You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DADTMA Gen3- Distributed Acquisition Digital Twin Maintenance Architecture
SBC: FTL LABS CORP Topic: N204A01Digital twins can be imagined as virtual, continuously-learning digital representations of physical assets. Such simulations have the potential to marry virtual and physical understanding of assets such that analog data from the physical product and its surrounding sustainment ecosystem is converted into digital data that is stored, analyzed, modeled, and learned by artificial neural networks (NNs ...
SBIR Phase II 2023 Department of DefenseNavy -
A Wavelength-Scalable Dual-Stage Photonic Integrated Circuit Spectrometer
SBC: PHYSICAL SCIENCES INC. Topic: N19AT023In this program, Physical Sciences Inc. (PSI) will team with Professor Ali Adibi’s group at the Georgia Institute of Technology to develop a photonic integrated circuit (PIC) spectrometer that can simultaneously achieve high-resolution over wide-bandwidths using a scalable and foundry-ready approach. While a PIC-based spectrometer is a key component for on-chip Raman, fluorescence, and absorptio ...
STTR Phase II 2020 Department of DefenseNavy -
Modular Collapsible Hydro-Electric Generator (MCHEG)
SBC: PHYSICAL SCIENCES INC. Topic: N212102The US Marine Corps needs a portable, hydroelectric generator to provide electrical energy to recharge batteries and power equipment. Electrical energy used in the field today is primarily generated using diesel generators. Having the option to use an energy source present in the environment, such as a river or stream, reduces the need to transport and store fuel. In order to meet the Marine Corps ...
SBIR Phase II 2023 Department of DefenseNavy -
Manufacture of 2,5-Furandicarboxylic Acid from Furfural Produced from a Lignocellulosic Waste Stream
SBC: KSE, INC. Topic: 81The goal of this Phase II SBIR program is to evaluate optimize and demonstrate noveltechnology to convert lignocellulose waste streams into a value-added building-block chemicalspecifically 25-Furandicarboxylic acid (FDCA) at pilot-scale.FDCA is targeted to replacepetroleum-based chemicals used extensively in the textiles polyesters and plastics industries.As adrop-in replacement for petroleum-bas ...
SBIR Phase II 2023 Department of Agriculture -
Remote Autonomous Detection System (RADS) for early detection and identifcation of the Red Imported Fire Ant (RIFA)
SBC: GearJump Technologies LLC Topic: 813Project SummaryTitle: The Remote Autonomous Detection System (RADS) for Early Detection of the RedImported Fire Ant (RIFA)PIElman NoelInstitutionGearJump Technologies LLCCo-PIVander Meer RobertInstitutionUSDAThe Red Imported Fire Ants (RIFA) infest over 140 million hectares in the USA and costAmericans an estimated $8 billion annually for control and damage repair in several economicsectors includ ...
SBIR Phase II 2023 Department of Agriculture -
Novel peptides for controlling invasive pest ants
SBC: FORESIGHT SCIENCE & TECHNOLOGY INC Topic: 82PROJECT SUMMARYTitle: Novel peptides for controlling invasive pest ants.PI: Dr. Satya Prabhakar Chinta Foresight Science & Technology Inc.Collaborators: Dr. Robert Vander Meer and Dr. Man-Yeon Choi USDA Agricultural ResearchService.Foresight Science & Technology Inc. (Foresight) and the USDA Agricultural ResearchService (ARS) are collaborating in the development and commercialization of a novel ne ...
SBIR Phase II 2023 Department of Agriculture -
Heterologous Synthesis of Polyunsaturated Fatty Acids for Aquaculture
SBC: XYLOME CORP Topic: 87Heterologous Synthesis of Polyunsaturated Fatty Acids for AquacultureUSDA SBIR Phase II Applicationth The United States is a minor aquaculture producer ranking 18 in global aquaculture productionin 2022 but it is the leading importer of fish and fish products. Even though U.S. aquaculture hasbeen estimated to be growing at a compound annual rate of 4.1% we still depend heavily uponimports. By valu ...
SBIR Phase II 2023 Department of Agriculture -
A Fluidized Bed Photocatalytic Reactor for Nitrate Conversion
SBC: PANI CLEAN INC Topic: 84PROJECT SUMMARYOpportunity: Nitrate contamination has emerged as the most pervasive groundwater pollutant inNorth America predominantly originating from agricultural activities and shifting nitrogen inputsto land surfaces. In the United States over 7 million people rely on community water systems(CWS) with nitrate concentrations exceeding the maximum contaminant level (MCL). A rigorouspeer-reviewe ...
SBIR Phase II 2023 Department of Agriculture -
Real-Time Mapping of Hydroxylamine and Other Trace Gases in Soil
SBC: AERODYNE RESEARCH INC Topic: 84Real-Time Mapping of Hydroxylamine and Other Trace Gases in SoilPI: Joseph Roscioli Aerodyne Research Inc.Project SummaryThe nitrogen cycle is fundamentally important to ecosystem health crop productivity foodsecurity biosphere-atmosphere exchange air quality and climate change.The processes thatdrive nitrogen transformations in soil are influenced by environmental conditions that can exhibitlarge ...
SBIR Phase II 2023 Department of Agriculture -
MIRK for In-Water Delamination Detection
SBC: PROMETHEUS INC. Topic: N131037We will integrate the Phase I demonstrated physics, modeling, simulations, nondestructive evaluation and Materials Identification Reflectivity Kernel (MIRK) discrimination technologies into a prototype for detecting Special Hull Treatment (SHT) delamination in water for significant cost savings and risk mitigation for the Navy. The resultant technology transition will focus on VIRGINIA and COLUMBI ...
SBIR Phase II 2018 Department of DefenseNavy