You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Multimodal Acoustic Tool for Inline Pipe Inspection

    SBC: CREARE LLC            Topic: 180PH1

    The United States has a vast network of pipelines used for fuel transport. This infrastructure, installed in 1950–1970, is one of the largest in the world. Yet poor/missing records of the materials used, combined with the overall age and associated environmental degradation effects, often results in unsafe operation. Current non-destructive inspection techniques are only capable of detecting mat ...

    SBIR Phase II 2019 Department of Transportation
  2. Collaboration-Optimized Network for Naturalistic Exploration and Communication about Traffic

    SBC: APTIMA INC            Topic: 180NH2

    Current access to and analysis of the Fatal Analysis Reporting System (FARS) dataset requires significant time and technical skill. Data analysis tools are often general-purpose, designed to support the analysis of any dataset, and do not easily support the types of questions many transportation and safety engineers ask of the FARS data. Visualizations can help users understand relationships betwe ...

    SBIR Phase II 2019 Department of Transportation
  3. Long Life, Low Cost Mini-Roundabouts from Simple Modular Shapes and Recycled

    SBC: ZKXKZ LLC            Topic: 142FH3

    In Phase II, ZKxKZ designed, developed and demonstrated an approach for fabrication and rapid installation of low cost modular mini-roundabouts made from recycled plastic boards. Phase II culminated in the installation of one full modular mini-roundabout in both Georgia and Virginia. In addition, 3 modular mini-roundabouts were commercially sold and installed in Canada prior to the SBIR funded sit ...

    SBIR Phase II 2019 Department of Transportation
  4. NDI OF COMPOSITE STRUCTURAL MATERIALS BY GAMMA SCATTER SENSING

    SBC: Spire Corporation            Topic: N/A

    WITHOUT EFFECTIVE NONDESTRUCTIVE INSPECTION (NDI) MENTHODS, STRUCTURES EMPLOYING COMPOSITE MATERIALS MUST RELY ON LARGE DESIGN MARGINS OF SFETY AND EXPENSIVE INDIVIDUAL COMPONENT PROOF TESTING. OBJECTIVE OF THE PROPOSED PHASE I RESEARCH IS TO REMEDY THIS WITH GAMMA RAY SCATTERING COUNTING, A FORMOF RADIOMETRY WIDELY USED TO MEASURE THICKNESS AND COMPOSI- TION OF EMPHASIS ON DEVELOPING A PORTABLE S ...

    SBIR Phase I 1988 Department of Transportation
US Flag An Official Website of the United States Government