You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Case Resource for Cognitive Task Analysis

    SBC: APTIMA INC            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseNavy
  2. A Compact Airborne Passive Polarimeter for Ocean Surface Wind Vector Measurement

    SBC: PROSENSING INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of Commerce
  3. A Cost-Effective Automatic Balloon Launcher

    SBC: VISIDYNE, INC.            Topic: N/A

    Not Available Over 35 W of power can be generated by a single fiber laser in a coherent, diffraction-limited beam, with a high quantum efficiency over 85%. The output power of a single fiber laser is however limited by intrinsic non-linear effects. We propose to coherently combine several fiber lasers in order to overcome such limitation. This work will build upon work by Rediker and Leger, and o ...

    SBIR Phase I 1999 Department of Energy
  4. Actively Cooled Switch Cell

    SBC: Rct Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseDefense Advanced Research Projects Agency
  5. Actuators and Transducers from Single Crystal Piezoelectric Materials

    SBC: IMAGE ACOUSTICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseNavy
  6. Adaptive Data Rate Control

    SBC: LINCOM CORP.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseAir Force
  7. Adaptive Daylighting Control System

    SBC: Orion Engineering Company            Topic: N/A

    N/A

    STTR Phase I 1999 Department of Energy
  8. Adaptive Human/Machine Interface for Advanced Air Traffic Management

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 National Aeronautics and Space Administration
  9. ADHER: Adherent Durable Hydrophobic Epoxy Resin Formulation for Underwater Hull Touch-Up Repair

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseNavy
  10. A Diode Laser Sensor for High Precision Measurement of Terrestrial CO2 Sources and Sinks

    SBC: PHYSICAL SCIENCES INC.            Topic: N/A

    Not Available The painting, stripping, and repainting processes for existing aircraft account for 70-90% of the U.S. Air Force's generation of hazardous wastes and air pollution. The costs for paint repaint maintenance of aircraft range from ~$250,000 for a C-135 to ~$1 million for a C-5. Due to declining budgets, the Air Force expects that ~80% of the older aircraft will still be in the flight i ...

    SBIR Phase I 1999 Department of Energy
US Flag An Official Website of the United States Government