You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  2. Reducing Traffic Pressure During Hazmat Incidents By Utilizing Situation Awareness Capabilities

    SBC: Drakontas LLC            Topic: N/A

    This proposal responds to DOT topic 081-PH2 "Hazardous Materials (Using Handheld Devices to Assist in Emergency Response to Hazardous Materials Incidents)." The significant innovation in this project involves extending cutting edge tools developed to enhance situation awareness among first responders with appropriate hazmat and traffic information to create a framework for interperting traffic re ...

    SBIR Phase I 2008 Department of Transportation
  3. New In-field Composite Repair Techniques for Transmission or Distribution Pipelines

    SBC: Odyssian Technology, L.L.C.            Topic: N/A

    Composite in-field pipeline repair technology is proposed that builds upon recent advances in composite repair techniques. Alternative composite materials and processes are proposed that will substantially ease in-field repair and reduce the time personnel are exposed to potentially adverse environmental conditions. Also proposed is a sensor leak detection system that can be optionally installed ...

    SBIR Phase I 2008 Department of Transportation
  4. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: N/A

    Cities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...

    SBIR Phase I 2008 Department of Transportation
  5. A Miniature Non-Contact Rail Temperature Sensor

    SBC: En'urga Inc.            Topic: 081FR2

    The Phase I SBIR project will evaluate the feasibility of utilizing a low cost sensor to obtain rail temperatures from a moving train. The two innovative parts of the proposed sensor are (1) a rugged four wavelenght high frequency sensor that accurately measures the natural radiation emitted by the rails, and (2) an advanced algorithm that provides a emissivity compensated temperature from these ...

    SBIR Phase I 2009 Department of Transportation
  6. Creating Spatial Disorientation in Flight Simulation

    SBC: CONTINUUM DYNAMICS INC            Topic: 122FA1

    Training in the symptoms of Spatial Disorientation (SD) has shown to be valuable in aiding pilots to recognize its onset and provide a means for mitigating its effects, but such demonstrations have traditionally been associated with specialized equipment and devices. Since the vast majority of pilots for the commercial aviation jet fleet are trained (or recertified) on 6-degree-of-freedom (DOF) h ...

    SBIR Phase I 2013 Department of Transportation
US Flag An Official Website of the United States Government