You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. IMAGING INFRARED SCENE PROJECTOR

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  2. PERSONAL DIGITAL NEUTRON DOSIMETER

    SBC: RADIATION MONITORING DEVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  3. USE OF ROBOTICS IN AUTOMATIC FACTORY ASSEMBLY

    SBC: ANALYTICAL BIOLOGICAL SERVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  4. THE PURPOSE OF THE PROPOSED RESEARCH IS TO INVESTIGATE THE FEASIBILITYOF MONITORING BOTH SUBMARINE VELOCITY AND SEA ENVIRONMENT WITH A NOVEL ELECTROCHEMICAL SENSOR.

    SBC: Cape Cod Research            Topic: N/A

    THE PURPOSE OF THE PROPOSED RESEARCH IS TO INVESTIGATE THE FEASIBILITYOF MONITORING BOTH SUBMARINE VELOCITY AND SEA ENVIRONMENT WITH A NOVEL ELECTROCHEMICAL SENSOR. THE PROPOSED SENSOR CONSISTS OF CATALYZED METAL FILMS WHICH COAT A QUARTZ DISK MOUNTED FLUSH WITH THE DECK. THE RESEARCH FOCUSES ON DEVELOPING SENSORS WITH ELECTRODE GRIDS FINE ENOUGH SO THAT DETECTION OF CHANGES IN CONCENTRATION BOUND ...

    SBIR Phase I 1984 Department of DefenseNavy
  5. A NOVEL APPROACH TO RAM COATING

    SBC: Damaskos, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  6. FABRICATION AND EVALUATION OF TITANIUM MATRIX CERMET COMPOSITES FOR HIGH MODULUS AND HIGH TEMPERATURE APPLICATIONS

    SBC: DYNAMET TECHNOLOGY, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  7. THE PROPOSED PROGRAM RELATES TO THE EVALUATION OF THE POTENTIAL OF A NEW CLASS OF CATHODE MATERIALS FOR IMPROVED PERFORMANCE/ENERGYDENSITY LITHIUM SECONDARY BATTERIES.

    SBC: ECO ENERGY CONVERSION            Topic: N/A

    THE PROPOSED PROGRAM RELATES TO THE EVALUATION OF THE POTENTIAL OF A NEW CLASS OF CATHODE MATERIALS FOR IMPROVED PERFORMANCE/ENERGYDENSITY LITHIUM SECONDARY BATTERIES. AN IMPROVED SECONDARY BATTERY WILL PROVIDE THE NAVY WITH A SAFE AND RELIABLE POWER SOURCE FOR PORTABLE COMMUNICATION SYSTEMS, REMOTE SENSORS, AND OTHER ELECTRONIC EQUIPMENT. THE MAJOR OBJECTIVE OF THE PROGRAM IS TO DETERMINE THE LIT ...

    SBIR Phase I 1984 Department of DefenseNavy
  8. THE PROPOSED PROGRAM RELATES TO THE EVALUATION OF A NEW CLASS OF CATHODE MATERIALS FOR IMPROVED PERFORMANCE/ ENERGY DENSITY LITHIUM SECONDARY BATTERIES.

    SBC: ECO ENERGY CONVERSION            Topic: N/A

    THE PROPOSED PROGRAM RELATES TO THE EVALUATION OF A NEW CLASS OF CATHODE MATERIALS FOR IMPROVED PERFORMANCE/ ENERGY DENSITY LITHIUM SECONDARY BATTERIES. AN IMPROVED SECONDARY BATTERY WILL PROVIDE THE NAVY WITH A SAFE AND RELIABLE POWER SOURCE FOR PORTABLE COMMUNICATION SYSTEM, REMOTE SENSORS, AND OTHER ELECTRONIC EQUIPMENT. THE MAJOR OBJECTIVE OF THE PROGRAM IS TO DETERMINE THE LITHIATION CAPACITY ...

    SBIR Phase I 1984 Department of DefenseNavy
  9. SCHOTTKY BARRIER PHOTOELECTRODES WITH VARIABLE BARRIER HGHT

    SBC: EIC LABORATORIES, INC.            Topic: N/A

    THE OBJECTIVE OF THIS RESEARCH IS TO INVESTIGATE THE PROPERTIES OF SCHOTTKY BARRIERS FORMED BETWEEN SEMICONDUCTORS AND ION INSERTION COMPOUNDS HAVING CONTINUOUSLY VARIABLE STOICHIOMETRIES AND WORK FUNCTIONS. IN PHASE I, THE DIODE P-SI/MXWO3 (M=H, LI, 0

    SBIR Phase II 1984 Department of DefenseNavy
  10. ANTI-REFLECTIVE WINDOW COATINGS

    SBC: Evaporated Coatings, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
US Flag An Official Website of the United States Government