You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low-Cost Integrated Valve/Injectors for Bipropellant Thrusters

    SBC: BLAINE WRIGHT, INC.            Topic: MDA05067

    The most significant hardware costs on a missile interceptor propulsion system are associated with the thrusters, for which there are typically four divert thrusters and four, six, or eight attitude control thrusters per interceptor. The largest contributor to the thruster cost is the integrated valve/injector. Integration of the valve and injector into a single body provides the benefits of low d ...

    SBIR Phase II 2011 Department of DefenseMissile Defense Agency
  2. Rectifying Junctions for High Temperature, High Power Electronics

    SBC: 3c Semiconductors            Topic: N/A

    The single most important type of metal/SiC junction is the n-type, rectifying Schottky diode, because it is the voltage blocking junction in all majority carrier devices. A reliable junction of this type for n-type SiC is the key to its development for high temperature, power conditioning electronics. Phase I will demonstrate that osmium is the ideal metal for forming such junctions. Phase II wil ...

    SBIR Phase II 1996 Department of DefenseMissile Defense Agency
  3. Liquid Melt Focused Beam Spray Process

    SBC: RESODYN CORPORATION            Topic: N/A

    The innovation presented in this proposal involves the use of a liquid melt thermal spray process for cost effective rapid prototyping of near-net shape tooling for the lay up of advanced composite materials. The process uses a focused beam of charged liquid droplets to form tooling directly from three-dimensional computer generated drawings eliminating traditional steps associated with fabricatio ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  4. Implementation of High-GHz-to-THz Optical Data Links

    SBC: TEMPLEX TECHNOLOGY CORP.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government