You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low-Cost Integrated Valve/Injectors for Bipropellant Thrusters
SBC: BLAINE WRIGHT, INC. Topic: MDA05067The most significant hardware costs on a missile interceptor propulsion system are associated with the thrusters, for which there are typically four divert thrusters and four, six, or eight attitude control thrusters per interceptor. The largest contributor to the thruster cost is the integrated valve/injector. Integration of the valve and injector into a single body provides the benefits of low d ...
SBIR Phase II 2011 Department of DefenseMissile Defense Agency -
Low-Cost Integrated Valve/Injectors for Bipropellant Thrusters
SBC: BLAINE WRIGHT, INC. Topic: MDA05067The most significant hardware costs on a missile interceptor propulsion system are associated with the thrusters, for which there are typically four divert thrusters and four, six, or eight attitude control thrusters per interceptor. The largest contributor to the thruster cost is the integrated valve/injector. Integration of the valve and injector into a single body provides the benefits of low d ...
SBIR Phase II 2007 Department of DefenseMissile Defense Agency -
Ballistic Missile Defense Anti-Tamper Coating Manufacturing
SBC: RESODYN CORPORATION Topic: MDA06051The implementation of anti-tamper (AT) technology as one vital strategy for preserving US military superiority. (Communiqué DoD 5200.1-M) In response to this need, many AT technologies have been developed including AT coatings for securing electronic components and devices. However, the use of successful AT coatings is impeded by lack of a manufacturing process that: 1.) Possesses the capacity ...
SBIR Phase I 2007 Department of DefenseMissile Defense Agency -
Liquid Melt Focused Beam Spray Process
SBC: RESODYN CORPORATION Topic: N/AThe innovation presented in this proposal involves the use of a liquid melt thermal spray process for cost effective rapid prototyping of near-net shape tooling for the lay up of advanced composite materials. The process uses a focused beam of charged liquid droplets to form tooling directly from three-dimensional computer generated drawings eliminating traditional steps associated with fabricatio ...
SBIR Phase I 1996 Department of DefenseMissile Defense Agency