable up to V bands. The design provides a digitally controlled true time delay array for beamforming effectively adaptive to Navy phased ...
SBIR Phase I 2008 Department of DefenseNavy