You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PROCESSING ALGORITHMS FOR SENSORS FUSION IN VISIBLE/IR/RADAR

    SBC: ALPHATECH, INC.            Topic: N/A

    THE OBJECTIVE OF THIS RESEARCH IS TO DEMONSTRATE THE FEASIBILITY OF FUSING DATA OBTAINED SIMULTANEOUSLY FROM VISIBLE, INFRARED AND RADAR SENSORS, TO PROVIDE A HERETOFORE UNOBTAINABLE SURVEILLANCE CAPABILITY.THE DIFFICULTIES ASSOCAITED WITH SENSOR FUSION WHICH WILL BE ADDRESSEDINCLUDE THE DIFFERENT FIELDS OF VIEW, DIFFERENT MEASUREMENTS, DIFFERENT RESOLUTIONS, AND DIFFERENT POSITIONS AND VELOCITIES ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  2. THE READY COURSE, AN INTERACTIVE VIDEODISC ASSISTED READING PROGRAM

    SBC: Applied Interactive Tech            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Education
  3. INDIVIDUALIZED INTERACTIVE VIDEO

    SBC: Duffy Engineering            Topic: N/A

    PROVIDING INDIVIDUALIZED INSTRUCTION FOR DISABLED STUDENTS IN SPECIAL EDUCATION PLACEMENTS IS A TIME-CONSUMING PROCESS FOR EDUCATORS AND THUS COSTLY. COMPUTERIZED AND INTERACTIVEVIDEODISK EDUCATIONAL FORMATS MAY NOT BE READILY CUSTOMIZED FOR THE INDIVIDUAL STUDENT. HOWEVER, COMMONLY-AVAILABLE IN PERSONAL COMPUTERS AND HAND-HELD CAMCORDERS ARE TOOLS AVAIL ABLE IN MOST SCHOOLS. IF A PERSONAL COMPUTE ...

    SBIR Phase I 1988 Department of Education
  4. TUNABLE HIGH T(C) SUPERCONDUCTING INFRARED DETECTORS

    SBC: EIC LABORATORIES, INC.            Topic: N/A

    A SUPERSONDUCTOR BASED INFRARED DETECTOR WITH A CONTINUOUSLY VARIABLE SENSITIVITY IS PROPOSED. THE SUPERCONDUCTING THIN FILM IS TO HAVE A POLYCRYSTALLINE NATURE TO ACHIEVE JOSEPHSON JUNCTION BEHAVIOR DIRECTLY THROUGH THE ANISOTROPIC SUPERCONDUCTING PROPERTIES OF YBA(2)CU(3)O(7-X). THE DEPOSITION SUBSTRATE IS TO BE AN OXYGEN ION CONDUCTOR THAT WILL PERMIT CONTINUOUS AND CONTROLLED ADJUSTMENT OF THE ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  5. REMOTELY OPERATED MINE DETECTION SYSTEM

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    THE CAPABILITY EXISTS TO DETECT MAGNETIC, NONMAGNETIC, METALLIC AND PLASTIC BURIED AND SURFACE SCATTERED MINES THROUGH THE USE OF A SIMPLE SUITE OF SENSORS FROM THE SURFACE. THE CAPABILITY ALSO EXISTS TO DESIGN, BUILD, AND OPERATE A LOW COST REMOTE CONTROLLED PLATFORM FOR CARRYING THIS SUITE OF SENSORS. BOTH TECHNOLOGIES ARE CURRENTLY UNDER DEVELOPMENT AND/OR BEING DEMONSTRATED AT FOSTER-MILLER, I ...

    SBIR Phase II 1988 Department of DefenseDefense Advanced Research Projects Agency
  6. LEADING EDGE STRUCTURAL CONCEPT FOR HYPERVELOCITY VEHICLE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    A MAJOR PROBLEM FACING PHYPERSONIC VEHICLE DESIGNERS IS THE DEVELOPMENT OF FLIGHT STRUCTURES WHICH CAN WITHSTAND MULTIPLE HEATING CYCLES TO OVER 3500 DEG F. ADVANCED CARBON/CARBON COMPOSITES (ACC) ARE A LEADING CANDIDATE BUT WILL REQUIRE IMPROVED STRUCTURAL CONCEPTS AND OXIDATION RESISTANT COATINGS. CURRENT 2-D ACC MADE FROM CARBON-PHENOLIC HAVE POOR TRANSVERSE STRENGTH AND THERMAL CONDUCTIVITY. 3 ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  7. NOVEL CARBON-CARBON COMPOSITE WITH IMPROVED STRUCTURAL PROPERTIES AND PROVISIONS FOR ACTIVE LEADING EDGE COOLING

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    EFFECTIVE PERFORMANCE OF REUSABLE HYPERSONIC VEHICLES WILL DEPEND ON THE DEVELOPMENT OF THERMAL PROTECTION SYSTEMS (TPS) FOR NOSE TIP, WING LEADING EDGE, AND FUSELAGE STRUCTURES CAPABLE OF OPERATION FOR EXTENDED PERIODS IN AN EXTREME AEROHEATING ENVIRONMENT. MINIMUM WEIGHT DESIGN MAY BE ACHIEVED VIA A COMBINATION OF ACTIVE/PASSIVE TPS APPROACHES. THIS WOULD INVOLVE THE DEVELOPMENT OF A HIGH TEMPER ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  8. NOVEL SENSOR SYSTEM FOR WIDE AREA MINES

    SBC: GEO-CENTERS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  9. EDUCATING INFORMED CONSUMERS: A NATIONAL SURVEY OF FAMILIESKNOWLEDGE CONCERNING RESPITE SERVICES

    SBC: Human Services Res Inst            Topic: N/A

    THIS PROJECT IS BASED ON THE PREMISE THAT PRIMARY CARE- GIVERS SHOULD PLAY A MAJOR ROLE IN DESIGNING, MANAGING, AND MONITORING SERVICES WHICH SUPPORT CHILDREN WITH DISABILITIESAND THEIR FAMILIES. RESPITE SERVICES OFFERS BUT ONE FORUM FROM WHICH THEY CAN EXERCISE THESE ROLES. THROUGH THE USE OF AN ADVISORY BOARD, MADE UP LARGELY OF PRIMARY CARE GIVERSAND A NATIONAL SURVEY THIS PROJECT SEEKS TO DETE ...

    SBIR Phase I 1988 Department of Education
  10. COMPACT ACCELERATOR DESIGN BASED ON A CYCLIC INDUCTION ACCELERATOR WITH BRANCHED MAGNETICS

    SBC: Science Research Laboratory, Inc            Topic: N/A

    CURRENT DESIGNS FOR HIGH CURRENT (10-100KA) ACCELERATORS ARE BASED ON LINEAR OPERATING GRADIENTS OF AT BEST 1-2 MEV/METER. IN FERRI-(FERRO)MAGNETIC INDUCTION ACCELERATORS, THESE LOW GRADIENTS ARE IMPOSED BY THE PROPERTIES OF THE MATERIAL WHICH COMPRISES THE CORE. WITH AIR CORE RADIAL LINE INDUCTION LINACS, THE CONSTRAINTS IS DERIVED FROM THE GEOMETRY OF THE RADIAL LINES AND THE DIELECTRIC BREAKDOW ...

    SBIR Phase II 1988 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government