You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Access Control and Personnel ID Verification for Training Applications Utilizing Smart Cards

    SBC: TECHNOLOGY SERVICE CORP.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseNavy
  2. Advanced Chip Integration for Enhanced Arrays

    SBC: INDIANA INTEGRATED CIRCUITS LLC            Topic: AF131098

    ABSTRACT: Improvements such as increased array size and better non-uniformity correction have been made to resistive emitter arrays fabricated on silicon (Si). There exist additonal wavelengths of interest whose emitter devices require fabrication in other materials, such as gallium arsenide (GaAs). For both Si and GaAs substrate materials, attempts to"tile"small arrays into larger ones for reaso ...

    SBIR Phase I 2013 Department of DefenseAir Force
  3. Advanced Combustion Stability Analysis Tools for Ox-rich Preburners

    SBC: SIERRA ENGINEERING, INC.            Topic: AF083112

    The goal of this SBIR is the enhancement of the current state-of-the-art combustion instability analysis tools.  The planned enhancement is focused on capturing the effects of injection element distribution and the inclusion of substantial film cooling and diluent injection.  These characteristics are extremely important in the design of high-pressure oxygen rich staged combustion (ORSC) engines ...

    SBIR Phase I 2009 Department of DefenseAir Force
  4. Advanced Lithium-ion Modular Energy Storage Batteries

    SBC: K2 ENERGY SOLUTIONS, INC.            Topic: N091053

    K2 Energy Solutions, Inc. will address the Navy’s energy storage requirements by designing and fabricating a modular battery system similar to those the company has already developed for high performance electric vehicles. K2 develops and manufactures advanced lithium-ion energy storage systems based on intrinsically safe and inexpensive lithium iron phosphate cathode materials.

    SBIR Phase I 2009 Department of DefenseNavy
  5. Advanced Modular, Energy Storage Technology

    SBC: ALTAIRNANO, INC.            Topic: N091053

    The SBIR Phase I proposal is designed to improve the high end temperature performance of Altairnano''''s nano Lithium titanate batteries and will develop an equivalent circuit model capturing the transient dynamics of Altairnano’s 50 Ah cell. Altairnano will study the effects of various materials and the interactions between them to determine the best electrode material combination in order to e ...

    SBIR Phase I 2009 Department of DefenseNavy
  6. Advanced Propulsion and Power Concepts for Large Size Class Unmanned Aerial Systems (UAS)

    SBC: ENGINE RESEARCH ASSOCIATES INC            Topic: AF131160

    ABSTRACT: Desired tactical requirements for unmanned aerial systems (UASs) exceed current capabilities for performance, reliability, maintainability, cost and supportability. Mission requirements such as extended endurance, increased power for auxiliary/sensor systems, and low altitude, low speed maneuverability are becoming paramount, specifically, in the 10,000 lb class of vehicles. These desi ...

    SBIR Phase I 2013 Department of DefenseAir Force
  7. Advanced Technologies for Discrete-Parts Manufacturing

    SBC: MANUFACTURING LABORATORIES, INC.            Topic: DLA08001

    Significant advances have been made in machining technology, most notably machining centers capable of spindle speeds and feedrates that are an order of magnitude higher than conventional. However, the use of this new technology requires much more technical expertise, and experience and intuition are no longer sufficient. Specifically, machine tool productivity can be greatly enhanced if informati ...

    SBIR Phase I 2009 Department of DefenseDefense Logistics Agency
  8. Affordable Wideband Radar Receiver

    SBC: TECHNOLOGY SERVICE CORP.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseNavy
  9. A Miniature Non-Contact Rail Temperature Sensor

    SBC: En'urga Inc.            Topic: 081FR2

    The Phase I SBIR project will evaluate the feasibility of utilizing a low cost sensor to obtain rail temperatures from a moving train. The two innovative parts of the proposed sensor are (1) a rugged four wavelenght high frequency sensor that accurately measures the natural radiation emitted by the rails, and (2) an advanced algorithm that provides a emissivity compensated temperature from these ...

    SBIR Phase I 2009 Department of Transportation
  10. AN EDDY-CURRENT MODEL FOR THREE-DIMENSIONAL NONDESTRUCTIVE EVALUATION OF ADVANCED COMPOSITES

    SBC: Sabbagh Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
US Flag An Official Website of the United States Government