You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Transport of Underwater Sensor Data

    SBC: BENTHOS, INC.            Topic: N/A

    Undersea sensors require means of transporting data to an end-user. Acoustic modem networks are being developed for this purpose, but they are limited by battery power, network priorities, and requirements for clandestine operations. We propose a systemsapproach to reducing the impact on the network of moving large volumes of data, using both low rate and high rate acoustic telemetry, combined w ...

    STTR Phase I 2001 Department of DefenseNavy
  2. High Power, Modulation Doped AlGaN/GaN FETs on Melt Grown, Zinc Oxide Bulk Substrates

    SBC: CERMET, INC.            Topic: N/A

    N/A

    STTR Phase I 1999 Department of DefenseMissile Defense Agency
  3. Development of a Truly Lattice-Matched III-Nitride Technology for

    SBC: CERMET, INC.            Topic: N/A

    Cermet, in collaboration with researchers at Georgia Institute of Technology, proposes to implement a lattice matched III-Nitride technology using existing substrates. The implementation of a lattice matched substrate promises to produce near dislocationfree III-Nitrides for the first time while the use of an existing substrate technology dramatically lowers development cost and reduces the devel ...

    STTR Phase I 2001 Department of DefenseMissile Defense Agency
  4. Affordability Measurement and Prediction Methods to Support Affordable Design of Ship Systems

    SBC: COGNITION CORP.            Topic: N/A

    Maximum reduction of cost occurs early in ship design when there is significant uncertainty. In this environment, development of novel ship systems means historic and probabilistic data is absent, and uncertainty based-heuristics (fuzzy systems) are necessary. The hierarchical and extendable decision tool developed in this project uses uncertainty-based heuristics (fuzzy logic/systems) to evalua ...

    STTR Phase I 1999 Department of DefenseNavy
  5. N/A

    SBC: Electron Power Systems, Inc.            Topic: N/A

    N/A

    STTR Phase I 1999 Department of DefenseMissile Defense Agency
  6. N/A

    SBC: Electron Power Systems, Inc.            Topic: N/A

    N/A

    STTR Phase II 1999 Department of DefenseMissile Defense Agency
  7. Thermal Shock Resistant Hypersonic Sapphire Composite Infra

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    Foster-Miller will demonstrate a truly innovative previously unexplored route to fabricate high temperature 3 to 5 micron infrared (IR) optical composite materials for IR window and dome applications. Our approach will provide an IR sapphire composite material that will have thermal shock; transmission, absorption and emission, strength, and durability characteristic that will be enhanced ...

    STTR Phase I 1998 Department of DefenseNavy
  8. Modeling and Analysis for Acquisition Affordability Measurement and Prediction

    SBC: GLOBAL TECHNOLOGY CONNECTION, INC.            Topic: N/A

    N/A

    STTR Phase I 1999 Department of DefenseNavy
  9. High Power Gallium Nitride HEMT Prepared by Ion Implantatio

    SBC: Implant Sciences Corporation            Topic: N/A

    Implant Sciences Corporation proposes to develop a superior power transistor design based on ion implanted nitride semiconductor materials which will be produced at Howard University. Our lateral device design features an inverted GaN channel with the AlGaN charge supply layer doped by ion implantation. Ion implantation allows selective area doping, which will let us create for the first time an u ...

    STTR Phase I 1998 Department of DefenseMissile Defense Agency
  10. Tooling-Free MMC Casting by Combining 3-D Printing of Ceram

    SBC: METAL MATRIX CAST COMPOSITES, LLC (DBA M            Topic: N/A

    Three-dimensional printed preforms will be used as mold patterns for MMCC's high-density, pressure resistant, castable refractory. Hard tooling will be eliminated from the Advanced Pressure Infiltration Casting process (APIC ). Cost for Al/Sic electronic housings will be slashed 75% over conventional pressure casting. Complex parts will be easily manufactured. Design modifications can be quickly i ...

    STTR Phase I 1998 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government