You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Annular Gas Jet Anode for Decade
SBC: ALAMEDA APPLIED SCIENCES CORPORATION Topic: DTRA04010Alameda Applied Sciences Corporation (AASC) proposes to replace the anode posts of a soft x-ray z-pinch with an azimuthally symmetric shell of high density, low atomic number gas. Once ionized, the gas column carries the current and eliminates particulate debris that is otherwise generated by the return rods. The gas shell also absorbs unwanted UV and hence eliminates the first Li foil filter of t ...
SBIR Phase II 2006 Department of DefenseDefense Threat Reduction Agency -
Electrical Contacts and Packaging for Diamond and Diamondlike High-Power Devices
SBC: ALAMEDA APPLIED SCIENCES CORPORATION Topic: AF06189The purpose of this Phase-I SBIR is to demonstrate the feasibility of using filtered cathodic arc deposition (FCAD) to fabricate improved metal multilayer Ohmic and Schottky contacts to CVD diamond. Polycrystalline CVD diamond substrates will be acquired, on which eight Ohmic and two Schottky contact metal multilayer architectures will be fabricated using FCAD. Linear transmission line model (LTLM ...
SBIR Phase I 2006 Department of DefenseAir Force -
A fast pulse, intermediate flux, bench-top, high rep-rate x-ray source for PRS diagnostic calibration
SBC: ALAMEDA APPLIED SCIENCES CORPORATION Topic: DTRA06013DTRA requires reliable X-ray sources to irradiate test objects for customers. One key component of test object irradiation is reliable radiation diagnostics to measure the dose and dose-rate to test objects. Current radiation diagnostics possess unacceptable levels of variation. Alameda Applied Sciences Corp proposes the use of a dense plasma focus device as a flat field X-ray calibration sourc ...
SBIR Phase I 2006 Department of DefenseDefense Threat Reduction Agency -
An Artificial Myocardium for Pediatric Support
SBC: ABIOMED, INC. Topic: N/ADESCRIPTION (provided by applicant): The ultimate objective of this proposed program is the commercialization of a neonate ventricular assist device (VAD). Although VADs, both implantable and paracorporeal, have become an important surgical option for adult patients with myocardial failure unresponsive to less aggressive therapy, no VADs are commercially available for short-term use in small infan ...
SBIR Phase II 2006 Department of Health and Human ServicesNational Institutes of Health -
SBIR Phase I: Nanocable Structures- Material Growth and Characterization
SBC: ABM Topic: ELThis Small Business Innovation Research (SBIR) Phase I project seeks to assess the feasibility of a completely new semiconductor radial heterostructure (e.g. CdTe/Au) with modulated composition and fabrication method for very low cost, highly efficient nanostructured solar cells application. This technology would enable the integration of the metal /semiconductor junction into nanostructures that ...
SBIR Phase I 2006 National Science Foundation -
Secure Processors
SBC: ACCORD SOLUTIONS, INC Topic: OSD05A10Accord proposes a pioneering and innovative code-to-machine execution technology that preserves the encryption of executable instructions and data throughout all aspects of the execution cycle. At no time are instruction words or data values unencrypted. Crypto-reduced-instruction-processor-trusted-computers (CRIPTC) are not dependent upon reconfiguration or on machine uniqueness. CRIPTC memory an ...
SBIR Phase I 2006 Department of DefenseArmy -
Anti-Tamper Active and Passive Sensors for Use Inside an Integrated Circuit
SBC: ACCORD SOLUTIONS, INC Topic: A06030The innovative in-chip sensor technology, integrated chip protection (ICP), proposed by Accord provides a new hardware design and production technique to delay reverse engineering and exploitation, denying an adversary information about the chip design. The target product is a device that secures integrated circuits from reverse engineering. Intrusive attacks, including minute modifications to a c ...
SBIR Phase I 2006 Department of DefenseArmy -
ECM Bioscaffold for ASD Repair
SBC: ACELL, INC. Topic: N/ADESCRIPTION (provided by applicant): This Phase I proposal seeks support to evaluate the feasibility of developing an extracellular matrix (ECM) biologic scaffold as a repair device for atrial septal defects (ASD). ASDs are one of the most common forms of congenital heart disease and account for approximately 30-40% of all congenital heart defects seen in adults. Closure of an ASD can be performed ...
SBIR Phase I 2006 Department of Health and Human ServicesNational Institutes of Health -
Autonomous Self-powered (ASP) Structural Health Monitoring system
SBC: ACELLENT TECHNOLOGIES INC Topic: A04163Acellent Technologies has proposed to develop a self-powered structural health monitoring system for use in monitoring of mission critical structures such as missiles or combat vehicles in the field. The system will be completely autonomous having the capabilities for (1) Energy harvesting for self-power generation, (2) Integrated sensors for robustness, (3) Sensor self-calibration for improved re ...
SBIR Phase II 2006 Department of DefenseArmy -
Condition Based Maintenance of Space Exploration Vehicles Using Structural Health Monitoring
SBC: ACELLENT TECHNOLOGIES INC Topic: N/AAcellent Technologies proposes to develop an autonomous and automated diagnostic system for condition based maintenance (CBM) of safety critical structures for space exploration vehicles. The proposed system will provide real-time information on the integrity of critical structures on launch vehicles, improve their performance, and greatly increase crew safety while decreasing inspection costs. Th ...
SBIR Phase I 2006 National Aeronautics and Space Administration