You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Low Cost Sensor for Mid-Chord Offset Measurements

    SBC: En'urga Inc.            Topic: 141FR1

    This Phase I SBIR project will evaluate the feasibility of utilizing low cost and high accuracy local position sensors and transmitters to autonomously estimate Mid-chord offset in rails. The two innovative parts of the proposed system are (1) a set of miniature and highly accurate local position sensors and transmitters for estimating the absolute positions of the mid point and end points of a 62 ...

    SBIR Phase I 2014 Department of Transportation
  2. A Miniature Non-Contact Rail Temperature Sensor

    SBC: En'urga Inc.            Topic: 081FR2

    The Phase I SBIR project will evaluate the feasibility of utilizing a low cost sensor to obtain rail temperatures from a moving train. The two innovative parts of the proposed sensor are (1) a rugged four wavelenght high frequency sensor that accurately measures the natural radiation emitted by the rails, and (2) an advanced algorithm that provides a emissivity compensated temperature from these ...

    SBIR Phase I 2009 Department of Transportation
  3. Creating a Global Infrastructure for Virtual Aids to Navigation (V-ATON)

    SBC: WisdomTools Enterprises Inc            Topic: N/A

    Not Available Today's dense and rapidly evolving threat environments have increased the requirements that are being placed on tools necessary for characterizing urban electromagnetic (EM) environments. Although effective tools for urban EM environment characterization exist for simple 2-D models, the more challenging problem of characterizing the EM environment of a large densely populated region ...

    SBIR Phase I 1999 Department of Transportation
  4. Graph-Matching Accelerator (GMA)

    SBC: EXOGI LLC            Topic: SB082024

    We propose to explore the applicability of COTS general-purpose graphics processing units (GPGPU) to approximate graph matching problems, in order to dramatically improve the speed and utility of DoD-relevant processing areas such as machine vision, target recognition and social network analysis.

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  5. Explosion-Proof Solid State Lighting Fixture for Extreme Environments

    SBC: TECHSHOT, INC.            Topic: SB082054

    The SHOT Explosion Proof Solid State Lighting Fixture (EPSSLF) is the "next generation" explosion proof fixture incorporating state-of-the-art, high output LED's. A properly sized LED light grid and associated power controller card will guarantee a long, maintenance free life at least 50 times longer than the current incandescent lamp. The SHOT system takes advantage of the currently approved fo ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  6. Small Engines Designed for High Efficiency, High Power Density and Quiet Operations

    SBC: ENGINE RESEARCH ASSOCIATES INC            Topic: SB082010

    This program will establish a very quiet, fuel efficient and high power density engine and generator that can operate on JP-8 and diesel. It will be significantly lighter than existing engines and generators. The proposed approach will use an internally supercharged variant of the Migrating Combustion Chamber (MCC) engine. This engine’s mechanism and cycle of operation allow it to operator on ...

    SBIR Phase I 2009 Department of DefenseDefense Advanced Research Projects Agency
  7. VCSEL/Waveguide Structures for RF Photonics Applications

    SBC: OPTICOMP CORP.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government