You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. FEASIBILITY OF IN-SITU BIODEGRADATION OF CHLORINATED ETHENES IN CONTAMINATED AQUIFERS

    SBC: Cambridge Analytical Assoc Inc            Topic: N/A

    THE CHLORINATED ETHENES, VINYL CHLORIDE, VINYLIDINE CHLORIDE, TRICHLOROETHYLENE, AND TETRACHLOROETHYLENE HAVE BEEN DETECTED IN GROUNDWATER THROUGHOUT THE UNITED STATES. VINYL CHLORIDE AND VINYLIDINE CHLORIDE ORIGINATE FROM INDUSTRIAL WASTE DISPOSAL SITES AS WASTE PRODUCTS OF PLASTIC MANUFACTURING AND TRICHLOROETHYLENE IS WIDELY USED AS AN INDUSTRIAL SOLVENT. SINCE THESE COMPOUNDS ARE HIGHLY TOXIC, ...

    SBIR Phase II 1985 Environmental Protection Agency
  2. METAL-METAL MICROFILAMENTARY COMPOSITES FOR HIGH CURRENT ELECTRICAL CONDUCTOR APPLICATIONS

    SBC: EIC LABORATORIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseMissile Defense Agency
  3. LASER INDUCED DESTRUCTION OF AROMATIC CHLORINATED ORGANICS IN WASTE WATERS

    SBC: EERGC CORP.            Topic: N/A

    CHLORINATED AROMATIC HYDROCARBON (CAH) MAKE UP A LARGE FRACTION OF THE ORGANIC CHEMICALS DESIGNATED AS TOXIC. THEY FORM THE BASIS FOR THE PRODUCTION OF PESTICIDES, FUNGICIDES AND HERBICIDES; USUALLY END UP IN DILUTE CONCENTRATIONS IN WASTE WATER STREAMS RESULTING FROM THE MANUFACTURE AND/OR USE OF THE MATERIALS; PERSIST IN THE BIOSPHERE AS A RESULT OF THEIR SLOW BIODEGRADABILITY; AND CONCENTRATE I ...

    SBIR Phase II 1985 Environmental Protection Agency
  4. MODIFICATION

    SBC: Eng, Inc.            Topic: N/A

    RECENT PROMISING DEVELOPMENTS IN THE PETROLEUM INDUSTRY "PROFILE MODIFICATION TECHNOLOGY" (PMT) WILL BE EVALUATED FOR THEIR APPLICATION TO LEAKING LANDFILL SITES. PROFILE FLOW MODIFICATION TREATMENTS ARE USED TO INCREASE FLOW RESISTANCE IN HIGH PERMEABILITY AREAS FAR (75 FEET TO AS MUCH AS 1000 FEET) FROM THE INJECTION WELLBORE. THESE TREATMENTS CAN WITHSTAND FORMATION PRESSURES AND TEMPERATURES U ...

    SBIR Phase I 1985 Environmental Protection Agency
  5. METAL VALUE RECOVERY FROM ALLOY CHEMICAL MILLING WASTE

    SBC: Montana Environment Inc.            Topic: N/A

    N/A

    SBIR Phase I 1985 Environmental Protection Agency
  6. INTERCEPTOR BLINDING FROM ATMOSPHERE INDUCED EMISSIONS

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseMissile Defense Agency
  7. USE OF PULSED ULTRAVIOLET RADIATION IS PROPOSED AS A MEANS TTO DETOXIFY EQUIPMENT USED IN THE PREPARATION OF TOXIC CH CHEMICAL COMPOUNDS.

    SBC: Schafer Corporation            Topic: N/A

    USE OF PULSED ULTRAVIOLET RADIATION IS PROPOSED AS A MEANS TTO DETOXIFY EQUIPMENT USED IN THE PREPARATION OF TOXIC CH CHEMICAL COMPOUNDS. THE RADIATION WILL SERVE TO BOTH V VAPORIZE MATERIAL ADHERING TO THE SURFACE AS WELL AS TO BRING ABOUT PHOTOLYTIC DESTRUCTION. THIS COMBINATION OF EFFEFFECT IS PROJECTED TO PROVIDE A DRY CLEANING CONCEPT WHERE THE TOXIC MATERIAL AND ITS BYPRODUCTS (POTENTIALLY T ...

    SBIR Phase I 1985 Environmental Protection Agency
  8. SURFACE DISCHARGE AS AN INCOHERENT PUMP SOURCE FOR SOLID STATE LASERS

    SBC: Schafer Corporation            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseMissile Defense Agency
  9. OUTFLOWS AS WELL AS ON RESIDENTIAL SEPTIC SYSTEM LEACHING FIELDS

    SBC: Waste Process Technology            Topic: N/A

    STUDIES INDICATE THAT STRAIGHT SEPTAGE INTRODUCTION TO ACT IVATED SLUDGE PLANTS CAUSES SHOCK LOADING AND SUBSEQUENT VIOLATION OF EFFLUENT PERMIT STANDARDS. THIS PROJECT INTENDS TO EVALUATE DEWATERING OF SLUDGE BY THEUSE OF WIRE CLOTH SCREENING TO DETERMINE IF THE DEWATERED SLUDGE MEETS LANDFILL ACCEPTABILITY STANDARDS. IT INTENDS A ALSO TO DETERMINE IF THE RETURN OF THE FILTRATE TO THE S SEPTIC TA ...

    SBIR Phase I 1985 Environmental Protection Agency
US Flag An Official Website of the United States Government