You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SBIR Phase I: Process-Control Instrument for Multi-Chamber Platforms

    SBC: Active Impulse Sys, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1998 National Science Foundation
  2. A Portable Electronic Composite Track Loading Fixture

    SBC: ADVANCED TECHNOLOGIES GROUP, INC.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Transportation
  3. An Optical Sensor for Monitoring Odors at Agricultural Livestock Facilities

    SBC: AeroSurvey, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Agriculture
  4. MEASURING RESISTANCE OF INSECTS TO BT TOXINS WITH HYDRATEABLE MEAL PADS

    SBC: Agdia, Inc.            Topic: N/A

    In the summer of 1998 over 2.8 million acres of farmland in the Southern U.S. was planted in genetically engineered cotton expressing a gene derived from the bacterium, Bacillus thuringiensis (Bt). This Bt gene codes for production of a protein that is toxic to some of the most important lepidopteran pests of U.S. cotton. The future expansion of this new technology on more cotton acreage and in ot ...

    SBIR Phase I 1998 Department of Agriculture
  5. SBIR Phase I: Agent-based Simulation and Modeling Over the World Wide Web

    SBC: Agentsheets, Inc            Topic: N/A

    N/A

    SBIR Phase I 1998 National Science Foundation
  6. GPS-Based Animal Control System

    SBC: AgriTech Electronics, L.C.            Topic: N/A

    This is a Phase II proposal to continue the work begun by AgriTech Electronics, LC (AgriTech) on a GPS-based livestock control system. This system will exclude animals from areas, or contain them within defined boundaries, where it is impractical or inefficient to build fence to achieve this objective. These needs arise in a variety of contexts, including the exclusion of livestock from riparian a ...

    SBIR Phase I 1998 Department of Agriculture
  7. A Novel Flat Panel Detector for X-Ray Diffraction

    SBC: RADIATION MONITORING DEVICES, INC.            Topic: N/A

    N/A

    SBIR Phase II 1998 National Science Foundation
  8. SBIR Phase I: Low Cost Composite Plate for Proton Exchange Membrane (PEM) Fuel Cell

    SBC: ANALYTIC POWER LLC            Topic: N/A

    N/A

    SBIR Phase II 1998 National Science Foundation
  9. SBIR Phase I: Controlled-Foam Injection for the Fracturing of Rock and Concrete

    SBC: Appl Geodynamics, Inc            Topic: N/A

    N/A

    SBIR Phase I 1998 National Science Foundation
  10. SBIR Phase I: On-Line Measurement of Particle Size Distributions Using Photon Migration

    SBC: Appl Photon Migr Techs Inc            Topic: N/A

    N/A

    SBIR Phase I 1998 National Science Foundation
US Flag An Official Website of the United States Government