You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Demonstration of Image-Based Change Detection Using a Prototype Drone-Based Track Safety Inspection System
SBC: Noble Drone Services, LLC Topic: 180FR4Demonstration of Image-Based Change Detection using a Prototype Drone-Based Track Safety Inspection 3/16/2018 Today’s prevailing methods of visual track inspection tend to be expensive, disruptive to operations, and have potential to be less thorough than preferred. Machine vision technology emerged in the rail sector over a decade ago to help alleviate these concerns; however, due to the un ...
SBIR Phase I 2018 Department of Transportation -
Non-Destructive Coercimetry Fracture Toughness Assessment for Steel Pipelines
SBC: INNERSPEC TECHNOLOGIES, INC. Topic: 180PH1NON-DESTRUCTIVE COERCIMETRY FRACTURE TOUGHNESS ASSESSMENT FOR STEEL PIPELINES 3/8/2018 COMET’s main objective is to develop the first coercimetry-based fracture toughness assessment solution. Phase I will demonstrate the technical and economic feasibility of a non-destructive testing solution, based on coercivity metering, to assess material fracture toughness of steel pipelines; evaluating t ...
SBIR Phase I 2018 Department of Transportation -
Graspable Math Activities
SBC: GRASPABLE INC Topic: 91990018R0006Through previous grant awards from IES, researchers developed Graspable Math, a tablet-based intervention where middle and high school students create and manipulate complex expressions for basic operations as well as equations and equations systems and inequalities. In this project, the team will develop a prototype of Graspable Math Activities, an app with novel kinds of algebra practice and ass ...
SBIR Phase I 2018 Department of EducationInstitute of Education Sciences -
Go Write
SBC: ATTAINMENT CO., INC. Topic: 91990018R0006In this project, the team will develop a prototype of GoWrite, a platform designed for students with moderate to severe disabilities to guide instruction in writing. The cross-curricular intervention will have four modes including instruction, writing about academic content, journaling, and social media. At the end of Phase I, in a pilot study with 30 students (10 each in grade school, middle scho ...
SBIR Phase I 2018 Department of EducationInstitute of Education Sciences -
Intellifusion- A System for Augmenting Inductive Loop Vehicle Sensor Data with SPAT and GrID (MAP) via Data Fusion
SBC: HARMONIA HOLDINGS GROUP, LLC Topic: 111FH2Our goal is to create a demonstrable prototype system at the end of Phase I which fuses IntelliDrive (SM) data with data from traditional inductive loop detectors and uses this data in a modified NEMA TS2 traffic signal controller within eTEXAS Model for Intersection Traffic to reduce traffic delay at intersections. Our work will improve the safety of intersections and improve the mobility of traffic through adaptive traffic control which uses data produced by IntelliFusion, the product of our research. The process of data fusion involves merging data obtained fr
SBIR Phase I 2011 Department of Transportation