You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AFFINITY COUPLING OF RECEPTORS ON MICROCHIPS

    SBC: SURMODICS, INC.            Topic: N/A

    REAGENTS AND REACTION PROCEDURES WILL BE DEVELOPED DURING PHASE I FOR THE COUPLING OF ANTIBODY MOLECULES TO THE ACTIVATED SURFACE OF MICROCHIP CAPACITANCE SENSORS. PROPRIETARY PHOTOAFFINITY REAGENTS WILL BE SYNTHESIZED AND COUPLED TO THE ELECTRODE SURFACE FOR SPECIFIC COVALENT BINDING OF MONOCLONAL ANTIBODY (USING ONE OF THE TWO ANTIBODY BINDING SITES). THIS WILL LEAVE THE REMAINING STABILIZED ANT ...

    SBIR Phase I 1989 Department of Energy
  2. A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY

    SBC: Ei International Inc.            Topic: N/A

    THIS PROJECT WILL ANALYZE AND PREPARE THE CONCEPTUAL DESIGN FOR A DIGITAL FEEDWATER CONTROL SYSTEM FOR A COMMERCIAL LIGHT WATER REACTOR POWERPLANT. THE CONTROL SYSTEM WILL FEATURE SENSOR VALIDATION AND REPLACEMENT OF FAILED SENSORS WITH SYNTHETIC VARIABLES. AN ADVANCED TECHNIQUE BASED ON PATTERN-RECOGNITION ALGORITHMS ALREADY PROVEN IN SURVEILLANCE APPLICATIONS WILL BE USED TO VALIDATE SENSOR INPU ...

    SBIR Phase II 1989 Department of Energy
  3. A PERSONAL-COMPUTER-BASED WORKSTATION FOR THE ADVANCED THER-MAL HYDRAULIC ENERGY NETWORK ANALYZER

    SBC: Ei International Inc.            Topic: N/A

    IT IS PLANNED TO DEVELOP A WORKSTATION ENVIRONMENT FOR THE ADVANCED THERMAL HYDRAULIC ENERGY NETWORK ANALYZER (ATHENA) CODE TO FACILITATE FUSION REACTOR DESIGN STUDIES. ATHENA HAS A WIDE RANGE OF CAPABILITIES AND IS AN ESSENTIAL TOOL FOR THE STUDY OF FUSION REACTOR DESIGN. THE PERSONAL-COMPUTER (PC)-BASED WORKSTATION ENVIRONMENT FOR ATHENA WILL STREAMLINE AND AUTOMATE THE DEVELOPMENT OF INPUTDECKS ...

    SBIR Phase I 1988 Department of Energy
  4. A DIGITAL FEEDWATER CONTROL SYSTEM WITH SENSOR VALIDATION AND ANALYTIC REDUNDANCY

    SBC: Ei International Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  5. THE DEVELOPMENT OF HIGH ELECTRICAL GRADIENT, DC ACCELERATOR TUBES WITH ELECTRICAL BREAK- DOWN PROTECTION

    SBC: Sysmed Inc.            Topic: N/A

    THIS PROJECT IS TO PRODUCE A SHORT SECTION OF A DC PAR- TICLE ACCELERATOR TUBE INCORPORATING SEVERAL IMPROVEMENTS. THE ELECTRODES WILL HAVE A CONTINUOUS CURVATURE OF LARGE RADIUS, SO AS TO PROVIDE ELECTROSTATIC SHIELDING FOR THE SEPARATING INSULATOR WITHOUT PRODUCING THE LARGE, LOCAL ELECTRIC FIELD ENHANCEMENTS TYPICAL OF DISHED ELECTRODES. THE ACCELERATING APERTURE OF THESE ELECTRODES WILL BE CHO ...

    SBIR Phase II 1986 Department of Energy
  6. CULTURE WOODY PLANTATIONS IN THE LAKE STATES

    SBC: Woodland Services, Inc.            Topic: N/A

    THIS PROJECT WILL CONSTRUCT AND TEST A PROTOTYPE MACHINE FORHARVESTING SHORT ROTATION INTENSIVE CULTURE WOODY PLANTATIONS IN THE LAKE STATES AREA. THIS HARVESTING CONCEPT IS ACCOMPLISHED IN TWO STEPS. THE FIRST STEP SEVERSTHE STEM FROM THE STUMP AND PILES THE STEMS IN A MINI WINDROW FOR AIR DRYING. THE SECOND STEP RECOVERS THE STEMS FROM THE GROUND AND PROCESSES THEM INTO WOOD CHIPS FOR TRANSPORTA ...

    SBIR Phase I 1986 Department of Energy
US Flag An Official Website of the United States Government