You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A13: Aptimas Advanced Automated Approach Aimed At Author-Artifact Attribution And Assessing Author Ambitions

    SBC: APTIMA INC            Topic: A18054

    Human social interaction is complicated by ambiguous identities, misinformation, misdirection, and flexible alliances. Additionally, thanks to the internet, authors can post messages from anywhere in the world, in diverse forms, and with different personas. Current solutions are challenged to accurately identify and characterize authors across platforms and data types, let alone infer authorial in ...

    SBIR Phase I 2018 Department of DefenseArmy
  2. Abuse Tolerant High Energy LiCoPO4-Based 5V Li-ion Cells

    SBC: TIAX LLC            Topic: A14023

    TIAX will build, characterize and abuse test lithium-ion cells employing LiCoPO4 cathodes and control metal-oxide based cathodes (such as LiCoO2 ) opposite graphite anodes. In Phase I, TIAX will perform overcharge and external short circuit tests to the specification of the UL1642 standard and will also perform nail penetration tests on both types of cells. In the option program TIAX will perfor ...

    SBIR Phase I 2014 Department of DefenseArmy
  3. Abuse Tolerant High Energy LiCoPO4-Based 5V Li-ion Cells

    SBC: TIAX LLC            Topic: A14023

    TIAX will build, characterize and abuse test high energy 18650-size lithium-ion cells employing Fe-substituted LiCoPO4 high voltage cathode material developed by the Army Research Laboratory and compare their performance to control LiCoO2-based lithium-ion cells. TIAX will perform overcharge, external short circuit, uniform heating and crush tests to the specification of the UL1642 standard and wi ...

    SBIR Phase II 2015 Department of DefenseArmy
  4. ACCESS: A COMMUNICATING AND COOPERATING EXPERT SYSTEMS SYSTEM

    SBC: SYMBIOTECH, INC.            Topic: N/A

    THE INTENT OF THIS PROJECT IS TO PROVIDE A SOFTWARE ENVIRONMENT WHICH WILL ALLOW IMMEDIATE IMPLEMENTATION OF A VARIETY OF COOPERATING EXPERT SYSTEM PARADIGMS. THE ENVIRONMENT, REFERRED TO AS ACCESS, WILL BE DESIGNED TO BE EXPERT SYSTEM REPRESENTATION INDEPENDENT, BE PORTABLE TO ANY HARDWARE WHICH SUPPORTS COMMON LISP, PROVIDE A FLEXIBLE MESSAGE PASSING PROTOCOL AND ALLOW THE USER TO ARRANGE EXPERT ...

    SBIR Phase II 1989 Department of DefenseArmy
  5. ACCESS: A COMMUNICATING AND COOPERATING EXPERT SYSTEMS SYSTEM

    SBC: SYMBIOTECH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  6. Achieving Federated ISR Collection through Intelligent Optimization and Natural AI-supported Decision Operations (AFICIONADO)

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: A20142

    Conducting timely high-quality intelligence, surveillance, and reconnaissance (ISR) in Multi-Domain Operations (MDO) requires providing Army support staff with situation awareness data and new processing and visualization tools that enable improved planning, synchronizing, and conducting of multi-intelligence, multi-platform collection. To better anticipate and address the new coordination challen ...

    SBIR Phase I 2021 Department of DefenseArmy
  7. A COLD FLOW TEST FACILITY FOR IR SUPPRESSORS

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    THE PRESENT NEED TO TEST IR SUPPERSSORS ON APPLICATION ENGINES INCURS SIGNIFICIANT COSTS DUE TO THE REQUIREMENTS OF A FULL-SCALE ENGINE INCLUDING: ITS FUEL UE, SAFE EXHAUST DISPOSAL, AND THE NECESSITY OF UTILIZING FULL-SCALE, HEAT-RATED SUPPRESSOR PROTOTYPES. THESE COSTS CAN BE REDUCED USING A CORRECTLY SCALED AMBIENT TEMPERATURE TEST FACILITY. RELIABLE ESTIMATES OF GAS TURBINE ENGINE EXHAUST SYST ...

    SBIR Phase II 1992 Department of DefenseArmy
  8. A COLD FLOW TEST FACILITY FOR IR SUPPRESSORS

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  9. A Comfortable, Durable and High Performance Warfighter Heated Apparel System

    SBC: HUMAN SYSTEMS INTEGRATION INC            Topic: A19069

    Today’s warfighter is very often called upon to operate in extremely cold environments, both in operational and training settings. These environments can range from operating or training in geographical or seasonally cold areas to performing a high altitude, high opening (HAHO) or high altitude, low opening (HALO) parachute jump in extremely cold ambient temperatures or to flying rotary wing air ...

    SBIR Phase II 2021 Department of DefenseArmy
  10. A Comfortable, Durable and High Performance Warfighter Heated Glove System

    SBC: HUMAN SYSTEMS INTEGRATION INC            Topic: A19069

    Today’s warfighter is often called upon to operate in extremely cold environments, both in operational and training settings. These environments can range from operating or training in geographical or seasonally cold areas to performing a high altitude, high opening (HAHO) or high altitude, low opening (HALO) parachute jump in extremely cold ambient temperatures. To operate in these environments ...

    SBIR Phase I 2019 Department of DefenseArmy
US Flag An Official Website of the United States Government