You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MOORED INSTRUMENT HIGH SPEED ACOUSTIC TELEMETRY SYSTEM

    SBC: Datasonics, Inc.            Topic: N/A

    THERE IS A REQUIREMENT FOR A RELIABLE, SECURE METHOD FOR RETRIEVAL OF DATA FROM MOORED INSTRUMENTATION ARRAYS. THESEARRAYS, WHICH CONTAIN CURRENT METERS, TIDE GAUGES, TEMPERATURE SENSORS, AND OTHER OCEANOGRAPHIC INSTRUMENTS, ACQUIRE AND STORE DATA OVER A PERIOD OF WEEKS OR MONTHS AND THEN ARE RETRIEVED, THE RESTORED DATA RECOVERED, AND THE INSTRUMENTS REDEPLOYED. RETRIEVAL AND DEPLOYMENT IS AN EXP ...

    SBIR Phase II 1991 Department of Commerce
  2. ON-BOARD PROCESSING OF DOGFISH AND SKATES

    SBC: Fisherman Joint Venture            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Commerce
  3. LARGE-FORMAT REAL-TIME X-RAY IMAGERS

    SBC: NANOPTICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Commerce
  4. REMOTE SENSING OF ESTUARINE AND NEAR-COAST SALINITY

    SBC: PROSENSING INC.            Topic: N/A

    RESEARCH IS PROPOSED TO DESIGN A MICROWAVE REMOTE SENSING SYSTEM TO CONDUCT AIRBORNE REMOTE SENSING MEASUREMENTS IN COASTAL AREAS UTILIZING RELATIVELY SMALL AIRCRAFT. THE SYSTEM WILL INCORPORATE AT LEAST ONE MICROWAVE RADIOMETER OPERATING AT 1.4 GHZ (L-BAND). A TRADE-OFF STUDY WILL BE DONE TO DETERMINE THE BEST WAY TO REMOTELY MEASURE SEA SURFACE TEMPERATURE, WHICH IS NEEDED TO PROVIDE CORRECTIONS ...

    SBIR Phase II 1991 Department of Commerce
  5. FEASIBILITY OF A C-BAND SCATTEROMETER TO REMOTELY SENSE HURRICANE PARAMETERS

    SBC: PROSENSING INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Commerce
  6. PRELIMINARY EVALUATION OF NEW UV/VUV RADIOMETRIC STANDARDS

    SBC: VISIDYNE, INC.            Topic: N/A

    THERE ARE ONLY A FEW RADIOMETRIC STANDARDS AVAILABLE IN THE 115-350 NM WAVELENGTH REGION. AMONG THEM ARE THE ARGON MINI-ARC AND THE DEUTERIUM LAMP. BOTH LAMPS PROVIDE STABLE SOURCES OF UV/VUV RADIATION, AND CAN BE CALIBRATED BOTH IN RADIANCE AND IRRADIANCE. HOWEVER, EACH HAS DISADVANTAGES THAT LIMIT ITS USEFULNESS AS A BENCHTOP OR SPACE-QUALIFIED STANDARD. ONE POSSIBLE ALTERNATIVE SECONDARY RADIOM ...

    SBIR Phase I 1991 Department of Commerce
US Flag An Official Website of the United States Government