You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Buoy Guard System
SBC: McQ Inc. Topic: 932WMcQ will develop a complete conceptual design for a Buoy Guard System (BGS). This system will detect the presence of intruders at and on the buoy. It will initiate deterrent actions to persuade and force the intruders away from the buoy. It will also collect imagery and other data about the intruders and about their activities associated with the buoy. This data, along with the basic warning w ...
SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
Development of Middle School and High School STEM Programs in ITS and CV Technologies
SBC: NANOSONIC INC. Topic: 141FH4NanoSonic will work with the Giles County, Virginia,school system,and Leidos, a developer of ITS NanoSonic will work with the Giles County, Virginia,school system,and Leidos,a developer of ITS and CV technologies,to create and deliver a set of STEM lesson plans involving ITS and CV concepts. With Leidos transportation engineers, NanoSonic will identify project ideas,and with Giles County STEM teac ...
SBIR Phase I 2014 Department of Transportation -
Driver Fatigue, Distraction, and Alerting Technology
SBC: Transecurity LLC Topic: N/ATransecurity is a company whose mission is to commercialize technology developed at the Virginia Tech Transportation Institute. VTTI researchers and engineers have made significant breakthroughs in driver monitoring, crash risk assessment, and crash avoidance technology including drowsy driver monitoring and warning systems. Technical solutions under development include machine vision-based lane ...
SBIR Phase I 2008 Department of Transportation -
Improving Commercial Fish Meal Free Aquaculture Diets
SBC: Low Salinity, Inc. Topic: 922FThe current emphasis in fish nutrition is fish meal replacement with a variety of alternative protein sources including plant-based, terrestrial and marine proteins. We propose to focus specifically upon the protein quality of these alternate protein sources and its potential impacts on marine fish production. Animal byproduct meals created through the rendering industry are widely utilized as i ...
SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
In-situ Sensors for Cathodic Protection Interrelationships Modeling
SBC: SENCONTROLOGY, INC. Topic: 132PH2To adequately protect underground pipelines, a coating (including polyurethane foams) must conduct CP current when disbondment occurs. The realization of a reliable, multi-functional process/material system that can ensure urethane foams not only perform in harmony with CP, but establishing the worthiness of their continued use would be of major benefit to the national transportation system. Senc ...
SBIR Phase I 2014 Department of Transportation -
LASER GENERATED SURFACE ACOUSTIC WAVES FOR FLAW DETECTION IN TRANSPORTATION SYSTEMS.
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1984 Department of Transportation -
Non-contact Track Gage Measurement System (NC-TGMS)
SBC: DFUZION, INC. Topic: 081FR4One of the causes of derailments occurs when the track gage is no longer compliant with the FRA track safety standards for gage measurments. Ensuring track gage is in compliance with the FRA track safety standards is therefore of paramount importance to the FRA. Currently, the FRA wishes to develop a non-contact track gage measurement system that overcomes the limitations of current systems (unr ...
SBIR Phase I 2009 Department of Transportation -
Portable Active Thermographic Coating Inspection System
SBC: Fuchs Consulting Inc Topic: 091FH2This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. This system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-she ...
SBIR Phase I 2009 Department of Transportation -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: N/ACities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...
SBIR Phase I 2008 Department of Transportation -
Roadway Waste Heat Electricity Production Using Impoved Roadway Paving Technologies
SBC: Planphoria LLC Topic: 091FH5Planphoria will research, define and develp methods to turn our nation's roadways into a giant energy collection and transference system that produces low cost electrical energy close to point of use. Though roadway environmental conditions change, and different roadway requirements vastly differ from the requirements of other roadways, we will determine the feasibility of this concept by leading ...
SBIR Phase I 2009 Department of Transportation