You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Vehicle Intelligent Performance Enabled Retrofit (VIPER)

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: OSD07E10

    The United States has a mechanized military that relies heavily on fuel availability. Delivering large quantities of fuel is a logistical burden. Besides the cost of the fuel itself, we must transport it, store it, and protect it. Fuel convoys are large targets moving along predicable paths. They expose soldiers and contractors to great dangers, and are a favorite target for terrorist attacks. ...

    SBIR Phase I 2008 Department of DefenseArmy
  2. A universal TET system for implanted life support systems

    SBC: ABIOMED, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): The ultimate objective of this proposed program is the commercialization of a universal transcutaneous energy transfer (TET) system with a high performance implantable battery. This integrated power system will be adapt able to a host of next generation fully implantable mechanical circulatory support (MCS) systems. To date, fully implantable systems (i.e. the ...

    SBIR Phase II 2008 Department of Health and Human ServicesNational Institutes of Health
  3. SBIR Phase I: PolyRNA- A Radical Innovation for Healing the Human Body

    SBC: Ablitech, Inc.            Topic: BT

    This Small Business Innovation Research (SBIR) Phase I project will demonstrate the feasibility of a platform technology for cancer therapy which overcomes the inherent shortcomings of other attempts to delivery siRNA to cancer cells. The difficulty with current siRNA delivery is that the enzymes in the body degrade the siRNA before it can reach its target. Most current siRNA technologies on the m ...

    SBIR Phase I 2008 National Science Foundation
  4. Improved Clutter Management Techniques for High Resolution Radars

    SBC: 3 Phoenix, Inc.            Topic: N07213

    The team of 3 Phoenix, Inc. and Northrop Grumman Corporation propose to develop and evaluate technology that provides a substantial performance improvement to the problem of clutter discrimination. The team describes algorithms proposed to achieve substantial performance improvement. The proposed technology includes algorithms to perform detection of targets in heavy clutter, algorithms for extr ...

    SBIR Phase I 2008 Department of DefenseNavy
  5. Novel Fiber Optic Methods for Sensing Shape, Orientation and/or Heading of Undersea Arrays and Tethers

    SBC: 3 Phoenix, Inc.            Topic: N08T029

    Structural state awareness can be vitally important to a wide variety of both commercial and military systems, including buildings, bridges, vehicles and advanced sensors. Equipment required to provide this telemetry has typically been large and heavy making it difficult to incorporate into the desired environment. The use of a strain and temperature sensing technique based in fiber optics can p ...

    STTR Phase I 2008 Department of DefenseNavy
  6. Improved Clutter Management Techniques for High Resolution Radars

    SBC: 3 Phoenix, Inc.            Topic: N07213

    Under Phase I, the team of 3 Phoenix, Inc. and Northrop Grumman Corporation developed and evaluated technology that can provide a substantial performance improvement to the problem of clutter management for radar periscope detection and discrimination applications. The proposed technology includes algorithms and techniques to perform detection of targets in heavy clutter, algorithms for extracting ...

    SBIR Phase II 2008 Department of DefenseNavy
  7. Distributed Sensor System Innovations

    SBC: 3 Phoenix, Inc.            Topic: N07070

    The objectives for this Phase II effort follow logically from the Phase I proposal and the ground work laid in Phase I. The overarching goal is to prove a radically different approach to sensor packaging which offers a quantum leap in cost reduction and manufacturability improvement. Preliminary testing results from Phase I indicate that the alternative technical approach to telemetry packaging an ...

    SBIR Phase II 2008 Department of DefenseNavy
  8. Novel Catheter for Treatment of Ventricular Tachycardia

    SBC: Thermedical Inc.            Topic: N/A

    DESCRIPTION (provided by applicant): Ischemic ventricular tachycardia (VT) is a contributing cause to more than half of the 300,000 sudden cardiac deaths that occur annually in the United States. Implantable cardioverter defibrillators (ICDs) are the stand ard therapy but they are expensive the total cost of an ICD implant approaches 50,000 and the United States spends more than 2.2B on these im ...

    SBIR Phase II 2008 Department of Health and Human ServicesNational Institutes of Health
  9. Advanced Hybrid Thermoelectric-Solid Oxide Fuel Cell Energy Conversion for High Efficiency Portable Power

    SBC: Atrex Energy, Inc.            Topic: OSD08EP4

    The proposal would provide the design and basic product development work to augment the power generation efficiency of fuel cells developed by Acumentrics Corp. by converting waste heat into electricity by highly efficient thermoelectric (TE) power generation. Three paths will be explored in Phase I to add a TE generator to the SOFC. The first will explore the use of a material that is used in co ...

    SBIR Phase I 2008 Department of DefenseNavy
  10. Marine Portable Power Unit

    SBC: Atrex Energy, Inc.            Topic: N06105

    A conceptual design of a battery charging station with UPS back-up capability was completed under contract M67854-C-6509. The resulting system can charge up to twelve BB-2590 batteries at the maximum charging current (to minimize charging time) and provide 1000 Watts of back-up power (both AC and DC outputs are provided) for at least one hour. Individual batteries can be hot-swapped for field us ...

    SBIR Phase II 2008 Department of DefenseNavy
US Flag An Official Website of the United States Government