You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Medical Imagery Tailored HEVC (MITH)
SBC: A-TECH CORPORATION Topic: DHP14001DHP is seeking new image compression technologies that will retain diagnostic quality and reduce the burden of digital medical image transmission on the military?s tactical networks. ATA is proposing to tailor the latest state-of-the-art commercial image compression algorithm, the Main Still Picture Profile of the High Efficiency Video Coding (HEVC) standard, for medical imagery. HEVC has been sho ...
SBIR Phase I 2014 Department of DefenseDefense Health Agency -
Collection of Motorcycle Exposure and Crash Factor Data
SBC: AUTONOMOUS INNOVATIONS, INC. Topic: N/AAutonomous Innovations Inc. (AII) proposes to develop a novel comprehensive monitoring system for motorcycles that will monitor vehicle miles traveled (VMT), as well as a varity of physical measurements, to understand the exposure and factors in the increased numbers of accidents among motorcycles riders. All has extensive experience in developing and integrating sensors and data-logging for a va ...
SBIR Phase I 2008 Department of Transportation -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: N/ACities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...
SBIR Phase I 2008 Department of Transportation