You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. vArmor: Identifying and Guarding Security-Critical Data in COTS Applications

    SBC: ZeroPoint Dynamics LLC            Topic: SB173003

    Over a decade ago, security practitioners highlighted threats posed by memory corruption exploits subverting systems through manipulation of security-critical non-control-data — without ever corrupting application control-flow. Since that demonstration, however, the full power of data-oriented attacks went largely unnoticed until very recently. One reason for this recent emergence is that exploi ...

    SBIR Phase I 2018 Department of DefenseDefense Advanced Research Projects Agency
  2. GR-TDM: A Framework for Design Space Exploration of Hardware Trojan Detection and Mitigation Tradeoffs

    SBC: GRAF RESEARCH CORPORATION            Topic: SB173004

    As integrated circuit dimensions shrink and U.S. fabrication facilities age, U.S. ASIC developers are increasingly turning to overseas foundries for the latest process nodes in device fabrication.This migration is especially impactful for DoD designers as critical military technology needs to be trusted and offshore fabrication has the potential to expose chips to malice during manufacture.Sensiti ...

    SBIR Phase I 2018 Department of DefenseDefense Advanced Research Projects Agency
  3. Flying Missile Rail and High-Rate Production

    SBC: CORNERSTONE RESEARCH GROUP INC            Topic: SB173005

    CRG proposes to leverage its partnerships, advanced aerospace system design capabilities, and unique manufacturing technologies to design, build and demonstrate a flying missile rail along with the high-rate production technologies required to meet DARPAs objectives of 500 units per month, within one month.CRG will focus on high-rate manufacturing technologies currently in use within the automotiv ...

    SBIR Phase I 2018 Department of DefenseDefense Advanced Research Projects Agency
  4. Design of and Rapid Manufacturing Technology for a Flying Missile Rail

    SBC: Lulaza Aerospace LLC            Topic: SB173005

    Lulaza Aerospace LLC proposes to study the design and rapid manufacture of a “Flying Missile Rail,” an autonomous UAV carried beneath a fighter that can release an AIM-120 missile from captive carry, or alternately can fly away from the fighter to maneuver and/or extend the range of the missile. This air-launched UAV can also carry and launch the Small Diameter Bomb or special payload pod. Thi ...

    SBIR Phase I 2018 Department of DefenseDefense Advanced Research Projects Agency
  5. Graspable Math Activities

    SBC: GRASPABLE INC            Topic: 91990018R0006

    Through previous grant awards from IES, researchers developed Graspable Math, a tablet-based intervention where middle and high school students create and manipulate complex expressions for basic operations as well as equations and equations systems and inequalities. In this project, the team will develop a prototype of Graspable Math Activities, an app with novel kinds of algebra practice and ass ...

    SBIR Phase I 2018 Department of EducationInstitute of Education Sciences
  6. Developmentally Appropriate Technology for Science Assessment in Early Elementary Grades

    SBC: 3-C Institute for Social Development, Inc.            Topic: 99190018R0006

    In this project, researchers will develop a prototype of Science Quest, a tool to assess the science skills and understanding for students in grades 1 to 3. The prototype will deliver psychometrically validated assessment items in a game-like format. Educators will be able to assign and monitor completion of science assessments, view assessment results in real-time with reports at the individual a ...

    SBIR Phase I 2018 Department of EducationInstitute of Education Sciences
  7. Flexible Conformal Ultrasound Arrays for Imaging and Modulation

    SBC: PRIXARC LLC            Topic: SB173001

    This project will address the need for reliable and robust wearable ultrasound system for both imaging and modulation in challenging environments such as ambulances, emergency rooms, battlefields, and industrial facilities by using the concept of autonomy. Specifically, we will develop autonomous wearable systems that integrate ultrasound imaging and modulation subsystems within a single cognitive ...

    SBIR Phase I 2018 Department of DefenseDefense Advanced Research Projects Agency
  8. Handheld Apps for Warfighters

    SBC: UES INC            Topic: SB102002

    An Android based solution for presenting the Radio Telephone Operator (RTO) with a graphical view of the radio frequency (RF) field intensity distribution in urban environments is proposed. The field distribution is presented as a semi-transparent overlay to a satellite image. The solution will provide the RTO with a tool for selecting the best transmitter location based on knowledge of nearby R ...

    SBIR Phase I 2011 Department of DefenseDefense Advanced Research Projects Agency
  9. Graphene synthesis on large-area silicon wafers suitable for manufacture

    SBC: GROUP 4 DEVELOPMENT LIMITED LIABILITY COMPANY            Topic: SB102004

    This proposal investigates methods for graphene synthesis on Si (001) orientated substrates to enable high-volume production of graphene transistors and circuits. The proposed approach to generate a surface with the proper symmetry for graphene epitaxy is to deposit symmetry transformation layers (STL) of hexagonal-symmetry materials onto Si (001) substrates that will either facilitate the direct ...

    SBIR Phase I 2011 Department of DefenseDefense Advanced Research Projects Agency
  10. High Speed Naval Surface Munition

    SBC: Donald L. Blount and Associates, Inc.            Topic: SB103008

    SB103-008 has the objective to develop a high speed, semi-autonomous, naval surface munition designed to travel in water at speeds in excess of 100 knots to acoustically track and engage swarms of enemy boats up to 3 miles from the munition launch point. The munition is designed to fit within the footprint of an"A-size"sonobuoy. The proposed CONOPS results in multiple operating regimes: Sub- ...

    SBIR Phase I 2011 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government