You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Deployable Hypersonic Antenna Assembly (DHAA)
SBC: Exo-Atmospheric Technologies LLC Topic: N222128The objective of Phase I is to determine an optimal antenna array design and frequency band of operation to achieve reliable communication in the presence of plasma from glide body separation to terminal phase. Candidate designs will be identified and analyzed in Phase I and will be prototyped and tested in Phase II. Exo-Atmospheric Technologies will develop a simple, lightweight Deployable Hype ...
SBIR Phase I 2023 Department of DefenseNavy -
Optimal Geophone Arrays and 3D Seismic Tomography with Physics-Informed Neural Networks for Subterranean Shipyard Mapping
SBC: SYNTHETIK APPLIED TECHNOLOGIES LLC Topic: N224129Obtaining an accurate map and assessment of subterranean site conditions is an important component of geotechnical engineering. However, despite recent advances in seismic imaging and tomography this is still very much an open problem and one that can lead the use of large factors of safety and can result in substantial additional project costs and delays as geophysical features may be unexpectedl ...
SBIR Phase I 2023 Department of DefenseNavy -
Software Incident Report Capture and Scripting
SBC: ALTRON, INC. Topic: N231029Complex Naval control systems go through numerous rounds of rigorous testing often spanning multiple years. As testers execute formalized assessments during these test events, issues arise, and the issues are documented in software problem reports (SPRs). Multiple factors may limit the ability of a tester to properly document issues for future replication or investigation, such as the rapid pace ...
SBIR Phase I 2023 Department of DefenseNavy -
Integrated Digital Ignition Device (IDID)
SBC: Exo-Atmospheric Technologies LLC Topic: N211020Legacy rocket launch systems rely on analog electromechanical intervalometers to provide reliable, precise timing of rocket launch events via squibs or electro-explosive devices (EEDs) while maintaining necessary requirements for ARM, LOAD, and FIRE events on launch systems such as the LAU-68 or LAU-131. Current analog intervalometer designs require use of mechanical timing and indexing switches t ...
SBIR Phase II 2023 Department of DefenseNavy -
Long-Wave Infrared Transceivers for High Speed Free Space Optical Communications in Adverse Weather Conditions
SBC: INTRABAND, LLC Topic: N211015Given the ever-growing need for high-data rate, low-latency, secure, wireless communications driven by applications ranging from vehicle automation to ad-hoc battlefield command and control, free-space optical (FSO) communication links operating outside of the regulated and crowded radio-frequency (RF) bands are increasingly in demand. Recent research has verified that there are advantages to usin ...
SBIR Phase II 2023 Department of DefenseNavy -
Integrated Carbon-Carbon Ultrasonic Recession Sensor
SBC: Exo-Atmospheric Technologies LLC Topic: N202129Submarine-launched ballistic missile (SLBM) re-entry vehicles (RV), with carbon-carbon nosetips undergo significant aerothermal ablation during atmospheric re-entry. Diagnostics are needed to measure recession rates and shape change to validate aerodynamic performance. Numerous approaches have been utilized to instrument nosetips but legacy technologies have not been flown in decades and there ...
SBIR Phase II 2022 Department of DefenseNavy -
Real-time Insights for Combat System Integration and Testing
SBC: ALTRON, INC. Topic: N201050Numerous government agencies and commercial organizations are dependent on mission critical ecosystems (i.e. federated systems of systems [SoS]). Integration, testing, and certification (IT&C) of these ecosystems are required before fielding production ready systems. These activities are time consuming and costly, ultimately inhibiting the ability to rapidly update these systems. Additionally, sy ...
SBIR Phase II 2022 Department of DefenseNavy -
Shipboard Advanced Metal Manufacturing Machine Development
SBC: VRC Metal Systems, LLC Topic: N221040A Parallel Integrated Manufacturing System (PIMS) that combines robotic additive and subtractive manufacturing to deliver ready-to-use, net-shape parts, at the point of need, is proposed by VRC Metal Systems, LLC, as the solution to DON’s request for developing a Shipboard Advanced Metal Manufacturing Machine. This hybrid AM system solution will primarily combine additive & subtractive functions ...
SBIR Phase I 2022 Department of DefenseNavy -
Post assembly balancing of Y-Branch splitters used in IFOG sensors
SBC: ADVR, INC. Topic: N221078In this SBIR program, AdvR will develop a new feature in Y-branch dual phase modulator IOCs which enables fine tuning of the split ratio after assembly. The proposed approach utilizes existing technology with a long flight heritage in tactical gyroscopes to create a tunable section which is localized, finely adjustable and permanent after tuning. Preliminary modeling indicates the target perfo ...
SBIR Phase I 2022 Department of DefenseNavy -
MAGSPEED: Magnetic Anomaly Ground Speed Measurement
SBC: NAVIGATIONIS INC Topic: N221046Exploitation of tiny anomalies in the Earth's Magnetic Field to provide navigational alternatives to satellite-based navigation is an active field of research. However, a major performance limitation remains: the lack of detailed anomaly maps to provide performance at the level of GPS. This proposal responds to the Navy solicitation for covert alternatives to current velocity over ground measurem ...
SBIR Phase I 2022 Department of DefenseNavy