You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Multimodal Alerting Interface with Networked Short-range Transmissions (MAIN-ST)

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: 161FH2

    The connected vehicles program is a multimodal U.S. DOT initiative that uses a dedicated wireless communication technology to enable safer, smarter, and greener surface transportation. While significant efforts are being made to bring motor vehicles and transportation infrastructure onto this connected network, bicycles have been largely overlooked. As a result, a significant need exists to bring ...

    SBIR Phase I 2016 Department of Transportation
  2. Pedestrian Detection, Counting and Tracking Systems for Travel Surveys, Traffic Safety Systems and Traffic Control Systems

    SBC: Migma Systems Inc.            Topic: 091FH4

    In Phase II, we developed a new system for pedestrian detection, tracking and counting. In this system, both IR LED stereo camera and laser scanner are selected for use. This Phase II system was field-tested at a few cities and achieved a counting accuracy about 97% over 5,000 pedestrians counted. The system can also stream the ped counts and images to a remote server. Based on the feedback from p ...

    SBIR Phase II 2016 Department of Transportation
  3. A Reliable Transit Passenger Counting and Re-identification System Using Occlusion Proof Biometrics

    SBC: Migma Systems Inc.            Topic: 142FT1

    Automated passenger counter has been used in the transit systems for automated passenger counting and reporting. These systems have suffered counting accuracy issues, particularly at high rider load points, and at end-of-line count reconciliation. In Phase I, we have successfully developed systems for passenger counting and re-identification. Test results using the data collected at a transit b ...

    SBIR Phase II 2016 Department of Transportation
  4. Self-Sustaining, Intelligent Pavement Systems

    SBC: SOLAR ROADWAYS INCORPORATED            Topic: 091FH5

    As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with modular Solar Road Panels: structurally-engineered solar panels that can be driven upon. The roadwa ...

    SBIR Phase II 2016 Department of Transportation
  5. Device to Address the Competing Needs of Ensuring Lockability of Seat Belts and Mitigating Entrapment Risk

    SBC: TOOL, INC.            Topic: 142NH1

    Federal regulations require a seat belt assembly with a locking lap belt to be available in passenger seating positions to securely accommodate a child restraint system. More recently, federal regulations have been updated to improve the quality of the child restraint system and the mechanisms by which it is secured. However, there are restrictions on total weight capacities for new restraint sy ...

    SBIR Phase II 2016 Department of Transportation
  6. Long Life, Low Cost Mini-Roundabouts from Simple Modular Shapes and Recycled Material

    SBC: ZKXKZ LLC            Topic: 142FH3

    In Phase I, ZKxKZ designed, developed and demonstrated an approach for fabrication and rapid installation of low cost modular mini-roundabouts made from recycled plastic boards. Phase 1 culminated in the demonstration of half-scale 24’ diameter roundabout’s center circle made with the recycled boards. The same material and modular construction approach can be applied to other roundabout featur ...

    SBIR Phase II 2016 Department of Transportation
  7. Automated Production of Composite Energy Absorbing Utility Poles

    SBC: KaZaK Composites Incorporated            Topic: N/A

    KaZaK Composites, Kaman Sciences and Dr. Malcolm Ray of the University of Iowa propose to investigate the design of energy absorbing utility poles made from composite materials. This team has considerable experience in the multiple technologies needed to successfully complete the proposed program, including design of high performance composite products for automated production and design, analysi ...

    SBIR Phase II 1998 Department of Transportation
  8. Response-Based Parameter Estimation for Determining Unknown Bridge Foundations

    SBC: INFRASENSE, INC.            Topic: N/A

    Evaluation of bridges for vulnerability to scour or other potential sources of damage requires knowledge of foundation conditions beneath piers and abutments that are often unknown. INFRASENSE proposed to develop and demonstrate a response-based parameter estimation method (RPEM) which will address the need for a simple, low-cost system for unknown foundation evaluation. The RPEM system is based ...

    SBIR Phase II 1998 Department of Transportation
US Flag An Official Website of the United States Government