You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Transparent Armor Materials and Manufacturing Methods

    SBC: SURMET CORP            Topic: SOCOM14002

    "Current glass-based transparent armor has two major deficiencies: 1) It is very heavy, and therefore can compromise performance and helicopter transportability of vehicles; and 2) It is very thick, and therefore can compromise visual signature of vehicles. Advanced technology ceramic transparent armor removes both these deficiencies and provides a twofold improvement in performance, but costs 6-1 ...

    SBIR Phase I 2014 Department of DefenseSpecial Operations Command
  2. The Intelligent Brace: A Compliance Monitoring System for Scoliosis

    SBC: LIBERATING TECHNOLOGIES INC            Topic: N/A

    Scoliosis, a condition where there is lateral curvature of the spine, affects an estimated 6 million people in the United States. There is widespread use of bracing for treatment of adolescent idiopathic scoliosis, and recent studies have begun documenting its efficacy. These studies have indicated that user compliance is a large, yet largely unquantified, factor in successful outcomes. There are ...

    SBIR Phase II 2014 Department of Education
  3. Inconspicuous Up-Armoring of Vehicles Using Segmented Ceramic and Metallic Elements

    SBC: TRITON SYSTEMS, INC.            Topic: SOCOM14003

    Triton Systems Inc.(Triton), together with our partner Technical Products Inc. (TPI) will conduct a feasibility study to evaluate options for armoring non standard commercial vehicles (NSCV) in an unobtrusive fashion using austere mechanical facilities corresponding to expedient basing in the area of operations. Triton has wide experience in metallic, ceramic and composite armoring solutions and ...

    SBIR Phase I 2014 Department of DefenseSpecial Operations Command
  4. Low Profile Closed Coolant System for High Speed Combatant Craft

    SBC: TIAX LLC            Topic: SOCOM14005

    High speed combatant craft utilized by SOCOM, such as the Riverine (SOC-R), use pumped raw water to provide engine cooling for the twin marine diesel engines. While raw water provides an essentially limitless heat sink, it often contains debris which can clog engine strainers, causing the engines to overheat. Thus, engine performance, as well as maintenance, is negatively affected by the use of th ...

    SBIR Phase I 2014 Department of DefenseSpecial Operations Command
  5. Therapeutic Intermittent Compression Socket

    SBC: LIBERATING TECHNOLOGIES INC            Topic: N/A

    The purpose of this project is to develop a device that provides rapid intermittent compression to the residual limb of amputees that do not have good blood flow in their limbs. The device will be built into the prosthetic socket to provide the user with portable therapy throughout the day, which will free the user from being confined to a chair for up to six hours each day to receive the prescrib ...

    SBIR Phase I 2014 Department of Education
  6. Socrative Learning Network

    SBC: Socrative Inc            Topic: N/A

    The project team is developing a prototype of the Socrative Learning Network, a website for teachers to share information to guide instructional practice. The website will support Socrative’s existing 600,000 registered teachers in creating, sharing, searching, and filtering assessments by content, grade, or user, with a mechanism for commentingedu on and editing questions. Pilot research in Pha ...

    SBIR Phase I 2014 Department of Education
  7. Expanding Supports for Data-Driven Language Instruction

    SBC: LingoJingo            Topic: N/A

    The project team will strengthen the functionality of Lingo Jingo, an on-line foreign language teaching and learning website, by adding lesson development capabilities, management tools, analytic capabilities, and activities aligned with commonly used language textbooks. The product will be used by middle and high school teachers to develop or modify classroom instruction, assign lessons, and prov ...

    SBIR Phase I 2014 Department of Education
  8. The Iowa Assessment of Skills and Knowledge for Automatic Word Recognition and Decoding (iASK)

    SBC: FOUNDATIONS IN LEARNING, INC.            Topic: N/A

    The project team is developing a prototype of an online word recognition assessment program for middle school students who are struggling readers. The assessment will address a variety of literacy skills including decoding, fluency, and word recognition. The product will generate formative assessment profiles of individual students for teachers to provide targeted instruction. In the Phase I pilot ...

    SBIR Phase I 2014 Department of Education
  9. FlorianEye

    SBC: PHYSICAL SCIENCES INC.            Topic: 81

    Based upon the PSI InstantEye sUAV platform, PSI will develop a high performance, low cost tactically employed, small UAV that willprovide on-demand overhead aerial video surveillance to firefighters actively engaged in containing wildfires.

    SBIR Phase I 2014 Department of Agriculture
  10. Mobile Factory Design for On-Site Wind Turbine Tower Production

    SBC: Keystone Tower Systems, Inc.            Topic: 86

    Larger, taller wind turbines could significantly reduce the cost of wind energy and enable much broader deployment. For example, a recent study from the National Renewable Energy Lab [NREL/TP-5000-61063] showed that increasing tower heights from 96m to 140m would nearly double the available wind resource in the US (adding 1,800 GW) and bring wind development to many areas where it is not currently ...

    SBIR Phase I 2014 Department of Agriculture
US Flag An Official Website of the United States Government