You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Datagram Segregation Open Systems Service Approach

    SBC: 3 Sigma Research, Inc.            Topic: N08055

    3 Sigma Research proposes an innovative approach to develop a open architecture based data model and process for adding self-identifying information to a datagram. The power of our potential solution is in applying results from our research of Packaged Ontology Certificates to the unique performance issues with real-time processing of datagrams. Combining this with a revolutionary way of viewing ...

    SBIR Phase I 2008 Department of DefenseNavy
  2. Advanced Hybrid Thermoelectric-Solid Oxide Fuel Cell Energy Conversion for High Efficiency Portable Power

    SBC: Atrex Energy, Inc.            Topic: OSD08EP4

    The proposal would provide the design and basic product development work to augment the power generation efficiency of fuel cells developed by Acumentrics Corp. by converting waste heat into electricity by highly efficient thermoelectric (TE) power generation. Three paths will be explored in Phase I to add a TE generator to the SOFC. The first will explore the use of a material that is used in co ...

    SBIR Phase I 2008 Department of DefenseNavy
  3. Marine Portable Power Unit

    SBC: Atrex Energy, Inc.            Topic: N06105

    A conceptual design of a battery charging station with UPS back-up capability was completed under contract M67854-C-6509. The resulting system can charge up to twelve BB-2590 batteries at the maximum charging current (to minimize charging time) and provide 1000 Watts of back-up power (both AC and DC outputs are provided) for at least one hour. Individual batteries can be hot-swapped for field us ...

    SBIR Phase II 2008 Department of DefenseNavy
  4. Sniper Detection

    SBC: ADVANCED ANTI-TERROR TECHNOLOGIES CORP            Topic: N07164

    PALS for Sniper Detection (PALS-SD) is a straightforward near-term evolution of A2-T2’s existing PALS 3D for enhanced long-range facial identification technologies. Essentially, our existing multi-modal Electro-Optical/IR/Laser-Sight/Designator/Range-Finder configurations will be upgraded to include an eye-safe pulsed laser and sensor that discriminately detects reflections from eyes and optics. ...

    SBIR Phase I 2008 Department of DefenseNavy
  5. An Internet-Based Rehabilitation Program for Warriors with Hearing Loss and Auditory Processing Disorders Secondary to Blast and Traumatic Brain Injur

    SBC: ADVANCED ANTI-TERROR TECHNOLOGIES CORP            Topic: OSD08H02

    There are often secondary or tertiary effects to blast-related injuries including ear injury and hearing loss, which may also result in cognitive and linguistic deficits. The PALS medical Phase I prototype will be a modular addition to our existing technologies that assist with the rehabilitation of traumatic brain injury and gait training for patients with stroke, cerebral palsy and amputations. ...

    SBIR Phase I 2008 Department of DefenseArmy
  6. Ultra-Dense Three-Dimensional Electronics for Space

    SBC: R3LOGIC, INC.            Topic: AF073099

    R3Logic, Inc., in collaboration with Tezzaron Semiconductor will develop a rad-hard multi-core embedded processor / memory system that will be fabricated in a multi-layer 3-D integrated circuit. Phase I will focus on the system design. We will complete the RTL to GDSII synthesis of the processor and system components. The stack will incorporate Tezzaron’s patented 3-D Octopus memory, which has b ...

    SBIR Phase I 2008 Department of DefenseAir Force
  7. Power Source Materials & Subcomponents Manufacturing Improvements

    SBC: ADVANCED MEMBRANE SYSTEMS, INC.            Topic: OSD05MT2

    Manufacturers of military batteries often need raw materials that may have long lead times, limited production and/or high costs. During Phase I of this project, Advanced Membrane Systems (AMS) made some modifications and improvements to one of its products (a lithium ion battery separator), and made it suitable for Li/SO2 cell applications. Phase II of this proposal is for qualification of batter ...

    SBIR Phase II 2008 Department of DefenseNavy
  8. Hybrid Lidar-radar Receiver for Underwater Imaging Applications

    SBC: ADVANCED TECHNOLOGIES GROUP, INC.            Topic: N08032

    Our proposed receiver design will satisfy or exceed the requirements set forth in this solicitation. The key innovation is our melding of approaches – to produce a compact lightweight receiver with onboard processing that leverages picosecond timing resolution and burst acquisition methodology previously implemented by our team. The receiver architecture will utilize electronic gating, automat ...

    SBIR Phase I 2008 Department of DefenseNavy
  9. High Powered Ram Air Turbine

    SBC: ADVANCED TECHNOLOGIES GROUP, INC.            Topic: N08035

    Advanced Technologies Group, Inc. (ATG) proposes to develop an innovative High Powered Ram-Air-Turbine (HiRAT) capable of producing over 60kw of power at an air speed of 250 knots. During Phase I ATG will design, analyze and test a scaled turbine to determine feasibility. Preliminary analysis indicates that the ATG HiRAT is far superior to existing conventional turbine designs on several levels.

    SBIR Phase I 2008 Department of DefenseNavy
  10. A Compliant Outer Air Seal, (COAS)

    SBC: ADVANCED TECHNOLOGIES GROUP, INC.            Topic: A07004

    This SBIR development effort concentrates on blade tip clearance management in the high pressure turbine. Improved seals in this location of a gas-turbine engine provide the highest benefits to overall engine efficiency, service life, stability and stall margin. The COAS proposed will deliver a 3-5% decrease in SFC and a 30-50¢XC decrease in exhaust gas temperature. The ATG COAS is a non-contac ...

    SBIR Phase II 2008 Department of DefenseArmy
US Flag An Official Website of the United States Government