You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Datagram Segregation Open Systems Service Approach

    SBC: 3 Sigma Research, Inc.            Topic: N08055

    3 Sigma Research proposes an innovative approach to develop a open architecture based data model and process for adding self-identifying information to a datagram. The power of our potential solution is in applying results from our research of Packaged Ontology Certificates to the unique performance issues with real-time processing of datagrams. Combining this with a revolutionary way of viewing ...

    SBIR Phase I 2008 Department of DefenseNavy
  2. Advanced Hybrid Thermoelectric-Solid Oxide Fuel Cell Energy Conversion for High Efficiency Portable Power

    SBC: Atrex Energy, Inc.            Topic: OSD08EP4

    The proposal would provide the design and basic product development work to augment the power generation efficiency of fuel cells developed by Acumentrics Corp. by converting waste heat into electricity by highly efficient thermoelectric (TE) power generation. Three paths will be explored in Phase I to add a TE generator to the SOFC. The first will explore the use of a material that is used in co ...

    SBIR Phase I 2008 Department of DefenseNavy
  3. Marine Portable Power Unit

    SBC: Atrex Energy, Inc.            Topic: N06105

    A conceptual design of a battery charging station with UPS back-up capability was completed under contract M67854-C-6509. The resulting system can charge up to twelve BB-2590 batteries at the maximum charging current (to minimize charging time) and provide 1000 Watts of back-up power (both AC and DC outputs are provided) for at least one hour. Individual batteries can be hot-swapped for field us ...

    SBIR Phase II 2008 Department of DefenseNavy
  4. Sniper Detection

    SBC: ADVANCED ANTI-TERROR TECHNOLOGIES CORP            Topic: N07164

    PALS for Sniper Detection (PALS-SD) is a straightforward near-term evolution of A2-T2’s existing PALS 3D for enhanced long-range facial identification technologies. Essentially, our existing multi-modal Electro-Optical/IR/Laser-Sight/Designator/Range-Finder configurations will be upgraded to include an eye-safe pulsed laser and sensor that discriminately detects reflections from eyes and optics. ...

    SBIR Phase I 2008 Department of DefenseNavy
  5. Power Source Materials & Subcomponents Manufacturing Improvements

    SBC: ADVANCED MEMBRANE SYSTEMS, INC.            Topic: OSD05MT2

    Manufacturers of military batteries often need raw materials that may have long lead times, limited production and/or high costs. During Phase I of this project, Advanced Membrane Systems (AMS) made some modifications and improvements to one of its products (a lithium ion battery separator), and made it suitable for Li/SO2 cell applications. Phase II of this proposal is for qualification of batter ...

    SBIR Phase II 2008 Department of DefenseNavy
  6. Hybrid Lidar-radar Receiver for Underwater Imaging Applications

    SBC: ADVANCED TECHNOLOGIES GROUP, INC.            Topic: N08032

    Our proposed receiver design will satisfy or exceed the requirements set forth in this solicitation. The key innovation is our melding of approaches – to produce a compact lightweight receiver with onboard processing that leverages picosecond timing resolution and burst acquisition methodology previously implemented by our team. The receiver architecture will utilize electronic gating, automat ...

    SBIR Phase I 2008 Department of DefenseNavy
  7. High Powered Ram Air Turbine

    SBC: ADVANCED TECHNOLOGIES GROUP, INC.            Topic: N08035

    Advanced Technologies Group, Inc. (ATG) proposes to develop an innovative High Powered Ram-Air-Turbine (HiRAT) capable of producing over 60kw of power at an air speed of 250 knots. During Phase I ATG will design, analyze and test a scaled turbine to determine feasibility. Preliminary analysis indicates that the ATG HiRAT is far superior to existing conventional turbine designs on several levels.

    SBIR Phase I 2008 Department of DefenseNavy
  8. Forecasting IR Satellite Imagery for Adaptive Sensor Tasking

    SBC: ATMOSPHERIC & ENVIRONMENTAL RESEARCH, INC.            Topic: MDA07033

    Accurate forecasts of infrared satellite imagery are needed to optimize tasking of valuable and limited space borne surveillance assets. Atmospheric constituents such as clouds, aerosols, and water vapor can negatively impact the ability of IR surveillance systems to monitor activities on the ground. Due to their chaotic nature, atmospheric impacts are particularly severe for applications that r ...

    SBIR Phase I 2008 Department of DefenseMissile Defense Agency
  9. An Ensemble Kalman Filtering Approach for Regional Ocean Data Assimilation

    SBC: ATMOSPHERIC & ENVIRONMENTAL RESEARCH, INC.            Topic: N06099

    Current and future operational needs of the Navy require the capability to combine very large and disparate datasets with dynamical ocean numerical models to produce, in real time, accurate analyses and forecasts together with respective uncertainty estimates for any littoral region of the globe. We propose to implement a highly scalable, portable and efficient ocean data assimilation system base ...

    SBIR Phase II 2008 Department of DefenseNavy
  10. Variable Remapping of Airborne Imagery

    SBC: AERODYNE RESEARCH INC            Topic: N07018

    Cooperative targeting technologies enable F18 strike aircraft and tactical UASs (Unmanned Aircraft Systems) to work together to provide close air support, particularly in close-quarters urban combat. VRAI (“Variable Remapping of Airborne Imagery”) ties together these assets more effectively, speeding-up the visual cueing and confirmation bottleneck, insuring 1st-pass success. VRAI digitally ...

    SBIR Phase II 2008 Department of DefenseNavy
US Flag An Official Website of the United States Government