You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Long Life, Low Cost Mini-Roundabouts from Simple Modular Shapes and Recycled Material

    SBC: ZKXKZ LLC            Topic: 142FH3

    In Phase I, ZKxKZ designed, developed and demonstrated an approach for fabrication and rapid installation of low cost modular mini-roundabouts made from recycled plastic boards. Phase 1 culminated in the demonstration of half-scale 24’ diameter roundabout’s center circle made with the recycled boards. The same material and modular construction approach can be applied to other roundabout featur ...

    SBIR Phase II 2016 Department of Transportation
  2. Multimodal Alerting Interface with Networked Short-range Transmissions (MAIN-ST)

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: 161FH2

    The connected vehicles program is a multimodal U.S. DOT initiative that uses a dedicated wireless communication technology to enable safer, smarter, and greener surface transportation. While significant efforts are being made to bring motor vehicles and transportation infrastructure onto this connected network, bicycles have been largely overlooked. As a result, a significant need exists to bring ...

    SBIR Phase I 2016 Department of Transportation
  3. A Reliable Transit Passenger Counting and Re-identification System Using Occlusion Proof Biometrics

    SBC: Migma Systems Inc.            Topic: 142FT1

    Automated passenger counter has been used in the transit systems for automated passenger counting and reporting. These systems have suffered counting accuracy issues, particularly at high rider load points, and at end-of-line count reconciliation. In Phase I, we have successfully developed systems for passenger counting and re-identification. Test results using the data collected at a transit b ...

    SBIR Phase II 2016 Department of Transportation
  4. Device to Address the Competing Needs of Ensuring Lockability of Seat Belts and Mitigating Entrapment Risk

    SBC: TOOL, INC.            Topic: 142NH1

    Federal regulations require a seat belt assembly with a locking lap belt to be available in passenger seating positions to securely accommodate a child restraint system. More recently, federal regulations have been updated to improve the quality of the child restraint system and the mechanisms by which it is secured. However, there are restrictions on total weight capacities for new restraint sy ...

    SBIR Phase II 2016 Department of Transportation
  5. Pedestrian Detection, Counting and Tracking Systems for Travel Surveys, Traffic Safety Systems and Traffic Control Systems

    SBC: Migma Systems Inc.            Topic: 091FH4

    In Phase II, we developed a new system for pedestrian detection, tracking and counting. In this system, both IR LED stereo camera and laser scanner are selected for use. This Phase II system was field-tested at a few cities and achieved a counting accuracy about 97% over 5,000 pedestrians counted. The system can also stream the ped counts and images to a remote server. Based on the feedback from p ...

    SBIR Phase II 2016 Department of Transportation
  6. Innovative Transit Technology Devices, Applications,or Solutions Focused on Safety, Mobility, or Energy and Sustainability

    SBC: BCO, Incorporated            Topic: 151FT1

    Braking Rate Monitoring and Warning System 3/9/2015 Driver inattention and inaction are a major cause for serious crashes. There is a need for a low cost auxiliary system to sense any rail vehicle approaching unsafely and alert drivers. The auxiliary system will provide some form of Human Machine Interface that may aggressively alert the train operator of potential safety problems and permit a r ...

    SBIR Phase I 2015 Department of Transportation
  7. Roadway Hazard Alert System for Motorcycles

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: 151FH3

    Motorcyclists face a unique set of challenges when operating on public streets and highways. In addition to hazards relevant to automobiles, motorcycle riders must remain vigilant for hazards that pose significant danger to motorcycles (e.g., uneven terrain, sand/gravel, potholes); however, there is currently no motorcycle-specific hazard tracking or alerting system available for riders. To addres ...

    SBIR Phase I 2015 Department of Transportation
  8. Passive Rail Temperature Control Technology

    SBC: PHYSICAL SCIENCES INC.            Topic: 151FR8

    Physical Sciences Inc. proposes to develop a novel composite laminate that when applied to standard steel rails will regulate the maximum temperature reached, limiting expansion and buckling. During Phase I, PSI will work with QinetiQ North America to demonstrate the performance of PSI’s system in a simulated railroad environment. Testing will demonstrate the thermal properties of the laminate. ...

    SBIR Phase I 2015 Department of Transportation
  9. Active Personal Safety System for Train Yard and Road Crewworkers

    SBC: TECHNICAL PRODUCTS INC            Topic: 151FR2

    Locomotives weigh up to 240 ton each. -Rail cars can weigh flom 30 ton (empty) to 140 ton (loaded). Track construction and maintenance equipment, earthmoving plant and haul tiuaks can all weigh l0,s of tons each. When a 200-lb worker 'arguer;' with any of these equipment they lorse. Rail road and yard workers can, literally, be sunounded by these very large, heavy and potentially dangerous pieces ...

    SBIR Phase I 2015 Department of Transportation
  10. Pipeline Integrity Assessment Using In-Line Inspection

    SBC: JENTEK SENSORS, INC.            Topic: 132PH1

    This proposed Phase II effort will fabricate and test a working prototype ILI tool, including a pull-test on representative samples with representative defects under representative conditions. The focus is on oil pipelines, as well as gas pipelines. This program will address some pressing, high priority needs such as reliable characterization of longitudinal cracks (including cracks at ERW welds), ...

    SBIR Phase II 2015 Department of Transportation
US Flag An Official Website of the United States Government