You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A PERSONAL-COMPUTER-BASED WORKSTATION FOR THE ADVANCED THER-MAL HYDRAULIC ENERGY NETWORK ANALYZER

    SBC: Ei International Inc.            Topic: N/A

    IT IS PLANNED TO DEVELOP A WORKSTATION ENVIRONMENT FOR THE ADVANCED THERMAL HYDRAULIC ENERGY NETWORK ANALYZER (ATHENA) CODE TO FACILITATE FUSION REACTOR DESIGN STUDIES. ATHENA HAS A WIDE RANGE OF CAPABILITIES AND IS AN ESSENTIAL TOOL FOR THE STUDY OF FUSION REACTOR DESIGN. THE PERSONAL-COMPUTER (PC)-BASED WORKSTATION ENVIRONMENT FOR ATHENA WILL STREAMLINE AND AUTOMATE THE DEVELOPMENT OF INPUTDECKS ...

    SBIR Phase I 1988 Department of Energy
  2. A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY

    SBC: Ei International Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  3. A SPONTANEOUS ELECTROCHEMICAL CLAUS PROCESS FOR SULFUR RECOVERY

    SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED            Topic: N/A

    THIS PROJECT IS DIRECTED TOWARD DEVELOPING THE SCIENTIFIC AND TECHNICAL INSIGHT NECESSARY FOR EVALUATING THE UTILITY OF A SOLID OXIDE FUEL CELL COMPATIBLE WITH THE DIRECT ELECTROCHEMICAL OXIDATION OF H(2)S. THIS APPROACH, WHICH FORMS THE BASIS OF AN ELECTROCHEMICAL CLAUS-TYPE PROCESS FORSULFUR REMOVAL, WILL STUDY CELLS POSSESSING THE GENERAL CONFIGURATIONS: H(2)S,AS(2)/ZRO(2)(8(W)%Y(2)O(3))/LA(0.8 ...

    SBIR Phase I 1988 Department of Energy
  4. CRYOGENIC RADIO FREQUENCY WINDOW DEVELOPMENT

    SBC: GENESIS LABORATORIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  5. HIGH-SPEED, HIGH-RESOLUTION ULTRASONIC NDT/E OF SUPERCONDUCTING MAGNET MONO-AND MULTIFILAMENTARY WIRE

    SBC: Sonoscan Inc            Topic: N/A

    DEVELOPMENT OF AN ULTRASONIC, NONDESTRUCTIVE TEST DEVICE FOR INSPECTION OF MONOFILAMENT ROD AND POTENTIALLY MULTIFILAMENTARY WIRE FOR SUPERCONDUCTING MAGNETS IS THE LONG-TERM GOAL OF THIS PROJECT. THE ROD AND WIRE TO BE INSPECTED ARE THE HIGH CRITICAL-CURRENT CONDUCTORS USED IN HIGH FIELD MAGNETS PROPOSED FOR PARTICLE ACCELERATORS. THERE IS NO ESTABLISHED TECHNIQUE FOR DETECTING FLAWS IN SMALL DIA ...

    SBIR Phase II 1988 Department of Energy
US Flag An Official Website of the United States Government