You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Access Control and Personnel ID Verification for Training Applications Utilizing Smart Cards

    SBC: TECHNOLOGY SERVICE CORP.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseNavy
  2. Advanced Chip Integration for Enhanced Arrays

    SBC: INDIANA INTEGRATED CIRCUITS LLC            Topic: AF131098

    ABSTRACT: Improvements such as increased array size and better non-uniformity correction have been made to resistive emitter arrays fabricated on silicon (Si). There exist additonal wavelengths of interest whose emitter devices require fabrication in other materials, such as gallium arsenide (GaAs). For both Si and GaAs substrate materials, attempts to"tile"small arrays into larger ones for reaso ...

    SBIR Phase I 2013 Department of DefenseAir Force
  3. Advanced Combustion Stability Analysis Tools for Ox-rich Preburners

    SBC: SIERRA ENGINEERING, INC.            Topic: AF083112

    The goal of this SBIR is the enhancement of the current state-of-the-art combustion instability analysis tools.  The planned enhancement is focused on capturing the effects of injection element distribution and the inclusion of substantial film cooling and diluent injection.  These characteristics are extremely important in the design of high-pressure oxygen rich staged combustion (ORSC) engines ...

    SBIR Phase I 2009 Department of DefenseAir Force
  4. Advanced Development for Defense Science and Technology

    SBC: TANAGRAM PARTNERS            Topic: SB082007

    The research objectives of Aiding Complex Decision-Making Through Augmented Reality (SBIR Phase 1) address real world issues found in complex, high-stress, mobile environments that require rich information in order to reduce error and make informed decisions. Such systems are made up of several interacting components requiring collaborative situational awareness in a dynamic environment. Complexit ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  5. Advanced Development for Defense Science and Technology: Measurement Tools for Quantum Information Processing

    SBC: NUCRYPT LLC            Topic: SB082007

    Quantitative and visually intuitive information is critical to understanding, designing, and verifying the operation of any system. For instance, a vector signal analyzer allows a designer to gain an immediate understanding of a radio communications link by visualizing the transmission signal constellation. Additional analysis such as a calculation of the error vector magnitude can be performed in ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  6. Advanced EOC Cushioning Units with Electrically Activated Lockout

    SBC: Sharma & Associates, Inc.            Topic: N/A

    Not Available Austral Engineering and Software, Inc. proposes to develop a methodology and computer tool that uses experimental data to create high-fidelity models for unsteady aerodynamic loading. This approach addresses the need for advanced models that accurately represent loading responses of air vehicles under varied flight conditions. This is particularly important for cost-effective develo ...

    SBIR Phase I 1999 Department of Transportation
  7. Advanced Lithium-ion Modular Energy Storage Batteries

    SBC: K2 ENERGY SOLUTIONS, INC.            Topic: N091053

    K2 Energy Solutions, Inc. will address the Navy’s energy storage requirements by designing and fabricating a modular battery system similar to those the company has already developed for high performance electric vehicles. K2 develops and manufactures advanced lithium-ion energy storage systems based on intrinsically safe and inexpensive lithium iron phosphate cathode materials.

    SBIR Phase I 2009 Department of DefenseNavy
  8. Advanced Modular, Energy Storage Technology

    SBC: ALTAIRNANO, INC.            Topic: N091053

    The SBIR Phase I proposal is designed to improve the high end temperature performance of Altairnano''''s nano Lithium titanate batteries and will develop an equivalent circuit model capturing the transient dynamics of Altairnano’s 50 Ah cell. Altairnano will study the effects of various materials and the interactions between them to determine the best electrode material combination in order to e ...

    SBIR Phase I 2009 Department of DefenseNavy
  9. Advanced Multi-Function Head-Up Display

    SBC: FLIGHT VISIONS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseAir Force
  10. Advanced Propulsion and Power Concepts for Large Size Class Unmanned Aerial Systems (UAS)

    SBC: ENGINE RESEARCH ASSOCIATES INC            Topic: AF131160

    ABSTRACT: Desired tactical requirements for unmanned aerial systems (UASs) exceed current capabilities for performance, reliability, maintainability, cost and supportability. Mission requirements such as extended endurance, increased power for auxiliary/sensor systems, and low altitude, low speed maneuverability are becoming paramount, specifically, in the 10,000 lb class of vehicles. These desi ...

    SBIR Phase I 2013 Department of DefenseAir Force
US Flag An Official Website of the United States Government