You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. A BORON ASSISTED COMBUSTION MODEL WITH SENSITIVITY ANALYSIS DEVELOPMENT

    SBC: Aerodyne Research, Inc.            Topic: N/A

    SOLID BORON HAS LONG BEEN RECOGNIZED AS A POTENTIAL HIGH VOLUMETRIC DENSITY PROPELLANT FOR VOLUME LIMITED ROCKET AND AIR BREATHING PROPULSION SYSTEMS. HOWEVER, ACHIEVING THIS POTENTIAL HAS BEEN DIFFICULT DUE TO LOW COMBUSTION AND HEAT RELEASE EFFICIENCIES IN CONVENTIONALLY DESIGNED COMBUSTORS. A THREE PHASE MODEL OF BORON ASSISTED COMBUSTION IS POSTULATED AND THE ROLE THAT KINETIC SENSITIVITY ANAL ...

    SBIR Phase II 1988 Department of DefenseAir Force
  2. HYPERVELOCITY OXYGEN SOURCE FOR THE STUDY OF ATOM-SURFACE INTERACTIONS

    SBC: Aerodyne Research, Inc.            Topic: N/A

    SPACE-BASED FACILITIES FACE AN UNEXPECTEDLY HOSTILE ENVIRONMENT AT ORBITAL ALTITUDES DUE TO CHEMICAL INTERACTIONS WITH ATOMIC OXYGEN AT THE HIGH VELOCITIES OF ORBITING SPACECRAFT. DEGRADATION AND EROSION OF MATERIALS FACING INTO THE ATMOSPHERIC WIND POSE A THREAT TO THE EFFECTIVE LIFE AND UTILITY OF SATELLITES, SPACE STATION SYSTEMS, AND EXPECIALLY SPACE-BASED OPTICAL INSTRUMENTATION. WE PROPOSE T ...

    SBIR Phase II 1988 Department of DefenseAir Force
  3. QUALITY ASSURANCE OF SURFACE MOUNTED PRINTED CIRCUIT BOARD ASSEMBLY SOLDER JOINTS

    SBC: American Science and Engineering, Inc.            Topic: N/A

    A HIGH SPATIAL RESOLUTION AND HIGH SENSITIVITY X-RAY IMAGING SYSTEM HAS BEEN DEVELOPED THAT IS APPROPRIATE FOR THE IN-PROCESS INSPECTION OF SURFACE MOUNTED PRINTED CIRCUIT BOARD ASSEMBLIES. IT IS A NEAR REAL-TIME SYSTEM THAT PRODUCES HIGH-QUALITY DIGITAL IMAGES CAPABLE OF PROVIDING QUANTITATIVE DATA FOR FEEDBACK TO THE ASSEMBLY SOLDERING AND OTHER SURFACE MOUNTED TECHNOLOGY MANUFACTURING PROCESSES ...

    SBIR Phase II 1988 Department of DefenseAir Force
  4. ANALYSIS/DEMONSTRATION OF ADVANCED AIR TRAFFIC CONTROL CONCEPTS

    SBC: Analysis & Computer Systems I            Topic: N/A

    THIS SOLICITATION RESPONSE DESCRIBES ACSI'S TEAM APPROACH IN DEFINING, ANALYZING AND EVALUATING THE FEASIBILITY OF THE NEW CONCEPTS PROPOSED FOR PERFORMING AIR TRAFFIC CONTROL (ATC) IN A TACTICAL WARTIME ENVIRONMENT. WE WILL SHOW HOW WE PROPOSE TO DEVELOP THE CONCEPTS SO THAT TERMINAL ATC SERVICES CAN BE MADE SAFE AND SURVIVABLE BY UPGRADING CURRENT EQUIPMENT TO INCORPORATE TECHNOLOGIES WHICH REDU ...

    SBIR Phase II 1988 Department of DefenseAir Force
  5. ELECTRO-OPTICAL UNIT TESTING

    SBC: Ateam Corp            Topic: N/A

    THE FOLLOWING TECHNICAL OBJECTIVES WILL BE ACHIEVED IN THIS STUDY: 1. ASSESS THE AUTOMATIC TEST REQUIREMENTS FOR ELECTRO-OPTICAL (E/O) UNITS UNDER TEST (UUTS). 2. IDENTIFY AUTOMATIC TEST EQUIPMENT (ATE) STANDARDS FOR TESTING ELECTRO-OPTICAL UNITS UNDER TEST (UUT). 3. IDENTIFY SUITABLE MATE TESTING METHODOLOGIES AND STANDARDS FOR INTERFACING ELECTRO-OPTICAL UUTS TO THE ATE. SURVEYS OF MAJOR AIR FOR ...

    SBIR Phase II 1988 Department of DefenseAir Force
  6. MATE INTERFACE CONNECTOR ASSEMBLY (ICA) STANDARD

    SBC: Ateam Corp            Topic: N/A

    THE MATE PROGRAM OFFICE HAS REQUESTED A REVIEW OF THE MATE GENERAL PURPOSE ELECTRICAL INTERFACE CONNECTOR STANDARD TO IMPROVE THE GUIDANCE TO DEVELOP THE MATE INTERFACE CONNECTOR ASSEMBLY (ICA). THIS STUDY WILL GATHER INFORMATION, ANALYZE THE RESULTS AND PROVIDE RECOMMENDATIONS TO VERIFY THAT THE ICA WILL MEET PROJECTED AIR FORCE TESTING REQUIREMENTS IN A COST EFFECTIVE MANNER. THE FOLLOWING TECHN ...

    SBIR Phase II 1988 Department of DefenseAir Force
  7. GROWTH OF GAAS CRYSTALS BY TEM FOR MICROWAVE DEVICE APPLICATIONS

    SBC: Crystal Systems, Inc.            Topic: N/A

    LARGE GAAS CRYSTALS WITH UNIFORM PROPERTIES AND LOW DEFECT DENSITIES ARE REQUIRED FOR MICROWAVE DEVICES FABRICATED FOR MILITARY SYSTEMS. THE VARIABLE QUALITY OF THE AVAILABLE GAAS, WAFER-TO-WAFER, INTRA WAFER, BOULE-TO-BOULE, AND INTRA BOULE IS UNSATISFACTORY FOR HIGHYIELD DEVICE PROCESSING. WHILE THE ELECTRONIC PROPERTIES OF LEC GAAS CRYSTALS ARE SATISFACTORY, THESE WAFERS SHOW VERY HIGH DEFECT D ...

    SBIR Phase II 1988 Department of DefenseAir Force
  8. THE EFFECTS OF MICROGRAVITY ON TWO-PHASE FLOWS

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    TWO-PHASE FLOWS WILL BE EMPLOYED IN MANY OF THE POWER GENERATION AND THERMAL MANAGEMENT SYSTEMS CURRENTLY UNDER DEVELOPMENT OR PROPOSED FOR FUTURE APPLICATION IN SPACE. WHILE THE PHENOMENA OCCURRING IN TWO-PHASE FLOW HAVE BEEN STUDIED EXTENSIVELY FOR EARTH-BOUND SYSTEMS, RELATIVELY LITTLE IS KNOWN ABOUT THE EFFECTS OF MICROGRAVITY ON TWOPHASE FLOWS. AN ORGANIZED RESEARCH EFFORT IS NEEDED TO PERMIT ...

    SBIR Phase II 1988 Department of DefenseAir Force
  9. EM GUN FOR LONG ROD PENETRATORS

    SBC: IAP RESEARCH, INC.            Topic: N/A

    THE OBJECTIVE OF THIS PROGRAM IS TO DEVELOP A MULTI-RAIL RAILGUN AND A MULTI-ARMATURE LONG ROD PENETRATORS FOR ANTI-ARMOR APPLICATION. PRELIMINARY ANALYSIS INDICATES THAT RODS OF L/D BETWEEN 20-30 CAN BE LAUNCHED TO VELOCITIES OF 2 TO 4 KM/S, SIGNIFICANTLY INCREASING THE PRESENT STATE-OF-THE-ART IN ANTI-ARMOR WEAPONRY. KEY TECHNICAL ISSUES ARE INTER-RAIL INSULATION OF THE MULTI-RAIL GUN AND ARMATU ...

    SBIR Phase II 1988 Department of DefenseAir Force
  10. CHEMICAL DETECTION OF NERVE AGENT BY A TWO STEP DOSIMETER SYSTEM BASED ON ENZYME INHIBITION INDICATED BY FLUORESCENCE

    SBC: Ord Inc.            Topic: N/A

    THE LONG TERM OBJECTIVE IS TO DEVELOP A RAPID "NERVE AGENT" DOSIMETER DETECTION SYSTEM AS SIMPLE, FIELDABLE AND RUGGED AS A PIECE OF WET, CHEMICALLY IMPREGNATED CLOTH. IT WOULD HAVE THE SENSITIVITY TO DETECT LESS THAN 1 NG/M(3) OF NERVE AGENT IN THE FIELD AND THE HIGH SPECIFICITY TO AGENT PHYSIOLOGICAL FUNCTION INHERENT TO ENZYME INHIBITION. EACH DOSIMETER WOULD WEIGHT LESS THAN 1/4 OZ. AND COST L ...

    SBIR Phase II 1988 Department of DefenseAir Force
US Flag An Official Website of the United States Government