You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCESS: A COMMUNICATING AND COOPERATING EXPERT SYSTEMS SYSTEM

    SBC: SYMBIOTECH, INC.            Topic: N/A

    THE INTENT OF THIS PROJECT IS TO PROVIDE A SOFTWARE ENVIRONMENT WHICH WILL ALLOW IMMEDIATE IMPLEMENTATION OF A VARIETY OF COOPERATING EXPERT SYSTEM PARADIGMS. THE ENVIRONMENT, REFERRED TO AS ACCESS, WILL BE DESIGNED TO BE EXPERT SYSTEM REPRESENTATION INDEPENDENT, BE PORTABLE TO ANY HARDWARE WHICH SUPPORTS COMMON LISP, PROVIDE A FLEXIBLE MESSAGE PASSING PROTOCOL AND ALLOW THE USER TO ARRANGE EXPERT ...

    SBIR Phase II 1989 Department of DefenseArmy
  2. ACCIDENT INVESTIGATION TECHNIQUES FOR AIRCRAFT ELECTRICAL/ELECTRONIC SYSTEMS USING METALLURGICAL AND OTHER PROPERTIES OF MATERIALS

    SBC: Failure Analysis Associates            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseAir Force
  3. ACCURATE PASSIVE RANGING TECHNIQUES

    SBC: ADCOM SYSTEMS TECHNOLOGY,INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseNavy
  4. ACOUSTICALLY DAMPED TORPEDO PROPELLERS

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    TORPEDO PROPELLERS ARE EXPOSED TO TIME VARYING UNSTEADY FORCES. THESE WATER INDUCED LOADS CREATE BLADE VIBRATIONS WHICH GENERATE NOISE. FOSTER-MILLER PROPOSES TO CHARACTERIZE AND OPTIMIZE THE HIGH DAMPING AND EXCELLENT STRUCTURAL PROPERTIES OF GRAPHITE FIBER REINFORCED MAGNESIUM METAL MATRIX COMPOSITES. AN ALIGNED, DISCONTINUOUS FIBER PREFORM WILL BE DEVELOPED TO ENHANCE THE INHERENT STRENGTH AND ...

    SBIR Phase I 1989 Department of DefenseNavy
  5. ACTIVE CANCELLATION OF ROTOR ACOUSTIC SIGNATURES

    SBC: Tech Integration-dev Group Inc            Topic: N/A

    A HIGHLY EFFICIENT CONCEPT IS PROPOSED WHICH WILL SUBSTANTIALLY REDUCE ACOUSTIC SIGNATURES OF HELICOPTERS AND TILT ROTOR AIRCRAFT. THE CONCEPT CAN BE INCORPORATED INTO FUTURE HELICOPTER DESIGNS WITHOUT ANY OBVIOUS, WEIGHT OR PERFORMANCE PENALTIES. THE CONCEPT WILL PRODUCE REDUCTION OF SOUND RADIATION IN ALL DIRECTIONS OVER ALL FLIGHT SPEEDS WITH MINIMAL PROCESSING.

    SBIR Phase I 1989 Department of DefenseDefense Advanced Research Projects Agency
  6. ACTIVE SONAR RANGE DOPPLER NORMALIZATION FOR LARGE CONTINUOUS WAVE (CW) TRANSMISSION

    SBC: MASSA PRODUCTS CORPORATION            Topic: N/A

    AN ACTIVE SONAR SYSTEM IS PROPOSED THAT WILL ELIMINATE THE ADVERSE EFFECTS OF REVERBERATION IN LONG CONTINUOUS WAVE (CW) ACOUSTIC TRANSMISSIONS. THE UNIQUE SYSTEM EMPLOYS A CIRCLE DETECTOR PROCESSOR THAT WILL DETECT A TARGET WITH A SMALL DOPPLER SHIFT EVEN WHEN IT IS BURIED IN REVERBERATIONS WITH THE SIGNAL TO NOISE RATIO AS LOW AS -26 DB.

    SBIR Phase I 1989 Department of DefenseNavy
  7. ADVANCED LIQUID CRYSTAL POLYMER COATINGS FOR HIGH STRENGTH OPTICAL FIBERS FOR AIR-DEPLOYED DATA LINKS

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    SMALL DIAMETER HIGH STRENGTH OPTICAL FIBERS ARE NEEDED FOR NEW HIGH SPEED AIR-DEPLOYED DATA LINKS. CURRENT FIBER COATING TECHNOLOGY HAS BEEN DEVELOPED FOR THE TELECOMMUNICATIONS INDUSTRY AND CANNOT MEET MILITARY PERFORMANCE NEEDS. FIBER COATING THICKNESS MUST BE REDUCED, BUT THIS RESULTS IN LOW TENSILE STRENGTH USING CONVENTIONAL COATING MATERIALS (UV CURABLE ACRYLATES FOR EXAMPLE). WE PROPOSE TO ...

    SBIR Phase I 1989 Department of DefenseNavy
  8. ADVANCED ORDERED POLYMER/GLASS MICROCOMPOSITES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseAir Force
  9. A HIGH STRENGTH TO WEIGHT, LOW COST BRIDGE DECK IS REQUIRED FOR THE ARMY'S TRI-ARCH BRIDGE.

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    A HIGH STRENGTH TO WEIGHT, LOW COST BRIDGE DECK IS REQUIRED FOR THE ARMY'S TRI-ARCH BRIDGE. FOSTER-MILLER, INC. IS PROPOSING FIBER REINFORCED THERMOPLASTIC DECK MADE BY A COMBINATION OF ROLL-FORMING AND WELDING. USE OF AN ENGINEERING THERMOPLASTIC MATRIX MATERIAL SUCH AS POLYETHERETHERKEYTONE (PEEK) PROMISES TO OVERCOME MANY OF THE DISADVANTAGES WHICH HAVE PREVENTED THERMOSETTING EPOXIES FROM BEIN ...

    SBIR Phase I 1985 Department of DefenseArmy
  10. AI FOR COMMAND AND CONTROL DECISION AIDS

    SBC: Con-solve Inc.            Topic: N/A

    THE PROPOSED WORK WILL BUILD UPON EXISTING TERRAIN MODELING AND ARTIFICAL INTELLIGENCE SYSTEMS TO DEVELOP A PROTOTYPE COMMAND AND CONTROL DECISION AID FOR ARMY COMMANDERS AND STAFF. A PROTOTYPE WILL BE DEVELOPED DURING PHASE I. THE NEW SYSTEM "TERRAIN PLAN," WILL BE IMPLEMENTED IN COMMAND LISP ON UNIX-BASED ENGINEERING WORKSTATIONS. TERRAIN PLAN WILL USE AN AI-BASED DECISION SUPPORT CORE TO UNIFY ...

    SBIR Phase I 1989 Department of DefenseArmy
US Flag An Official Website of the United States Government