You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RAMAN COVERTED MID-IR LASER

    SBC: ABIOMED, INC.            Topic: N/A

    THE OBJECTIVE OF THIS PROPOSAL IS THE DEVELOPMENT OF A PULSED MID-IR LASER IN THE 3.5 TO 4.1 MICROMETER ATMOSPHERIC TRANSMISSION WINDOW. SUCH SPECTRAL SOURCE IS RELEVANT TO A VARIETY OF TACTICAL APPLICATIONS. THE DF CHEMICAL LASER HAS BEEN THE CHOICE, BUT SUFFERS FROM WASTE FUEL MANAGEMENT PROBLEMS. NO OTHER EFFICIENT DIRECT LASING SOURCE IS AVAILABLE. TO OBTAIN SUCH A SOURCE, WE PROPOSE THE USE O ...

    SBIR Phase II 1986 Department of DefenseArmy
  2. DISTRIBUTED PROCESSING FOR BALLISTIC DEFENSE SYSTEMS

    SBC: Advanced Decision Systems            Topic: N/A

    THE OBJECTIVE OF THIS STUDY IS THE DEVELOPMENT OF TOOLS AND TECHNIQUES DESIGNED TO AID IN THE ABILILTY TO DEVELOP DISTRIBUTED COMPUTING SYSTEMS FOR REAL-TIME ENVIRONMENT. THE INITIAL INVESTIGATION WILL FOCUS ON THE DEVELOPMENT AND AND EVALUATION OF INTERCEPTOR MANAGEMENT ALGORITHMS USING ARTIFICIAL INTELLIGENCE PLANNING TECHNIQUES. THE WORK TO BE PERFORMED DURING PHASE I WILL INCLUDE DEVELOPING AN ...

    SBIR Phase II 1986 Department of DefenseArmy
  3. OPERATIONS MONITORING ASSISTANT

    SBC: Advanced Decision Systems            Topic: N/A

    THIS PROPOSAL CONCERNS THE BASIC RESEARCH AND DEVELOPMENT REQUIRED TO DEFINE AN OPERATIONS MONITORING ASSISTANT (OMA) WHICH IS INTENDED AS A TOOL FOR ASSESSING THE IMPACT OF CURRENT EVENTS ON A CORPS, OR DIVISION LEVEL OPERATIONS PLAN. THE SYSTEM IS PRINCIPALLY CONCERNED WITH FULFILLING AN INDICATIONS AND WARNING FUNCTION, THAT IS, WITH PREDICTING THE CONSEQUENCES OF IMPORTANT BATTLEFIELD EVENTS I ...

    SBIR Phase II 1986 Department of DefenseArmy
  4. SPATIAL DATA STRUCTURES FOR ROBOTIC VEHICLE ROUTE PLANNING

    SBC: Advanced Decision Systems            Topic: N/A

    ADS IS PROPOSING TO DEVELOP OBJECT-ORIENTED, SCHEMA-BASED DATA STRUCTURES FOR REPRESENTING TERRAIN DATA. THESE DATA STRUCTURES CAN SATISFY DEMANDING SPACE AND TIME CONSTRAINTS BY MINIMIZING PAGING IN A VIRTUAL MEMORY SYSTEM. THIS WILL BE ACCOMPLISHED BY COMPACTLY REPRESENTING THE DATA IN A FORMAT DIRECTLY RELEVANT TO THE ROUTE PLANNING APPLICATIONS. THE SCHEMATA EXPLICITLY REPRESENT THRESS ASPECTS ...

    SBIR Phase II 1987 Department of DefenseArmy
  5. KNOWLEDGE SHARING

    SBC: Advanced Decision Systems            Topic: N/A

    ADS PROPOSES TO PERFORM REQUIREMENTS ANALYSIS, CONCEPT DEVELOPMENT, AND FEASIBILITY ANALYSIS FOR A PHASE II IMPLEMENTATION OF A SORTER/ PARSER FOR INTERCEPTED MESSAGES IN THE TACTICAL BATTLEFIELD DOMAIN. THE CONCEPT PROPOSED FOR A MESSAGE SORTER PARSER UTILIZES A KEYWORDBASED INFORMATION RETRIEVAL PROGRAM, CALLED RUBRIC, TO SORT THE MESSAGES INTO SENDER AND INTENDED RECEIVER CATEGORIES, TOGETHER W ...

    SBIR Phase I 1987 Department of DefenseArmy
  6. SPATIAL DATA STRUCTURES FOR ROBOTIC VEHICLE ROUTE PLANNING

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  7. AI FOR COMMAND AND CONTROL: RESEARCH TOWARD A TERRAIN REASONING SYSTEM

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  8. TEAMWORKS- A LABORATORY FOR THE STUDY OF TEAMWORK AMONG HUMANS AND ROBOTS

    SBC: Advanced Decision Systems            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  9. ARTIFICIAL INTELLIGENCE FOR VOICE JAMMING

    SBC: ADVANCED DIGITAL SYSTEMS, INC.            Topic: N/A

    EVALUATION OF JAMMING EFFECTIVENESS IN DATA SIGNALS IS RATHER STRAIGHTFORWARD AND IS GENERALLY REPEATABLE. THAT IS, A PARTICULAR JAMMING SYSTEM WILL PRODUCE THE SAME BIT ERROR RATE EACH TIME A TEST IS RUN WITH THE SAME TEST PARAMETERS. EVALUATION OF EFFECTIVENESS OF JAMMING OF VOICE SIGNALS HOWEVER, IS VERY SUBJECTIVE AND EVEN WITH THE SAME TEST SUBJECTS, RESULTS WILL FREQUENTLY DIFFER FROM TEST T ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. ARTIFICIAL INTELLIGENCE FOR THREAT WARNING SYSTEMS

    SBC: ADVANCED DIGITAL SYSTEMS, INC.            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO EXPLORE THE POTENTIAL OF FINITE INDUCTIVE SEQUENCE PROCESSING (FISP) TO PROVIDE FOR SMART THREAT SENSOR SYSTEMS. THE PROPOSAL WILL SINGLE OUT THE RADAR WARNING RECEIVER (RWR) AS A CANDIDATE SYSTEM. FISP, HOWEVER, HAS APPLICATION AND CAPABILITY WELL BEYOND THAT WHICH WILL BE PROPOSED AND COULD BE USED AS AN ONBOARD, CHIP-LEVEL, KNOWLEDGE-BASED SENSOR FUSION SYSTEM ...

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government