You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High-Speed Three-Channel Photonic Time Delay Unit

    SBC: AGILTRON, INC.            Topic: MDA08T012

    An innovative, super-miniature, fast-switching array-based photonic time delay device is being developed for the active electronically scanned-array (AESA) MDA and Navy radars. The design is based on the fast electro-optic effect, the super miniature fiber-lens collimation array, and the existing WDM photonic true time delay technologies. In Phase I Agiltron has successfully demonstrated the core ...

    STTR Phase II 2011 Department of DefenseMissile Defense Agency
  2. Modeling Operator Reasoning and Performance for Human-in-Control Simulation (MORPHIC)

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: MDA12T006

    Propose development of a human-in-control (HIC) modeling capability that can: (1) represent the breadth of operator decision-making processes across missile defense elements, (2) scale to deliver the appropriate level of fidelity, and (3) be extensible to future operator needs. To provide this HIC modeling capability, we propose to develop and evaluate a full-scope prototype of Modeling Operato ...

    STTR Phase II 2014 Department of DefenseMissile Defense Agency
  3. Development of Radiation Hard 4H-SiC Power Switches and Rectifiers for Circuit Applications In Harsh Environments

    SBC: SemiSouth Laboratories            Topic: MDA04T019

    ABSTRACT: Several new high-power, long range radar systems are under development for near-term upgrades or fielding by MDA, Navy, and Marine Corps, which will use High Voltage GaAs or new WBG Semiconductors (SiC, GaN) in the transmitter/receiver. These systems will require compact, efficient, temperature tolerant power supplies and converters typically requiring a 600 V class of power devices. ...

    STTR Phase II 2005 Department of DefenseMissile Defense Agency
  4. Stratospheric Electrical Environments Applicable To Photovoltaic Arrays On HAA Platforms

    SBC: LIGHTNING TECHNOLOGIES, INC.            Topic: MDA04T008

    The objective of this program is to characterize the upper atmosphere electrical environment so that the effects of this environment on high altitude airships (HAA) and other platforms intending to operate in this environment can be determined, and protection methods developed. This includes transient luminous events (TLEs), such as red sprites and blue jets and their associated electrical propert ...

    STTR Phase II 2005 Department of DefenseMissile Defense Agency
  5. N/A

    SBC: Intelligent Automation, Inc.            Topic: N/A

    N/A

    STTR Phase II 1999 Department of DefenseMissile Defense Agency
  6. N/A

    SBC: Electron Power Systems, Inc.            Topic: N/A

    N/A

    STTR Phase II 1999 Department of DefenseMissile Defense Agency
  7. Approach to Enhancing Target Discrimination via 3D Visualization without 3D Glasses

    SBC: Intelligent Automation, Inc.            Topic: MDA05T008

    There are many factors that render automatic target recognition challenging. These include cluttered background, adverse weather and acquisition conditions, spatially closed targets, spectrally-matched decoys, and the limits on sensor resolution etc. One solution is to have a 3D display, which will help discriminate the targets. However, a major challenge in rectifying the sensor streams, i.e. to ...

    STTR Phase I 2005 Department of DefenseMissile Defense Agency
  8. Design and Development of Radiation Hardened ROIC for Multi-color LWIR/VLWIR Focal Plane Arrays

    SBC: MAGNOLIA OPTICAL TECHNOLOGIES, INC.            Topic: MDA05T009

    Radiation Hardened Multi-color infrared (IR) focal planes are required for MDA/SMDC systems applications . Key to meeting these system requirements is to develop multi-color radiation hardened HgCdTe focal plane arrays for LWIR band ( 7-14 microns) and VLWIR band with wavelength of greater than 14 microns with high pixel uniformity, reduced readout noise, improved resolution, and higher temperatur ...

    STTR Phase I 2005 Department of DefenseMissile Defense Agency
  9. Phased Array Beam Steering for High Power Lasers

    SBC: TRITON SYSTEMS, INC.            Topic: MDA13T008

    To enable new directed energy systems which are much lighter, smaller and more efficient, new types of optical phased array beam steering are required. In this Phase I STTR, Triton Systems teamed with our academic partner, will demonstrate a new family of reflective phase modulation elements based on recent advances with a new electro-optic material which has been shown to add dynamic tunability ...

    STTR Phase I 2014 Department of DefenseMissile Defense Agency
  10. Micro-Particle Debris Characterization from Hyper-Velocity Impacts

    SBC: BODKIN DESIGN & ENGINEERING LLC            Topic: MDA13T002

    An ultra-high speed visible and near-infrared (VNIR) hyperspectral radiometric temperature imager will be developed in this program. The instrument is based on a high speed hyperspectral imager spanning the wavelength range 0.4-0.9 micron and providing hyperspectral data-cubes at rates of 13,500 Hz or faster. The high speed spatial imagery provides trajectory information to determine size and spe ...

    STTR Phase I 2014 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government