List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. "AN ELECTRONICALLY SCANNED IMPULSE RADAR FOR THE DETECTION OF MINES"

    SBC: Anro Engineering, Inc.            Topic: N/A

    AN INNOVATIVE ADVANCEMENT IN SCANNING IMPULSE RADAR ARRAY TECHNOLOGY OFFERS A NEW CAPABILITY TO DETECT BURIED METALLIC AND NONMETALLIC MINES. THE SCANNING IMPULSE RADAR ARRAY SYSTEM WILL INCORPORATE ACTIVE CANCELLATION AND POLARIZATION CONTROL TO ENHANCE THE MINE-SOIL INTERFACE TO PERMIT DETECTION. IN PHASE I OF THIS PROGRAM, A CONCEPT FEASIBILITY DEMONSTRATION WILL BE CONDUCTED. ADVANCED SIGNAL P ...

    SBIR Phase II 1993 Department of DefenseArmy
  2. "AN ELECTRONICALLY SCANNED IMPULSE RADAR FOR THE DETECTION OF MINES"

    SBC: Anro Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  3. (A-TEAMM) Advanced Team Effectiveness through Automated Model-Based Mitigation

    SBC: APTIMA, INC.            Topic: A11041

    Groups in network-centric environments are faced with many challenges including distributed collaboration, decen-tralized decision-making, and dynamic changes in team membership. The team literature provides evidence that these challenges impede the development of optimal team states (composed of trust, cohesion, shared mental mod-els, etc.), ultimately influencing a team"s ability to share m ...

    SBIR Phase I 2011 Department of DefenseArmy
  4. 2.5 KVA Inverter with Selectable Output Voltage for Ground Mobile Vehicle Use.

    SBC: Charles River Analytics, Inc.            Topic: N/A

    The Phase II objective is to develop a Multi-agent Architecture for Robust Adaptive Decision-aiding (MARAD), specifically to support enhanced adaptive user interfaces and tactical event predictions via sequential learning. Feasibility of MARAD wasdemonstrated under the Phase I effort, in which we developed a sequential learning component that supports the capturing of user interactions with the vi ...

    SBIR Phase II 2001 Department of DefenseArmy
  5. 3 kW Lightweight Efficient Generator

    SBC: NOVATIO Engineering, Inc            Topic: A12100

    At NOVATIO Engineering, our solution to this problem is practical and novel (and proven at a smaller scale): conversion of a lightweight gasoline generator to operate with diesel fuel or JP-8 in spark ignition mode. During the past year, with the help of CERDEC funding, Novatio has developed and demonstrated a JP-8/DF-2-fueled 900W prototype based on the EU1000i inverter gen-set. In the Novatio ...

    SBIR Phase I 2013 Department of DefenseArmy
  6. 3 kW Lightweight Efficient Generator

    SBC: NOVATIO Engineering, Inc            Topic: A12100

    At NOVATIO Engineering, our solution to this problem is practical, novel, proven at a smaller scale and now demonstrated at the 3 kW size range: conversion of a commercial lightweight gasoline generator to operate with diesel fuel or JP-8 in spark ignition mode. Prior to this Phase I SBIR effort, with the help of CERDEC funding, Novatio had developed and demonstrated a JP-8/DF-2-fueled 750W proto ...

    SBIR Phase II 2014 Department of DefenseArmy
  7. 3 kW Lightweight Efficient Generator

    SBC: NOVATIO Engineering, Inc            Topic: A12100

    Proposed here is a method to develop and demonstrate a lightweight JP8 fueled 3kW power generator for military uses.

    SBIR Phase II 2016 Department of DefenseArmy
  8. 3-D EBG Structures with Carbon Nanotube Composites for Advanced Conformal Antennas

    SBC: Physical Sciences Inc.            Topic: A06132

    In this SBIR Army project Physical Sciences Inc. (PSI) proposes to model, demonstrate, fabricate, and test a new EBG structure designed to enhance the performance of conformal antennas thanks to its intrinsic 3D geometry suitable to curved surfaces. To further improve the antenna performance a new carbon nanotube composite, proven to act as a microwave absorbing material, will be layered in the EB ...

    SBIR Phase I 2006 Department of DefenseArmy
  9. 3D Integrated Full Color Microdisplays Based on InGaN/AlGaInP Semiconductor Microemitter Arrays

    SBC: III-N Technology, Inc            Topic: A07082

    The goal of this SBIR project is to develop next generation inorganic semiconductor based emissive microdisplays with the following merits: •Much higher brightness and power efficiency (5 x) than the current filter based LCD and OLED microdisplays. •Resolution and pixel density higher than 15 micron per pixel with VGA, SVGA and higher format. •RGB narrow bandwidth (~ 25 nm) with high color f ...

    SBIR Phase I 2007 Department of DefenseArmy
  10. 3D Lidar Simulation Model for Development and Validation of Biological and Chemical Agent Detection and Identification Algorithms

    SBC: Spectral Sciences, Inc.            Topic: N/A

    Not Available "There is a diversity of active and passive sensors and associated processing algorithms proposed and under development for remote detection of chemical and biological agents. It would be highly beneficial to have a consistent and accurate means forcomparing, evaluating, and projecting system and algorithm performance over the full range of anticipated operational conditions. For man ...

    SBIR Phase I 2002 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government