You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A SYNTHETIC BEAM SONAR SYSTEM FOR MOBILE ROBOTS AND TELEOPERATORS

    SBC: Cybermation Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  2. A PERSONAL-COMPUTER-BASED WORKSTATION FOR THE ADVANCED THER-MAL HYDRAULIC ENERGY NETWORK ANALYZER

    SBC: Ei International Inc.            Topic: N/A

    IT IS PLANNED TO DEVELOP A WORKSTATION ENVIRONMENT FOR THE ADVANCED THERMAL HYDRAULIC ENERGY NETWORK ANALYZER (ATHENA) CODE TO FACILITATE FUSION REACTOR DESIGN STUDIES. ATHENA HAS A WIDE RANGE OF CAPABILITIES AND IS AN ESSENTIAL TOOL FOR THE STUDY OF FUSION REACTOR DESIGN. THE PERSONAL-COMPUTER (PC)-BASED WORKSTATION ENVIRONMENT FOR ATHENA WILL STREAMLINE AND AUTOMATE THE DEVELOPMENT OF INPUTDECKS ...

    SBIR Phase I 1988 Department of Energy
  3. A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY

    SBC: Ei International Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  4. FABRICATION OF HIGH TEMPERATURE SUPERCONDUCTOR FILAMENTS FROM METAL-CONTAING POLYMERIC PRECURSORS

    SBC: FIBERTEK, INC.            Topic: N/A

    THE USE OF METAL-CONTAINING POLYMERS AS PRECURSORS TO HIGH CRITICAL TEMPERATURE (T(C)) SUPERCONDUCTING FILAMENTS WILL BE EXPLORED THROUGH A PROPRIETARY LOW-TEMPERATURE SOLUTION SYNTHESIS. CAREFUL EVALUATION OF THE PERTINENT CHEMICAL LITERATURE WILL BE DONE TO OPTIMIZE THE STARTING MATERIAL COMBINATION AND TO HELP DETERMINE ADEQUATE EXPERIMENTAL CONDITIONS THAT WILL YIELD A HOMOGENEOUS, POLYMERIC P ...

    SBIR Phase I 1988 Department of Energy
  5. A HIGH POWER MICROWAVE AMPLIFIER BASED ON TRANSVERSE MODULATION

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  6. AN INVESTIGATION AND DEVELOPMENT OF THE COLLECTIVE INTERACTION KLYSTRON

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    AN EXPERIMENTAL, THEORETICAL, AND NUMERICAL PROGRAM IS PLANNED TO DEVELOP AND STUDY A NOVEL, HIGH-POWER MICROWAVE SOURCE, THE COLLECTIVE INTERACTION KLYSTRON (CIK). THIS DEVICE PROMISES TO BE A HIGHLY EFFICIENT, COMPACT SOURCE IN THE 1- TO 10-GHZ RANGE, AND ALTERNATE CONFIGURATIONS THAT EXTEND THE OPERATION TO HIGHER FREQUENCIES ARE POSSIBLE. LINEAR THEORY PREDICTS VERY HIGH GROWTH RATES AND STRON ...

    SBIR Phase II 1988 Department of Energy
  7. THE DESIGN AND DEVELOPMENT OF AN ELECTRON BEAM DEFLECTION DIAGNOSTIC TOOL

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  8. A PINHOLE ANALYZER FOR THE CHARACTERIZATION OF GYRATING ELECTRON BEAMS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  9. A FIBER OPTIC PRESSURE SENSOR FOR USE IN WELLBORES

    SBC: Optech            Topic: N/A

    PRESSURE MEASUREMENTS DEEP IN GEOTHERMAL WELLBORES PROVIDE SOME OF THE MOST VALUABLE DATA FOR MEASURING THE PRODUCTIVITY OF GEOTHERMAL WELLS AND FOR ASSESSING RESERVOIRCHARACTERISTICS. WELLBORES HAVE VERY HIGH PRESSURE AND VERY LOW PH, BUT, MOST SIGNIFICANTLY, THEY HAVE VERY HIGH TEMPERATURES (UP TO 350 DEGREES CENTIGRADE) THAT PRECLUDE PRESENT PRESSURE MEASURING INSTRUMENTATION FROM OPERATING ADE ...

    SBIR Phase I 1988 Department of Energy
  10. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    HIGH POWER, CW (CONTINUOUS WAVE) SOURCES AT FREQUENCIES NEAR 300 GHZ ARE NEEDED FOR ELECTRON CYCLOTRON HEATING IN ADVANCED MAGNETIC FUSION DEVICES SUCH AS THE CIT (COMPACT IGNITION TOKAMAK). RECENT DEVELOPMENTS IN GYROTRONS HAVE PUSHED THE STATE OF THE ART TO 100 KW CW AT 140 GHZ. ONE MEGAWATT AT 140 GHZ APPEARS FEASIBLE, BUT NEARTO THE LIMIT OF THE CURRENT FORM OF THE GYROTRON. THE QUASI-OPTICAL ...

    SBIR Phase II 1988 Department of Energy
US Flag An Official Website of the United States Government