You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Enhancing the User"s Experience in an Amputee Virtual Environment Support Space

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: OSD11H04

    The major goal of this project is to develop an integrated system for enhancing a war fighter"s experience in an Amputee Virtual Environment Support Space. The concept demonstration delivered to the sponsor at the conclusion of this Phase-I will show the sponsor that we have developed techniques for innovatively connecting COTS products and advanced behavior recognition techniques to enable non-v ...

    SBIR Phase I 2011 Department of DefenseDefense Health Agency
  2. An Integrated Decision Support Framework for Sustainability CAE

    SBC: BIMCON Inc.            Topic: 9050273R

    The objective of this proposal is to establish the feasibility of developing an integrated decision support framework that transforms the current time-consuming and reactive (post completion of final design) sustainability assessment into a proactive CAE approach that enables the ability to revise designs based on performance against selected sustainability targets in the product design process, i ...

    SBIR Phase I 2011 Department of CommerceNational Institute of Standards and Technology
  3. Decision Support Tools for Sustainable Manufacturing

    SBC: BIMCON Inc.            Topic: 907012R

    Our vision is that of an integrated decision support solution that transforms the current time-consuming and reactive (post-design) sustainability assessment of a product into a proactive approach available in the early design phases. This solution called Sustainability Integrated into Early Design (SIED) will deliver lifecycle sustainability data into early design processes and focus primarily on ...

    SBIR Phase II 2011 Department of CommerceNational Institute of Standards and Technology
  4. Medical Capability Simulator Interface Tool for OneSAF

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: OSD09H16

    OneSAF is rapidly becoming a centerpiece for many training simulations in the Army, amongst other reasons, for its ability to interoperate with many different protocols and packages. It only makes sense, given this central position, to examine the possibility of connecting the myriad of medical training systems to OneSAF, to see what emerges. To realize this possibility, a standard means of conn ...

    SBIR Phase II 2011 Department of DefenseDefense Health Agency
  5. A Vibrationally-enhanced Aquaculture Treatment System (VEATS) for Water Reuse and Effluent Management

    SBC: RESODYN CORPORATION            Topic: 842

    Because of the severe impact of diseases on production and the environmental devastation created by many commercial aquaculture effluents, modern methods of intensive aquaculture are evolving which rely heavily on recirculating the water. This proposal addresses the need for a modular, integrated technology in closed-loop aquaculture operations by enhancing the performance of a fluidized ion exch ...

    SBIR Phase I 2004 Department of Commerce
US Flag An Official Website of the United States Government