You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Alaphatech, Inc.            Topic: N/A

    N/A

    STTR Phase II 1999 Department of DefenseAir Force
  2. MULTI-DISCRIMINANT SENSING FROM HIGH ALTITUDE OR SPACE

    SBC: ALPHATECH, INC.            Topic: N/A

    N/A

    STTR Phase I 1999 Department of DefenseAir Force
  3. Real Tme Intelligent Coaching for Command and Control

    SBC: APTIMA INC            Topic: N/A

    INTACT is an embedded tool to reduce operator workload un ccomples, information-rich, multi-task operational envbironments as well as an embedded coach for simulation based training. The coach is intended to ensure that a student is able to completesimulated mission task correctly, even when unsupervised during extracurtricular practice sessions.

    STTR Phase I 2001 Department of DefenseAir Force
  4. Real Tme Intelligent Coaching for Command and Control

    SBC: APTIMA INC            Topic: N/A

    INTACT is an embedded tool to reduce operator workload un ccomples, information-rich, multi-task operational envbironments as well as an embedded coach for simulation based training. The coach is intended to ensure that a student is able to completesimulated mission task correctly, even when unsupervised during extracurtricular practice sessions.

    STTR Phase II 2001 Department of DefenseAir Force
  5. A Practical Method to Predict and Control Non-linear Aeroelasticity

    SBC: BEAM Technologies, Inc.            Topic: N/A

    N/A

    STTR Phase I 1999 Department of DefenseAir Force
  6. Lightweight Deformable Mirror Systems

    SBC: Boston Micromachines Corporation            Topic: N/A

    In this project, a lightweight membrane mirror device will be integrated into an adaptive control system, capable of correcting static and dynamic primary-mirror shape errors in a space-based telescope. The core innovation will be the use of a multi-zone, deformable mirror fabricated by thin-film surface micromachining. Contour shape of the mirror membrane will be controlled by an array of electro ...

    STTR Phase I 2001 National Aeronautics and Space Administration
  7. Lightweight Deformable Mirror Systems

    SBC: Boston Micromachines Corporation            Topic: N/A

    In this project, a lightweight membrane mirror device will be integrated into an adaptive control system, capable of correcting static and dynamic primary-mirror shape errors in a space-based telescope. The core innovation will be the use of a multi-zone, deformable mirror fabricated by thin-film surface micromachining. Contour shape of the mirror membrane will be controlled by an array of electro ...

    STTR Phase II 2001 National Aeronautics and Space Administration
  8. Self Consuming Satellite with Multi-Functional Structure

    SBC: BUSEK CO., INC.            Topic: N/A

    N/A

    STTR Phase I 1999 Department of DefenseAir Force
  9. High Power, Modulation Doped AlGaN/GaN FETs on Melt Grown, Zinc Oxide Bulk Substrates

    SBC: CERMET, INC.            Topic: N/A

    N/A

    STTR Phase I 1999 Department of DefenseMissile Defense Agency
  10. Development of a Truly Lattice-Matched III-Nitride Technology for

    SBC: CERMET, INC.            Topic: N/A

    Cermet, in collaboration with researchers at Georgia Institute of Technology, proposes to implement a lattice matched III-Nitride technology using existing substrates. The implementation of a lattice matched substrate promises to produce near dislocationfree III-Nitrides for the first time while the use of an existing substrate technology dramatically lowers development cost and reduces the devel ...

    STTR Phase I 2001 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government