You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 5793 results
  1. Additive Manufacturing of Advanced Metallics

    SBC: TRITON SYSTEMS, INC.            Topic: MDA22T010

    The Missile Defense Agency is seeking innovative material and manufacturing processes for advanced metallic components for hypersonic flight systems. Triton Systems and their academic partner are proposing to develop the manufacturing and qualification evaluation techniques for reliable production of hypersonic environment appropriate metallic components at reduced cost and timelines compared to t ...

    STTR Phase I 2023 Department of DefenseMissile Defense Agency
  2. Additively Manufactured Ceramic Syntactic Foams

    SBC: PHYSICAL SCIENCES INC.            Topic: MDA22T012

    The Advanced Composite Structures group at Physical Sciences Inc. has partnered with the University of Virginia to develop a high temperature, ceramic syntactic foam that can be fabricated using additive manufacturing (AM) techniques. The AM ceramic insulator is compatible for co-processing with other CMC components such as aeroshells, fins, and additional hypersonic flight vehicle control surface ...

    STTR Phase I 2023 Department of DefenseMissile Defense Agency
  3. E-Textile Enabled Active Monitoring System (E-TEAMS)

    SBC: VIVONICS INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  4. Electroneurography for Muscle Fatigue

    SBC: PISON TECHNOLOGY INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  5. An Easily Integratable Wearable Real-Time Cognition & Physiological Monitoring Device for Human Performance Optimization

    SBC: NEURABLE INC.            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  6. A Garment-Embedded Physiological Monitoring Solution for Defense and Commercial Applications

    SBC: HUMAN SYSTEMS INTEGRATION INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  7. Air-Cycle Cabin Cooling (AC3)

    SBC: PHYSICAL SCIENCES INC.            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  8. MACC Magnetocaloric Air Cabin Cooler

    SBC: WARBURGWEISS CORPORATION            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  9. Refrigerant-Free Cooling System

    SBC: TRITON SYSTEMS, INC.            Topic: A234003

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  10. TacDIVE- A Diver Health and Safety Monitoring and Alerting System

    SBC: HUMAN SYSTEMS INTEGRATION INC            Topic: A234004

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government