You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Low Cost Sensor for Mid-Chord Offset Measurements

    SBC: En'urga Inc.            Topic: 141FR1

    This Phase I SBIR project will evaluate the feasibility of utilizing low cost and high accuracy local position sensors and transmitters to autonomously estimate Mid-chord offset in rails. The two innovative parts of the proposed system are (1) a set of miniature and highly accurate local position sensors and transmitters for estimating the absolute positions of the mid point and end points of a 62 ...

    SBIR Phase I 2014 Department of Transportation
  2. A Miniature Non-Contact Rail Temperature Sensor

    SBC: En'urga Inc.            Topic: 081FR2

    The Phase I SBIR project will evaluate the feasibility of utilizing a low cost sensor to obtain rail temperatures from a moving train. The two innovative parts of the proposed sensor are (1) a rugged four wavelenght high frequency sensor that accurately measures the natural radiation emitted by the rails, and (2) an advanced algorithm that provides a emissivity compensated temperature from these ...

    SBIR Phase I 2009 Department of Transportation
  3. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: N/A

    Cities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...

    SBIR Phase I 2008 Department of Transportation
  4. New In-field Composite Repair Techniques for Transmission or Distribution Pipelines

    SBC: Odyssian Technology, L.L.C.            Topic: N/A

    Composite in-field pipeline repair technology is proposed that builds upon recent advances in composite repair techniques. Alternative composite materials and processes are proposed that will substantially ease in-field repair and reduce the time personnel are exposed to potentially adverse environmental conditions. Also proposed is a sensor leak detection system that can be optionally installed ...

    SBIR Phase I 2008 Department of Transportation
US Flag An Official Website of the United States Government